Ukiah New Municipal Well Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Ukiah is initiating the Ukiah New Municipal Well Project to construct a new municipal water well on city-owned property located at approximately 410 Talmage Road in Ukiah, California. The project aims to provide a safe, reliable, and redundant water supply with a capacity of approximately 600 to 1,000 gpm. The development will be executed in four distinct phases: first, the construction of a test well to evaluate aquifer water quality and capacity; second, the drilling and development of the well with blank and louvered casing, contingent upon meeting California drinking water standards; third, the installation of pump and motor equipment, a drive motor, a sand separator, and the construction of a 20-foot by 40-foot by 10-foot enclosed building on a 150-foot by 150-foot paved pad with fencing and lighting; and fourth, the installation of a 12-inch transmission line buried 3 feet deep to connect to an existing 6-inch line in Waugh Lane. The project is classified under NAICS code 237110 and was posted as a forecast on June 24, 2026. A Notice of Determination dated June 17, 2026, confirms that the project will not cause significant environmental impacts provided that specified mitigation measures are implemented. The new facility is designed to match the look, color, and size of the city's four existing wells, and the contractor will be responsible for returning any damaged roadways or fencing to pre-construction conditions or better. The project is managed by the City of Ukiah Water Resources Director.

General Info

City of Ukiah to build 600–1000 GPM well with building, fencing, and 12-inch line connection to existing system.

Agency

California → City of Ukiah

Place of Performance

Talmage Road and Waugh Lane, Ukiah, CA, 95482

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Ukiah
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Ukiah
Office AddressN/A
Contacts
Jared WalkerWater Resources Director

Full Description

Show more
The purpose of the Proposed Project is to construct a new well with a capacity of approximately 600 to 1,000 gpm to help the City maintain and continue to provide its existing customers with safe, reliable, and redundant water supply. The Proposed Project would be constructed entirely on City owned property and would be of similar look, color, and size to the other City's four (4) existing wells. The Proposed Project's building would be located on a paved pad that would be approximately 150-fcet by 150-fcet and fenced with a locking gate. The Proposed Project would consist of construction and operation of a new municipal water well within an enclosed building approximately 20-fcet by 40-fcet by I 0-fcet high, which would occur in four phases. The first phase would be the construction of a test well to determine the potential capacity of the well and to test for water quality of the aquifer. If the capacity of the well and the water quality meet California's drinking water standards, then the second phase would be for drilling and developing the well. This phase would drill the well hole and install blank and louvered casing to the necessary depths for the well. The third phase would be the installation of the pump and motor equipment. This would include the constniction/installation of a drive motor, sand separator, as well as the construction of the building, fencing, site lighting, electrical equipment and other site improvements. The fourth and last phase would be the construction of a 12-inch transmission line that would run to the west for approximately 25-fcet and tic into the City's existing 6-inch water transmission line in Waugh Lane. The pipeline would be trenched and buried approximately 3-fcet deep below the existing ground surface. The new well will help provide water supply and pressure requirements for the area. Any damages to existing access roadways and fencing during construction will be returned to pre-construction conditions or better.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont, North Carolina, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Additional deliverables include the installation of new gravity sewers and manholes, a generator, odor control equipment, stormwater facilities, and site fencing. The project has an estimated value of $16,690,000 and is set aside for small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts forms. The agreement is governed by EJCDC standard forms, requiring performance and payment bonds and proof of insurance. Performance begins upon a Notice to Proceed, and payment is processed monthly via applications for payment submitted to the Engineer, with payments due 30 days after presentation to the owner. Final acceptance is contingent upon a joint inspection by the Owner, Contractor, and Engineer, the completion of a punch list, and the Engineer's written recommendation for final payment.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 12 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement