This Solicitation opportunity from California was posted on January 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
UCLA Health -Various Capital Improvements |Infrastructure Equipment Replacement Projects
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
General Info
Agency
Place of Performance
Los Angeles, CA, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Projects initiated under this RFQ will be funded between January 2026 and December 2029, located in one of the above-listed buildings and other buildings of UCLA Health facilities. They will have project scopes that include the replacement of facility infrastructure equipment. UCLA Health reserves the right to assign projects based on the best alignment of each MEP Engineering firm's qualifications, relevant experience, and available staffing to support each specific proposed project scope and scheduling requirements. The construction cost for this series of infrastructure equipment replacement projects has not yet been determined and will be defined by the scope of work and phasing requirements for each project. Each project scope of work may be executed through several phased and separate incremental projects. The anticipated project cost range may be between approximately $500K-$10M per individual project, with an expected total cost for the entire master plan scope of work being between $5M-$50M per fiscal year.
The University may select up to four Executive MEP Engineer(s) based on qualifications submitted in response to this RFQ. UCLA will select the Executive MEP Engineer(s) based on qualifications in response to this RFQ. Candidate firms may submit for one project site (Group A, Group B, Group C, or Group D) or multiple sites. Candidates do not need to submit separate sets of booklets if submitting for multiple sites. Candidates may use the same submittal for all sites, provided the Health Campus of interest is correctly identified in the cover letter, and all submittal requirements are met.
The selection committee will base its review of the Executive MEP Engineers' submitted proposals and selection on the identified Selection Criteria (Attachment A). The University may select one or more firms for each Health campus and/or individual Health campus building.
The final selection and appointment of the Executive MEP Engineer is contingent upon project approval by the UC Board of Regents or their delegated authority. This RFQ is for complete design services. However, the University reserves the right to defer negotiations for services other than pre-design studies until the completion of the pre-design phase.
The selection committee will base its review of the Executive MEP Engineer's submitted proposals and selection on the identified Selection Criteria (Attachment A). This RFQ is for full design services comprising essential MEP engineering, architecture, and infrastructure design and planning. The services include schematic design, design development, construction documents, cost estimates, assistance during the bid/award phases, construction administration, record-keeping, and project closeout.
The complete RFQ packet will be available at http://www.uclaplanroom.com on Monday, January 12, 2026. Responses to the RFQ are due by or before 10:00 a.m. on Tuesday, February 3, 2026. To download the packet, you must create a login and password. Registration instructions are available at https://www.uclaplanroom.com/help/account.register. Once in the UCLA Planroom, click the "RFQ" tab and search for the project to download. Within the project "RFQ Document" tab, download (1) RFQ, (2) the Planroom RFQ-Upload Instructions, and (3) Appendix C and D Instructions. Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each Candidate Firm may be required to demonstrate its Equal Employment Opportunity policy.
Important dates | Advertisement period: 1/12/26 | Questions due date: 1/20/26 | Submission date: 2/3/26
Peter E. Hendrickson, AIA Associate Vice-Chancellor Design and Construction UCLA Capital Programs 1060 Veteran Avenue | Box 951365 Los Angeles, CA 90095-1365
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS