Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from North Carolina was posted on June 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

UNC Pembroke

Closed
287-19786P-DS-RBState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238330
New
Federal
Replace Operating Room 5 Flooring
Solicitation # 36C26327Q0019
Solicitation 36C26327Q0019 is a Service-Disabled Veteran-Owned Small Business set-aside for the Department of Veterans Affairs, Network Contracting Office 23. The project involves providing all labor, materials, tools, and supervision to remove and replace the flooring and subflooring in Operating Room 5 (Room 4211, Building 1W) at the Des Moines VA Medical Center in Iowa. The work must be completed within 120 calendar days following the Notice to Proceed. Award will be granted to the responsible, eligible quoter who submits the lowest-priced acceptable quotation that meets all solicitation requirements, provided the price is determined to be fair and reasonable. Key technical requirements include conducting asbestos survey testing, adhering to the Architectural Design Manual, and utilizing certified installers through INSTALL or a comparable four-year apprenticeship program. The contractor must provide a floor tile mockup of 100 square feet to establish quality standards and comply with strict packaging and marking regulations for asbestos waste and HEPA filters. Administrative requirements include the submission of an Accident Prevention Plan and Site-specific Safety Plan for COR approval, as well as the provision of payment bonds or irrevocable letters of credit for contracts exceeding 35,000 dollars. The contract is subject to the Davis-Bacon Act and Buy American requirements, with specific limitations on subcontracting to ensure a minimum of 15 percent of the work is performed by the prime SDVOSB contractor.
Network Contract Office 23 (36C263)

POSTED

about 18 hours ago

DEADLINE

in 6 days
NAICS: 238330
New
SLED
Green ES Multi Purpose Floor, Wall Replacement/Repair and Paint - Open to contracted pre-qualified pool for VARIOUS TRADES ONLY
Solicitation # 26-1471
Chicago Public Schools is soliciting bids for the Green ES Multi Purpose Floor, Wall Replacement/Repair and Paint project, which is open to their contracted pre-qualified pool for various trades. The scope of work includes providing all labor and materials for flooring and wall repairs, specifically the installation of VCT tile flooring followed by the application of six coats of high solid vinyl wax coating. Contractors must ensure that resilient flooring remains free of traffic for 48 hours post-installation and must provide written certification from both the flooring and adhesive manufacturers confirming the subfloor is acceptable before installation begins. Bids must be submitted electronically via EUNA/Bonfire by November 5, 2026, at 8:00 PM. Public bid readings will be conducted via Google Meet. Depending on the bid price, specific requirements apply: a 5% bid bond and union signatory status are required for bids of $25,000 or more, payment and performance bond premiums must be included for bids of $50,000 or more, and MBE/WBE documentation is mandatory for bids of $75,000 or more. All work must comply with 2010 ADA Standards for Accessible Design and the Chicago Building Code. Onsite coordination is managed by Stationary Engineer Michael Bliss and Zone Chief Michael Berry. Materials must be delivered in sealed, labeled containers and stored between 45 and 90 degrees Fahrenheit to prevent freezing.
Chicago Public Schools

POSTED

1 day ago

DEADLINE

in 9 days

AI Contract Overview

Show more

The contract titled "Jones Main Gym Floor Replacement - Re-Bid" is a solicitation issued by the UNC Pembroke under the UNC System Office for Design and Construction in North Carolina. The project involves replacing the main gym floor at Jones, and this particular posting is a re-bid, indicating a previous solicitation for the same work. The solicitation was posted on June 17, 2026, with a response deadline set for July 7, 2026. The contract is open without any specified set-aside program or NAICS code, reflecting a general bidding opportunity within the state-level agency framework. The work will be performed in North Carolina under the oversight of the UNC System Office Design/Construction unit. The primary point of contact for this solicitation is Cynthia Strader. Interested parties can find additional details and submit their responses through the official North Carolina state procurement portal. The project is managed by the State and Local Government Entity (SLED) type organization, ensuring compliance with state procurement regulations and standards. This opportunity is critical for contractors specializing in flooring replacement projects within educational or institutional gymnasiums in the region.

General Info

UNC Pembroke re-bid for Jones gym floor replacement, bids due July 7, 2026, North Carolina.

Documents

1

UNC Pembroke Jones Main Gym Floor Replacement ReBid Designer Solicitation

PDF, High priority: read this firstsources-sought
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNorth Carolina → Unc - System Office Design/construction
Contacts1 person available
OfficeNC, USA
Office AddressNC, USA
Contacts
Cynthia Strader

Full Description

Show more
Jones Main Gym Floor Replacement - Re-Bid

More opportunities from North Carolina → Unc - System Office Design/construction

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS