This Solicitation opportunity from California was posted on October 31, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
UCLA Semel Institute 5th Floor Transcranial Magnetic Stimulation (TMS) Program Renovation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
UCLA is seeking qualified architectural firms to serve as the Executive Architect for the renovation of the fifth floor of the Semel Institute Building to support the new Transcranial Magnetic Stimulation (TMS) Program. The project involves developing a comprehensive tenant improvement master plan and executing detailed design and construction documentation for approximately 13,788 assignable square feet of space, which includes office, research, clinical, conference, and support areas. The scope encompasses demolition of existing improvements, installation of new finishes, lighting, ceilings, and environmental systems, as well as modifications to plumbing, electrical, fire safety, and communication systems. The project may also involve installing or relocating medical equipment and is estimated to cost between $2 million and $3 million, potentially executed in multiple phases. The selection process is contingent upon approval by the University of California Board of Regents and compliance with the California Environmental Quality Act. The university emphasizes sustainable design practices aligned with California Energy Code standards, incorporating energy efficiency and green building principles. Responses to the RFQ are due by November 21, 2024, and must be submitted through the UCLA Planroom, where the full RFQ packet is available for download. The university is committed to equal opportunity employment and may require evidence of an Equal Employment Opportunity policy from participating firms. The final contract will be awarded based on the review of proposals according to specified selection criteria, with full design services to be provided upon successful selection and project approval.
General Info
Agency
Place of Performance
CA, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
UCLA requests a written response to this Request for Qualifications (RFQ) to select an Executive Architect for the proposed UCLA Semel Institute 5th Floor Transcranial Magnetic Stimulation (TMS) Program Renovation (UCLA Project 907109.01). This project is an approximately 13,788 asf (22,818 gsf) program on the fifth floor of the Semel Institute Building, an eleven-story, 170,396 asf (294,992 gsf) structure built in phases between 1958 and 1967.
The proposed project would develop a tenant improvement master plan for the 5th floor of the Semel Institute building to support the renovation of the Transcranial Magnetic Stimulation (TMS) Program. The space program for TMS is anticipated to include the renovation of the existing office, research lab, clinical, conference, support, building core, and common area spaces, in addition to developing construction documentation and assisting the University in securing Regental and Agency approvals for the proposed program, building core and common area improvements.
The scope of work is anticipated to include the demolition of current improvements in the way of the proposed work; replacement of existing flooring and wall finishes; installation of suspended ceilings, lighting, casework; renovation of existing restrooms, plumbing fixtures, and environmental control systems; modifications to air distribution and return systems; provision of power; modifications to the fire alarm system and fire sprinkler systems; installation of conduit and cabling for communications connectivity and security systems; installation of signage; and interior finishes. Existing improvements impacted by the work would be restored. The project may also require installing new or relocating existing medical equipment. The construction cost for the project has not yet been determined and may be executed through several phased, separate incremental projects. However, it is anticipated that the total construction cost may be between $2 to $3 million, depending on the agreed-upon scope of work.
The final selection and appointment of the architect for the proposed project are contingent upon project approval by the University of California Board of Regents or their delegated authority and per the California Environmental Quality Act (CEQA). The project is subject to review and approval by the UC Board of Regents or their delegated authority.
The selection committee will base their review of the Executive Architect's submitted proposals and selection on the Selection Criteria form (Attachment A). This RFQ is for full design services; however, the University reserves the right to defer negotiations concerning services other than pre-design studies until the completion of the pre-design phase.
The design shall comply with the University of California Policy on Sustainable Practices concerning green building design and energy efficiency. The project must meet the California Energy Code (Title 24) energy efficiency standards and apply sustainability principles to the renovated building's systems, components, and portions of the renovated building.
The complete RFQ packet will be available at http://www.uclaplanroom.com on Thursday, October 31, 2024. Responses to the RFQ are due by or before 10:00 a.m. on Thursday, November 21, 2024. To download the packet, you must create a login and password. Registration instructions are available at, https://www.uclaplanroom.com/help/account.register. Once in the Planroom, click the RFQ tab and search for the project to download.
Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each Candidate Firm may be required to show evidence of its Equal Employment Opportunity policy.
Peter E. Hendrickson, AIA Associate Vice-Chancellor Design and Construction UCLA Capital Programs 1060 Veteran Avenue | Box 951365 Los Angeles, CA 90095-1365
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
