UC San Diego Elliott Field Station Emergency Sewer Pipeline Repair

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The University of California, San Diego is undertaking an emergency repair to address a collapsed section of an underground sewer pipeline at its Elliott Field Station, where tree root intrusion caused an active wastewater spill requiring immediate intervention. A temporary aboveground bypass system has already been installed to halt the discharge of raw sewage, and the long-term solution involves localized trenching to remove the damaged pipe segment—estimated at fewer than 100 linear feet—and replace it with an in-kind pipe to fully restore system integrity. To prevent recurrence of structural damage, up to 30 non-native eucalyptus trees, approximately six inches in diameter, will be removed from the immediate vicinity; no native vegetation will be affected. The trenching work intersects an ephemeral drainage channel, which will be meticulously restored to its original topography and environmental condition following pipe installation, ensuring compliance with state regulatory requirements. This action qualifies as an emergency response necessary to protect public health, safety, and the environment by urgently halting contamination and reinstating critical utility infrastructure.

General Info

UC San Diego emergency repairs sewer collapse, removes eucalyptus trees, restores drainage, installs new pipe.

Agency

University of California, San Diego

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

10201 Pomerado Road, San Diego, San Diego, CA, 92131

Set-Aside

NONE

Documents

(1)

Elliott Field Station Emergency Sewer Pipeline Repair Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyUniversity of California, San Diego
Contacts1 person available
OfficeN/A
Organization / Agency
University of California, San Diego
Office AddressN/A
Contacts
Lauren Kahal LieversPrincipal Environmental Planner

Full Description

Show more
The project involves the emergency repair and in-kind replacement of a collapsed section of an underground sewer pipeline at UC San Diego’s Elliott Field Station. The collapse, determined to be caused by tree root intrusion, resulted in an active wastewater spill that required the immediate installation of a temporary aboveground bypass system. The project involves localized trenching to excavate and remove the damaged pipe section (assumed to be less than 100 linear feet, to be determined during trenching), followed by the installation of a new, in-kind replacement pipe to permanently restore system function. To facilitate the repair and prevent future structural pipeline damage, up to 30 small to medium (approximately 6-inches in diameter) non-native eucalyptus trees will be removed from the immediate work area. No sensitive native vegetation would be removed. The required trenching intersects a non-vegetated ephemeral drainage, which will be fully restored to pre-existing topographic and environmental conditions upon completion of the pipe installation, in compliance with required state regulatory authorizations. This project qualifies as an emergency action necessary to prevent or mitigate an immediate threat to public health, safety, and the environment by stopping the discharge of raw wastewater and restoring essential public utility infrastructure.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 11 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 11 hours ago

DEADLINE

in about 21 hours
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 11 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS