This Solicitation opportunity from Washington was posted on May 27, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract pertains to the Ultra Custom Care Cleaners Site In Situ Groundwater Treatment project in Bothell, Washington, with a solicitation number of PW-0139. The project involves constructing a groundwater treatment system, including utility location, treatment application, and monitoring well installation, with an estimated value between 1.85 million and 2 million dollars. The work is scheduled for completion within approximately 60 working days, and bids are due by June 10, 2025. The project is financed by the Washington State Department of Ecology, and the City of Bothell is managing the solicitation process, with Scott Adamek serving as the primary contact for inquiries. Bidders are encouraged to access bid documents online and register for notifications, with the city reserving rights regarding bid acceptance and award.
The project emphasizes environmental remediation and infrastructure improvement, requiring sealed bids for construction work, and includes specific instructions on bid submission, licensing, and participation requirements. The bid advertisement highlights the importance of compliance with state regulations, non-discrimination policies, and the availability of electronic plans. The overall scope involves in situ groundwater treatment techniques aimed at environmental cleanup, with a clear timeline and budget outlined to ensure project completion and adherence to regulatory standards.
HighAI Summary for Advertisement for Bids - Ultra Custom Care Cleaners Groundwater Treatment Project #0019.05.T012: This document is an Advertisement for Bids issued by the City of Bothell for the Ultra Custom Care Cleaners Site In Situ Groundwater Treatment project, project number 0019.05.T012. It invites sealed bids for construction work involving utility location, in situ groundwater treatment application, and monitoring well installation. The bid opening is scheduled for June 10, 2025, at 1100 hours local time. The estimated project cost ranges from $1,850,000 to $2,000,000 with a completion period of 60 working days. Bidders are directed to access bid documents online and register for notifications. The project is financed by the Washington State Department of Ecology, and the City of Bothell reserves rights regarding bid acceptance and award. The document includes instructions on bid submission and non-discrimination policies.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Bothell Way NE Multiway Boulevard Phase 2 Conforming Plans: This document is the conforming plans for the Bothell Way NE Multiway Boulevard Phase 2 project, covering MP 0.02B to 0.36 in Bothell, Washington. It includes a detailed sheet index with engineering drawings such as alignment plans, right-of-way plans, staging, site preparation, erosion control, roadway sections, utility plans, traffic control, and urban design plans. The document is approved for construction and includes references to addendums and record drawings. It serves as a technical specification and construction guide for the project.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Multiway Blvd Phase 2 Drainage Construction Notes and Key Map: This document titled 'Multiway Blvd Phase 2 Drainage Construction Notes and Key Map' provides detailed construction notes and key map information for storm drainage infrastructure improvements. It includes instructions for installation, connection, removal, and protection of drainage structures such as catch basins, pipes, risers, and cleanouts. The document references multiple detail drawings (MD2, MD3, MD4) and city standards for construction. It outlines general notes on sanitary sewer design, pipe slopes, and testing requirements. The document is intended to guide contractors in the proper construction and modification of storm drainage systems for the Multiway Blvd Phase 2 project.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Multiway Blvd Phase 2 IL3 IL4 IL5 Construction Notes: This document titled 'Multiway Blvd Phase 2 IL3 IL4 IL5' contains detailed construction notes for the installation and modification of street lighting and related electrical infrastructure. It includes instructions for installing multi-head LED streetlights, roadway post-top LED streetlights, sidewalk post-top LED streetlights, power bollards, and associated foundations and conduits. The notes specify procedures for relocating existing lighting fixtures, protecting existing streetlights, and wiring connections per wire schedules. The document references multiple drawing numbers for detailed installation guidance and emphasizes maintaining operational signal cabinets during work. This version provides critical technical specifications necessary for construction and electrical work on the project.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for Multiway Blvd Phase 2 IR1 IR2 IR3 Modification: This document is a contract modification related to the Multiway Blvd Phase 2 project, specifically addressing irrigation changes per Contract Change Order #004. The document appears to include tabular data detailing the modification. It serves to update the original contract with revised scope or specifications for irrigation work.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Ultra Custom Care Cleaners Site Remedial Investigation and Feasibility Study Appendices Final: This document is the final appendices for the Remedial Investigation and Feasibility Study (RIFS) of the Ultra Custom Care Cleaners Site in Bothell, Washington. It includes Appendix A, summarizing historical sampling reports from 2001 to 2018, and Appendix B, presenting historical groundwater data within the study area. The document compiles environmental data, georeferenced sampling locations, and interim measure reports relevant to site contamination assessment and cleanup planning. The version is final as of the document date indicated in the filename (2022-12-16). It supports environmental remediation procurement by providing critical technical data and historical context for site investigation and feasibility analysis.
PDF
PDF, Low priorityother
LowAI Summary for 01-Boring Logs Pre-2018 - Subsurface Well Logs Bothell WA: This document contains subsurface boring logs and well monitoring data for various monitoring wells in Bothell, Washington, collected primarily in 2014. It includes detailed descriptions of soil samples, drilling methods, equipment used, and well construction details such as casing and grout information. The logs provide depth intervals, sample types, and observations of soil characteristics and chemical odors. The document serves as a record of environmental drilling and monitoring activities but does not constitute a solicitation or contract document.
PDF
PDF, Low priorityother
LowAI Summary for 02-COBothell-Ultra DGI Technical Memorandum and Attachments: This document contains attachments related to the Ultra Custom Care Cleaners project, including Exhibit C from Agreed Order No. DE9704 outlining a schedule of deliverables with due dates for remedial investigation reports, interim action work plans, and feasibility studies. It also includes a project timeline from 2013 to 2015 detailing tasks such as interim actions and report submissions. Additionally, the document provides a Data Validation Summary dated September 16, 2020, prepared by Chell Black, reviewing laboratory data quality for groundwater and soil samples collected in 2020 under the DGI Work Plan. The summary confirms data quality compliance with USEPA guidelines and notes specific analytical details and qualifiers.
PDF
PDF, Low priorityengineering-design-report
LowAI Summary for 04-COB-Ultra Engineering Design Report Appendices 2023-07-14: This document is the Engineering Design Report Appendices for the Ultra Custom Care Cleaners Site project (COB-Ultra) dated July 14, 2023. It contains detailed pre-design investigation data including soil boring logs, soil descriptions, sampling methods, drilling equipment, and groundwater depth measurements for multiple boring locations at 18304 Bothell Way NE. The report provides geotechnical information such as soil classification, texture, moisture, and other observations relevant to site conditions.
PDF
PDF, Low priorityengineering-design-report
LowAI Summary for 04-COB-Ultra Engineering Design Report July 2023: Engineering Design Report prepared for the City of Bothell dated July 14, 2023. The report details site regulatory overview, environmental conditions, contaminants of concern, cleanup standards, remedial action objectives, engineering design criteria, contaminated soil excavation, in situ groundwater treatment, construction planning, compliance monitoring, and performance monitoring. It includes tables, figures, and appendices covering pre-design data, health and safety plans, quality assurance, and environmental protocols. The document serves as a technical reference for environmental remediation planning and implementation at the Ultra Custom Care Cleaners site.
PDF
PDF, Low priorityother
LowAI Summary for 05-COBothell-Ultra Supplemental Groundwater Monitoring Memorandum 2025-0103: This memorandum dated January 3, 2025, from Floyd | Snider to the Washington State Department of Ecology and City of Bothell presents results of supplemental groundwater monitoring at the Ultra Custom Care Cleaners Site. The document details groundwater contaminant conditions following soil excavation and zero-valent iron (ZVI) soil mixing completed in December 2023 as part of the Site cleanup action. It includes sampling methods, analytical results for contaminants such as tetrachloroethene (PCE) and vinyl chloride, and geochemical parameters. The memorandum provides data comparisons to prior sampling in 2020 and discusses the effectiveness of remediation efforts and recommendations for optimizing remaining cleanup components.
PDF
PDF, Low prioritytechnical-memorandum
LowAI Summary for COBothell Ultra Data Gaps Investigation Technical Memorandum 2020-09-30: This technical memorandum dated September 30, 2020, documents the Data Gaps Investigation (DGI) conducted at the Ultra Custom Care Cleaners Site in Bothell, Washington. Prepared by Floyd | Snider for the City of Bothell and Washington State Department of Ecology, it summarizes the investigation phases, including well reconnaissance, groundwater monitoring, membrane interface probe investigation, soil and groundwater sampling, and elevation survey. The memorandum details sampling methods, analyses performed, and preliminary findings to support further remedial investigation and feasibility study efforts under an existing Agreed Order.
PDF
PDF, Low priorityas-built-drawings
LowAI Summary for Fiber Optic Project As Builds - Bothell WA - Project 54732: This document contains as-built drawings and construction notes for the Fiber Optic Project 54732 in Bothell, WA. It includes site location, scope of work involving conduit installation and cable pulling, contact information, sheet index, site photographs, construction notes, and traffic control plans. The document is dated 10/25/2023 and provides detailed information on existing and proposed infrastructure, traffic control requirements, and city compliance notes. It serves as a record of completed construction work rather than a solicitation or contract.
LowAI Summary for Multiway Blvd Phase 2 MD1 MD2 Rain Garden Specifications: This document titled 'Multiway Blvd Phase 2 MD1 MD2 Rain Garden' appears to contain specifications related to a rain garden project phase. No solicitation number or contract identifiers are present. The content likely details design or construction specifications for the rain garden, but no critical procurement instructions or evaluation criteria are included. The document serves as a supporting specification for a larger procurement or project.
LowAI Summary for Section 5.C.01-Boring Logs Pre-2018 - Subsurface Boring Logs: This document contains subsurface boring logs for various monitoring wells at the Ultra Custom Cleaners property in Bothell, Washington. It includes detailed geological descriptions, sampling methods, drilling dates, and well construction information. The logs document soil and groundwater conditions encountered during drilling activities conducted primarily in 2014, with data recorded by Farallon Consulting and Environmental Drilling Inc. The document serves as a record of site conditions for environmental and remedial investigation purposes.
PDF
PDF, Low priorityother
LowAI Summary for Section 5.C.05-COBothell-Ultra Supplemental Groundwater Monitoring Memorandum 2025-0103: This memorandum dated January 3, 2025, from Floyd | Snider to the Washington State Department of Ecology presents results of supplemental groundwater monitoring at the Ultra Custom Care Cleaners Site. It evaluates contaminant conditions following soil excavation and zero-valent iron (ZVI) soil mixing completed in December 2023, and provides recommendations for optimizing cleanup actions. The document details groundwater sampling methods, analytical results for contaminants including tetrachloroethene (PCE) and vinyl chloride, and geochemical parameters. Findings indicate significant reductions in PCE concentrations near the treated source area and stable vinyl chloride levels. Iron concentrations suggest localized effects of ZVI treatment. The memorandum supports ongoing site cleanup efforts but is not a procurement solicitation or contract document.
PDF
PDF, Low priorityfeasibility-study
LowAI Summary for Ultra Custom Care Cleaners Site Remedial Investigation and Feasibility Study Final Report Nov 2022: This final Remedial Investigation and Feasibility Study (RI/FS) report, dated November 2022, was prepared for the City of Bothell regarding the Ultra Custom Care Cleaners Site. The document details the investigation of soil and groundwater contamination primarily from chlorinated solvents and arsenic, resulting from historical dry cleaning operations. It includes site characterization, conceptual site model development, identification of chemicals of concern, and evaluation of remedial alternatives such as soil excavation and in situ groundwater treatments. The report supports cleanup decision-making under Washington State's Model Toxics Control Act regulations.
PDF
PDF, Low priorityother
LowAI Summary for Ultra Custom Care Cleaners Site Supplemental Groundwater Monitoring Memorandum 2025-0103: This memorandum dated January 3, 2025, from Floyd | Snider to the Washington State Department of Ecology presents results of supplemental groundwater monitoring at the Ultra Custom Care Cleaners Site. It evaluates groundwater contaminant conditions following soil excavation and zero-valent iron (ZVI) soil mixing completed in December 2023. The report includes groundwater sampling data from October 2024, analyzing tetrachloroethene (PCE), vinyl chloride, iron, and geochemical parameters to assess the effectiveness of cleanup actions. Key findings show significant PCE reductions near the soil mixing area and stable vinyl chloride levels. The document supports ongoing site cleanup efforts and provides recommendations for optimizing treatment components.