UCLA - 200 Medical Plaza, Third Floor Master Plan Study
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
UCLA is seeking qualified architectural firms to serve as the Executive Architect for the renovation of approximately 10,000 square feet on the third floor of the Peter Morton Medical Building at 200 Medical Plaza, Los Angeles. The project aims to improve various clinical and administrative spaces, including the Medical Procedure Unit, infusion services, patient treatment areas, and related support spaces, with an estimated construction budget of $15 to $20 million. The selected firm will be responsible for comprehensive design services, from schematic design through construction administration, ensuring compliance with relevant health, safety, and accessibility regulations such as OSHPD 3, NFPA, Title 22, and ADA standards. Responses to the RFQ are due by November 21, 2025, and the process involves reviewing submissions based on specific selection criteria. The RFQ package, available on the UCLA Planroom website, includes detailed instructions for registration and submission. The final project approval depends on the University of California Board of Regents' authorization and adherence to environmental review requirements under CEQA. The process emphasizes equal opportunity, with candidates potentially required to demonstrate commitment to diversity and equal employment policies. The project timeline includes key dates for questions, submission, and notification, with the overall goal of selecting an experienced architect capable of delivering full design and construction services for this significant renovation effort.
General Info
Place of Performance
CA, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- City of Santa Cruz Lifeguard Headquarters RepairsOpen now, due in 17 days
- Architectural Design ServicesOpen now, due in 59 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
UCLA requests a written response to this Request for Qualifications (RFQ) to select an Executive Architect for the proposed 200 Medical Plaza, Third Floor Master Plan Study project (No. CP1416). The Peter Morton Medical Building is on the UCLA main medical campus at 200 UCLA Medical Plaza, Los Angeles, CA 90095. The building, constructed in 1990, is an approximately 360,000 gross square foot (GSF) outpatient medical facility with six stories and two subterranean levels.
UCLA Health proposes to select an executive architect to plan the renovation of approximately 10,000 square feet on the 3rd floor of 200 Medical Plaza. The scope of work will include, but is not limited to, program improvements for the Medical Procedure Unit (MPU), infusion services, and other administrative and specialty clinic spaces. The renovations will also include improvements to patient treatment areas, exam rooms, and associated support service spaces.
The construction cost for the project has not yet been determined; however, the entire renovation project is anticipated to be approximately $15 to $20 million, depending on the agreed-upon scope of work and the number of required separately permitted projects.
Responses to this RFQ should demonstrate familiarity and experience in the planning, design, and construction administration of administrative, clinical, apheresis, and medical procedure suites, including security applications, equipment selection, and interior finishes appropriate for an MPU. Personnel proposed for this project must also demonstrate expertise in California's Department of Health Care Access and Information (HCAi) for OSHPD 3 (Clinic), National Fire Protection Association (NFPA) regulations, California Department of Public Health requirements (Title 22), and Americans with Disabilities Act (ADA).
The final selection and appointment of the architect for the proposed project are contingent upon project approval by the University of California Board of Regents or their delegated authority, and per the California Environmental Quality Act (CEQA). The project is subject to review and approval by the UC Board of Regents or their delegated authority.
The selection committee will base its review of the Executive Architect's submitted proposals and selection on the Selection Criteria form (Attachment A). This RFQ is for full design services, including the schematic design, design development, interior package, construction documents, cost estimate, assistance during the bid/award phase, construction administration, record documents, and project closeout; however, the University reserves the right to defer negotiations concerning services other than pre-design studies until the completion of the pre-design phase.
The complete RFQ packet will be available at http://www.uclaplanroom.com on Thursday, October 30, 2025. Responses to the RFQ are due by or before 10:00 a.m. on Friday, November 21, 2025. To download the packet, you must create a login and password. Registration instructions are available at https://www.uclaplanroom.com/help/account.register. Once in the UCLA Planroom, click the "RFQ" tab and search for the project to download. Within the project "RFQ Document" tab, download (1) RFQ, (2) the Planroom RFQ-Upload Instructions, and (3) Appendix C and D Instructions.
Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each Candidate Firm may be required to show evidence of its Equal Employment Opportunity policy.
Important dates | Advertisement period: 10/30-11/21/25 | Questions due date:11/5/25 | Submission date:11/21/25
Peter E. Hendrickson, AIA Associate Vice-Chancellor Design and Construction UCLA Capital Programs 1060 Veteran Avenue | Box 951365 Los Angeles, CA 90095-1365
More opportunities from University of California, Los Angeles
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS