Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on February 29, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

U66 Exterior Envelope Replacement Design Consultant

Closed
23-58220International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
ON-CALL STRUCTURAL ENGINEERING SERVICES
Solicitation # 26/27-15
The Town of Manchester, Connecticut, is soliciting proposals under solicitation number 26/27-15 for a qualified structural engineering firm to provide on-call services on an as-needed basis. The scope of work involves the review, analysis, inspection, and design of municipal infrastructure. To be eligible, the consultant must be a professional engineer licensed in the State of Connecticut. Proposals are due by October 29, 2026, and must be submitted electronically via the Town's procurement portal. The selection process is based on a points-based scoring method evaluating qualifications, relevant experience, key personnel, and hourly pricing, though the award is not based solely on cost. The Town reserves the right to shortlist candidates for interviews and negotiate with the selected vendor prior to the final award. Contractors must adhere to strict insurance requirements, including General Liability, Professional Liability, Cyber Risk, and Environmental Liability, each with minimums of 1,000,000 dollars. Additionally, the contract is subject to the Town of Manchester Living Wage Ordinance for values exceeding 25,000 dollars per fiscal year, requiring specific hourly wage rates for eligible employees and the submission of a Living Wage Certification. Required submission documents include a PDF proposal, a current IRS Form W-9, a SAM number, and a disclosure of any municipal litigation or arbitration from the past ten years. All services must comply with the laws of the Federal Government and the State of Connecticut.
Engineering

POSTED

about 1 hour ago

DEADLINE

in 8 days
NAICS: 541330
New
SLED
Carrell Canal Closed Drainage Design
Solicitation # RSQ 26-031
The City of Fort Myers is soliciting qualifications under RSQ 26-031 for a consultant to provide design plans to replace the existing open Carrell Canal, located between US 41 and the Ten-Mile Canal, with a closed drainage system. The project scope includes the design of a permanent emergency pumping station south of Palm Avenue near the Ten-Mile Canal and a 12-foot-wide asphalt multi-use path. The design must align with the findings of the Carrell Canal Drainage Study Report dated January 22, 2020. Required services encompass overall project management, composite boundary and topographic surveying, subsurface utility investigations, and supplemental geotechnical investigations. Submittals must be uploaded as a single signed PDF via the OpenGov portal by October 28, 2026, at 2:00 pm EST. The City will award the contract to the top-ranked consultant based on a points-based evaluation focusing on firm experience and personnel qualifications, project approach, Minority Business Enterprise compliance, and local vendor preference. Selected consultants must meet mandatory minimum qualifications and provide comprehensive insurance coverage. While construction estimates for the project range from 8.2 million to 9.9 million dollars, the professional services fee will be established through negotiations following City Council approval.
Engineering (Public Works)

POSTED

about 5 hours ago

DEADLINE

in 22 minutes

AI Contract Overview

Show more

The National Research Council Canada is seeking a design consultant for the exterior envelope replacement of building U-66 in Ottawa, which houses the Trisonic Wind Tunnel. The facility, constructed between 1958 and 1989, currently features a deteriorated stucco finish and an exterior insulation and finish system that require remediation. The project scope focuses on structural steel filled with terra cotta brick and precast panels, while also accounting for a planned building extension for a new compressor on the north side. The selected consultant will be responsible for four primary phases: feasibility design, detailed design, services during tender, and services during construction. A critical constraint of the project is the presence of asbestos in most existing construction materials, which must be addressed during the selection of reinstatement options. All final construction documentation must be completed and ready for public tender by November 29, 2024, adhering to specific NRC documentation and CAD standards.

General Info

Design consultant for Ottawa building U-66 exterior envelope replacement by November 29, 2024.

Documents

1

6196---u-66-exterior-envelope---addendum-2.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → National Research Council Canada
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Collin LongPoint of Contact

Full Description

Show more
23-58220 U66 Exterior Envelope Replacement Design Consultant General Project Overview U-66 is the home of our Trisonic Wind Tunnel used by Aerospace Research Centre to conduct research in design, manufacturing, performance and maintenance of air and space vehicles. The 1.5 m trisonic wind tunnel is a pressurized, intermittent-flow wind tunnel capable of providing subsonic, transonic and supersonic flows, Mach 0.1 to 4.25. The first portion of the U-66 building was originally built in 1958 and completed with misc. building additions, up to approximately 1989. There are various building envelope materials used in these additions. The exterior envelope of building U-66 is predominantly clad with a stucco wall finish. The stucco finish is in poor condition and has deficiencies including cracking, staining, and deteriorated areas of stucco in several areas. An exterior insulation and finish system (EIFS) wall system is located at the north side of the building, refer to Key Plan - Area “D” & Area “E2” below. There is a separate project initiated for a building extension for a new compressor. It is anticipated that this extension will be located on the North side of the building adjacent to Area “E2”. The exterior finishing of this building requires remediation. Specifically, the exterior of the building noted in dotted blue line below defines the current scope for this project. The main portion of the area requiring remediation consists of structural steel filled with terra cotta brick and precast panels, complete with a stucco finish on the exterior. Multiple previous patches and repair work were evident throughout the wall assembly. Project Description The exterior building envelope at U-66 requires remediation/replacement. This RFP incorporates four main sections of scope, Feasibility Design, Detailed Design, Services during Tender and Services during Construction of the exterior envelope outlined in the Key Plan in blue above. Asbestos was found in most of the existing construction materials therefore this must be taken into consideration when reviewing and selecting options for reinstatement. Existing building documentation will be provided to support this scope, such as but not limited to the scanned original construction drawings, and site-specific designated substance report, etc. Final construction documentation to be ready for public tender by November 29th, 2024. In order to meet the objectives outlined in this Request for Proposal (RFP) for Engineering Services, Consultants are to develop and provide complete, clear, and effective project documentation in accordance with requirements outlined in this project specific RFP document, the NRC Construction Documentation & Deliverables Manual, and the NRC Engineering & Construction CAD Standards.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS