U.S. Coast Guard Station Quillayute River Main Building Flooring Renovation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The U.S. Coast Guard is seeking a small business contractor to perform a flooring renovation at Station Quillayute River in La Push, Washington, involving the removal and disposal of approximately 1,500 square feet of existing flooring—composed of 60% carpet and 40% tile—and the installation of new tile flooring to meet U.S. Coast Guard standards. The acquisition is a firm-fixed-price purchase order set aside 100% for small businesses under NAICS code 238330, with a mandatory requirement for the contractor to be registered in the System for Award Management (SAM) prior to award. The work must be completed by September 2nd, 2026, following a 10-day premobilization period and 30 days of on-site work, with standard hours of operation from 0800 to 1700 PST, Monday through Friday,excluding federal holidays, though work outside these hours may be required. The scope includes site preparation with protective barriers, relocation of furniture and equipment, surface preparation, new baseboard and transition strip installation matching existing design, application of sealant or epoxy to grout as recommended, comprehensive cleanup, and final inspection with the technical point of contact. All materials and equipment must be listed, including technician and firm certifications and calibrated test instruments, and a detailed technical approach must be provided in a two-page proposal, while the price breakdown must be limited to one page and divided into five specified cost categories. The evaluation will follow a lowest priced, technically acceptable (LPTA) methodology, with complete and realistic quotes only considered. All proposals must be submitted electronically by 3:00 PM PDT on July 24th, 2026, and must consist exclusively of the completed SF 1449, a one-page price breakdown, and a two-page technical proposal—none of which may include extraneous materials like marketing documents or cover letters. A site visit is scheduled for July 16th, 2026, at 10:00 AM PDT, and requires RSVP by July 14th to Jesse Sannicolas. Questions must be submitted in writing to Patrick Gittings by July 20th, 2026, at 3:00 PM PDT, and responses will be posted on SAM.gov for transparency. The contractor must provide a project manager as the single point of contact, notify the contracting officer’s representative of
General Info
Agency
NAICS
Place of Performance
La Push, WA, 98350, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
DESCRIPTION OF REQUIREMENT:
The U.S. Coast Guard requires services for the contractor to provide all labor, equipment, material, transportation, supervision, services and items necessary for the removal and disposal of approximately 1,500 square feet of existing flooring (approximately 60% carpet and 40% tile) and the installation of new tile flooring at Coast Guard Station Quillayute River. The Government intends to issue a firm-fixed-price purchase order for this project. The full scope of work and specifications are included in the solicitation documents.
PROJECT ADDRESS:
U.S. Coast Guard
Station Quillayute River
350 Main St
La Push, WA, 98350
United States
CLASSIFICATION:
This acquisition is set-aside 100% for SMALL BUSINESS.
The associated NAICS code is 238330 – Flooring Contractors
Where Federal Acquisition Regulation clause language is inconsistent with FAR 13.004, Legal Effect of Quotations, that language is hereby tailored in accordance with FAR 12.302 to be consistent with a request for quotations. This tailoring includes but is not limited to the following: In accordance with FAR 13.004, a quotation is not an offer, and any clause provision to the contrary is hereby modified to be consistent with FAR 13.004. Where the word "offer/offeror" or a derivative of that word appears, it is changed to "quote/quoter" or a derivative of that word.
SITE VISIT:
A site visit will be arranged for interested offerors. All interested offerors must arrive no later than five minutes prior to their RSVP'd start time. Each offeror is highly encouraged to visit the site to provide the government with an accurate and competitive offer but is not required to submit a quote.
Site Visit Date: July 16th, 2026.
Site Visit Time: 10:00 AM PDT.
Location:
U.S. Coast Guard
Station Quillayute River
350 Main St
La Push, WA, 98350
United States
Please E-mail Jesse Sannicolas at Jessechristopher.M.Sannicolas@uscg.mil to RSVP for the site visit no later than July 14th, 2026.
QUESTIONS:
Any and all questions regarding this solicitation shall be submitted in writing to the Contract Officer at patrick.r.gittings@uscg.mil with solicitation RFQ number 70Z03326Q2019000007 in subject line. Questions regarding the statement of work (SOW) will be forwarded to the technical expert for an accurate response. All responses will be uploaded for an equal and fair solicitation to all interested vendors solely on SAM.gov. No more questions will be answered after 3:00 PM PDT on July 20th, 2026.
SUBMISSION OF QUOTES:
Prohibition on Extraneous Material: Do not submit any unnecessary documents, promotional marketing materials, general company history brochures, or generic cover letters. Quotes must contain only the specific information requested below. Extraneous documents will not be evaluated and may be counted against your page limits.
Quotes must be submitted electronically to patrick.r.gittings@uscg.mil by the date and time specified in this solicitation. Incomplete submissions may be considered unresponsive and ineligible for award.
A complete submission shall consist of the following three parts:
Part 1: SF 1449
- Complete and sign the provided Standard Form (SF) 1449.
- Insert the total firm-fixed-price bid in the appropriate blocks on the SF 1449.
Part 2: Price Quotation
- A detailed Price Breakdown for the total firm-fixed-price. The Price Breakdown shall not exceed one (1) page. The breakdown must, at a minimum, separate the costs for the following major tasks:
- Removal of existing flooring
- Preparation of surface for installation of new flooring
- Installation of new flooring
- Site Cleanup
- Labor Hours & Wages
Part 3: Technical Proposal
The Technical Proposal shall not contain any pricing information. The Technical Proposal shall not exceed two (2) pages in length. It must provide a clear, concise narrative demonstrating the quoter’s understanding of and ability to meet the requirements of the Statement of Work (SOW). The proposal must include:
- Technical Approach: A step-by-step description of how the quoter will perform the work, including mobilization, inspection, and installation of new flooring.
- List of Major Materials and Equipment: A list of the key materials and equipment proposed for the project. This list is for technical evaluation purposes to ensure compliance with the SOW and must include, at a minimum:
- Technician and Firm Certification
- Test Instruments List and Calibration Certificates
- Project Schedule: A high-level timeline illustrating the project's major milestones. The schedule must start from the date of the Notice to Award (NTA) and demonstrate that all work, including performance verification and report submission, will be completed within the required Period of Performance, with a completion date of September 2nd, 2026. Milestones should be shown in terms of days from the NTA (e.g., "Inspection of System(s) Complete: Day 3," "System(s) Repaired: Day 6," "Final Acceptance Testing: Day 9").
Submit quotes to the following e-mail address by the offer due date and time zone:
Attn: Patrick R. Gittings, E-Mail Address: patrick.r.gittings@uscg.mil with solicitation RFQ number 70Z03326Q2019000007 in subject line.
It is the government’s intent to award to the offeror who proposes a price that is fair and reasonable and provides the lowest priced, technically acceptable (LPTA) quote meeting the specifications of the requirement. If the lowest priced quote is not found to be technically acceptable, the contracting officer will evaluate the next lowest priced quote, and so on. Quotes determined to be incomplete, unreasonable, or unrealistic will not be considered for award. Under FAR 4.1103 prospective contractor shall be registered in System Award Management (SAM) prior to award. Failure for contractor to be registered in SAM shall result in Contracting Officer to proceed with next successful registered offeror. Website: www.sam.gov.
