Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Missouri was posted on August 6, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Turkey Creek WWTP Aeration Renovation 2025

Closed
879State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont, North Carolina, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Additional deliverables include the installation of new gravity sewers and manholes, a generator, odor control equipment, stormwater facilities, and site fencing. The project has an estimated value of $16,690,000 and is set aside for small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts forms. The agreement is governed by EJCDC standard forms, requiring performance and payment bonds and proof of insurance. Performance begins upon a Notice to Proceed, and payment is processed monthly via applications for payment submitted to the Engineer, with payments due 30 days after presentation to the owner. Final acceptance is contingent upon a joint inspection by the Owner, Contractor, and Engineer, the completion of a punch list, and the Engineer's written recommendation for final payment.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is set aside for small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of the bid for reimbursement. Quotes are due by November 17, 2026, at 2:00 PM PT, with the general bid date following on November 18, 2026. Contracting will be based on Garney Standard Purchase Order and Subcontract documents, and any exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 20 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities (Project No. EN19001.03) and Butterfield Lift Station Improvements (Project No. EN26054) located in Chino and Chino Hills, California. The scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 pipelines for the Butterfield Dual Force Main. Additionally, the project requires modifications to the RP-2 Lift Station to accommodate Prado Basin flows, which includes replacing existing pumps with smaller units and constructing an elevated electrical platform to protect equipment from 100-year flood levels. Key electrical deliverables include new SCE electrical services and the installation of a standby generator. Filanc is seeking quotes across a wide range of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and E&IC. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. Bids and proposals are due by October 29, 2025, at 2:00 PM. Primary contact for this opportunity is Julia Masaitis.
Filanc

POSTED

about 1 hour ago

DEADLINE

in about 4 hours

AI Contract Overview

Show more

The contract involves a comprehensive renovation project at the Turkey Creek Wastewater Treatment Plant (WWTP) in Missouri, focusing on replacing existing brushed rotors with an advanced diffused air system. This system will include blowers, air piping, retrievable aeration racks, mixers, electrical components, and various miscellaneous site improvements to enhance the plant's aeration capabilities. The scope of work emphasizes upgrading the aeration infrastructure to improve efficiency and operational performance. The project is valued between $2 million and $5 million, with a solicitation posted on August 6, 2025, and a response deadline set for September 4, 2025. It is managed by the City of Joplin, Missouri, under the NAICS code 237110, which pertains to water and sewer line and related structures construction. Interested parties can find additional details and submit their responses through the designated online portal.

General Info

Documents

12

25PPA-005 Professional Occupational Medical Services Pricing Form

PDF, High priority: read this firstspecifications
High

Bid# 25PPA-005 Professional Occupational Medical Services

PDF, High priority: read this firstrfp
High

RFQ879 Attachment 2 - Price Sheet (Self Propelled Broom)

XLSX, High priority: read this firstbid-schedule
High

RFQ879 Attachment 7 - Product Information Sheet (Self Propelled Broom)

DOCX, High priority: read this firstspecifications
High

RFQ879 - Self Propelled Broom Requirements and Specifications

DOCX, High priority: read this firstsow
High

State of Idaho Contract Terms and Conditions 2024

DOCX, High priority: read this first16 pages · contract-document
High

Turkey Creek WWTP Aeration Renovation 2025 - Invitation to Bid

PDF, High priority: read this firstitb
High

Insurance Requirements for Idaho State Contract 2023

DOCX, Low priority1 page · other
Low

RFQ879 - Attachment 3 - Signature Page (Self-Propelled Broom)

DOCX, Low priorityother
Low

RFQ879 Attachment 6 - Acronym List

DOCX, Low prioritysupporting-document
Low

RFQ879 - Contract Discrepancy Notice - Mechanical Broom

DOCX, Low priorityother
Low

RFQ879 - Deliverable Acceptance Form - Mechanical Broom

DOCX, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Jul 17, 2024 to May 9, 2025. The notice title changed. NAICS code removed. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from May 9, 2025 to Sep 4, 2025. The notice title changed. NAICS code added: 237110. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMissouri → Joplin
ContactsNo contacts available
OfficeN/A
Organization / AgencyMissouri → Joplin
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The work to be performed consists of the replacement brushed rotors with a diffused air system consisting of blowers, air piping, retrievable aeration racks, mixers, electrical, and miscellaneous site work.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS