This Solicitation opportunity from Pennsylvania was posted on May 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

E. Lincoln Ave Watermain Replacement

Closed
Gettysburg Municipal Authority, Adams CountyState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is seeking MBE, DBE, and WBE subcontractors and suppliers for a targeted green-street retrofit project in downtown Romney, West Virginia. The project involves the construction of approximately 343.59 linear feet of South Marsham Street between Gravel Lane and US Route 50. The scope of work includes the installation of 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and necessary drainage, underdrain, inlet, pipe, tie-in, and downspout work. Additionally, the project requires limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor, as well as the planting of six native trees and approximately 345 native plants. The goal is to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area, concluding with final stabilization, cleanup, and restoration. This solicitation is open to various small business concerns, including veteran-owned, service-disabled veteran-owned, HUBZone, disadvantaged, woman-owned, and minority-owned businesses. To accommodate the project scale, these entities are encouraged to form consortiums if individual bid items are too large for a single firm to handle. Bids must be submitted by September 17, 2026, at 4:00 P.M. Interested parties should contact Jonah Leith or Jennifer Wilson for further details and must provide a response indicating their intent to bid.
Harbel, Inc.

POSTED

about 4 hours ago

DEADLINE

in 4 days
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project requires the installation of various large-diameter valves, including contractor-furnished units and Metropolitan-furnished 54-inch and 132-inch valves, as well as 54-inch and 145.5-inch diameter tie-ins. Additional construction elements include four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and associated piping systems. Civil works requirements encompass the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. Issued by James W. Fowler Co., the solicitation is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and woman business enterprises. The bid response deadline is September 29, 2026. The prime contractor is actively seeking subcontractor pricing and encourages the participation of minority, women, and disadvantaged firms, offering assistance with bonding, insurance, and equipment procurement to maximize M/W/DBE involvement. The project also encourages the utilization of apprentices. All work must be performed according to the plans and specifications provided on the James W. Fowler website.
James W. Fowler Co.

POSTED

about 4 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

Online sealed bids for the E. Lincoln Ave Watermain Replacement project in Adams County, Pennsylvania, must be submitted electronically via the PennBid platform by 2:00 p.m. local time on Thursday, June 11, 2026, after which bids will be publicly opened and read. All contract documents are available at no cost through the PennBid portal, and inquiries must be submitted exclusively through its Public Q&A section; no direct communication by phone, fax, or email is permitted. Each bidder must include bid security equal to 10 percent of the bid amount as stipulated in the Instructions to Bidders. The project is classified as a Public Works under the Pennsylvania Prevailing Wage Act, requiring compliance with the wage rates established by the Pennsylvania Secretary of Labor. A mandatory prebid conference is scheduled for Friday, May 29, 2026, at 10:30 a.m. at the Gettysburg Municipal Office, offering bidders an opportunity to meet with the Owner and Engineer. Bids must remain irrevocable for sixty days after opening, or up to one hundred twenty days if award is delayed due to external approvals, bond sales, or grant awards, as mandated by Act 317 of 1978. The award will be made to the lowest responsible bidder under a Lowest Price Technically Acceptable framework, with technical acceptability determined by compliance with all contractual requirements and demonstrated responsibility. All work must conform to the Contract Documents, including specifications for materials, installation, testing, and inspection, which reference standards such as ASTM, NFPA, OSHA, and MILSPEC for insulation, piping, marking, and preservation. Inspection and acceptance occur on-site following rigorous testing protocols, including factory and field evaluations, with the Contractor bearing full responsibility for compliance, corrections, and submittals. Key deliverables include shop drawings, daily logs, certificates of compliance, and operation and maintenance data, all subject to Engineer review. Bidders must submit a Non-Collusion Affidavit affirming no bid rigging and disclose any prior legal violations within the last four years, along with a completed Bidder’s Experience Form covering corporate structure and licensing. Equipment must be new, unused, and warranted, with materials required to be free of asbestos, lead, mercury, and CFC/HCFC blowing agents, and chlorides below 50 ppm when in contact with stainless steel. Packaging and labeling requirements are stringent, with specific standards for material thickness, color

General Info

Gettysburg seeks online sealed bids for Twin Oaks Pump Station replacement, general and electrical contracts.

Agency

Pennsylvania → Adams CountyView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Adams County, PA, USA

Set-Aside

NONE

Documents

(6)

E. Lincoln Ave Watermain Replacement - Gettysburg Municipal Authority Advertisement for Bids

PDFrfb

E. Lincoln Ave Watermain Replacement Bid Documents

PDFbid-documents

Twin Oaks Pump Station Replacement Bid Documents

PDFbid-documents

E Lincoln Ave Watermain Replacement Contract Drawings

PDFcontract-drawings

Twin Oaks Pump Station Replacement Contract Drawings 75884-8E

PDFcontract-drawings

Twin Oaks Pump Station Replacement - Advertisement for Bids

PDFadvertisement-for-bids

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Amendment 1

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Adams County
ContactsNo contacts available
OfficeAdams County, PA, USA
Organization / Agency
Pennsylvania → Adams County
View Agency Profile
Office AddressAdams County, PA, USA
ContactsNo contact information available

Interested Companies (140)

Show more
Kinsley Construction
J. M. Gangloff Roofing
A.T.O. Excavating

See All 140 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Online sealed bids for the construction of E. Lincoln Ave Watermain Replacement will be received by Gettysburg Municipal Authority via the PennBid Program (pennbid.bonfirehub.com) until Thursday, June 11, 2026 at 2:00 p.m. local prevailing time; at which time said bids will be publicly opened and read aloud.
Copies of the Contract Documents may be obtained at no cost at pennbid.bonfirehub.com.
All questions about the meaning or intent of the Contract Documents shall be submitted through PennBid's Public Q&A section. No questions will be accepted by phone, fax, or direct e-mail.
Each bidder must deposit, with the bid, Security in the amount of ​10​ percent of the bid and subject to the conditions provided in the Instructions to Bidders.
The work in connection with this project constitutes a Public Works by a Public Body under Pennsylvania Prevailing Wage Act. Bidders are advised that prevailing minimum wage rates, promulgated by the Pennsylvania Secretary of Labor, which must be paid to workmen employed on this project, are incorporated in the Contract Documents.
A Prebid Conference will be held at the Gettysburg Municipal Office at ​424 East Middle Street​, ​Gettysburg, PA 17325​ on ​Friday, May 29, 2026​ at 10:30 a.m. Prospective bidders may discuss the project at that time with representatives of the Owner and ​Engineer​.
All bids shall remain irrevocable for sixty days after the actual date of the opening thereof unless award is delayed due to the required approval of another government agency, the sale of bonds, or the award of a grant or grants; in which case, bids shall be irrevocable for one hundred twenty days in compliance with Act 317 of 1978 approved November 26, 1978, as amended.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS