Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Underground Electrical and Utility Systems

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Defense → FA5025 356 Eceg PkView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Misawa Air Base, JP-02, 033-0021, JPN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA5025 356 Eceg Pk
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → FA5025 356 Eceg Pk
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of underground electrical service, transformers in ventilated vaults, and utility connections compliant with local and international standards.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
Variable Frequency Drives (VFD) Replacement Phase 3 (DBB)The Port of Seattle is preparing to replace the final 125 failing Robicon variable frequency drives (VFDs) as part of Phase 3 of its VFD Replacement project, with work to be completed under a design-bid-build procurement approach. The scope includes full removal of the outdated units and installation of new VFDs, all of which must be integrated with the Port’s Direct Digital Controller (DDC) system to enable real-time energy usage monitoring, output control readings, and efficiency tracking. The project requires complete wiring, rigorous testing, and formal commissioning to ensure the entire system operates reliably and meets performance specifications. All associated equipment necessary for a fully functional installation must be supplied and implemented by the contractor. The effort falls under NAICS code 238210 for electrical contracting and is being managed by the Aviation Facilities & Infrastructure division of the Port of Seattle. Primary point of contact for inquiries is Yanet Maldonado, with Sharon Miick serving as the project manager. The solicitation was posted on July 25, 2026, and while the exact location details are not specified, the work will take place at Port facilities under the jurisdiction of the Aviation Facilities & Infrastructure team. Contractors are expected to deliver a turnkey solution with full system integration and operational readiness upon completion.
Aviation Facilities & Infrastructure

POSTED

about 2 hours ago

DEADLINE

N/A
View Details
NAICS: 238210
New
SLED
Operational Security Cameras Bagwell and North Cargo AreasThe contract entails the design, permitting, and construction necessary to install 50 high-resolution cameras across 43 sites in the Bagwell and North Cargo Operations areas of the Port of Seattle. The primary objective is to enhance surveillance capabilities in key operational zones to support forensic investigations and enforce the Port’s movement rules and regulations. Current camera placements primarily monitor conveyor systems and security doors, but this project will expand coverage to include main terminal drive lanes and entrances in the Bagwell area, ensuring more comprehensive oversight of vehicle movements and activity. In the North Cargo area, flexible camera coverage will be implemented using Pan Tilt Zoom units that allow user-controlled adjustment to bridge gaps in surveillance coverage, providing broad surface area monitoring where needed. The project is managed by the Aviation Project Management Group under the Port of Seattle, with Angela Peterson as the primary point of contact and Randa Williams serving as the Project Manager. The work falls under NAICS code 238210, indicating it is classified as a specialty trade contractor project, and is forecasted to be posted on July 25, 2026. No set-aside provisions are specified, and the physical performance location is within the Port of Seattle’s operational boundaries. The installation effort is designed to deliver a systematic upgrade to the existing security infrastructure, focusing on resolution, coverage, and operational flexibility to better meet the Port’s evolving security and enforcement needs.
Aviation Project Management Group

POSTED

about 2 hours ago

DEADLINE

N/A
View Details
NAICS: 238210
New
SLED
Rental Car Facility (RCF) Quick Turn Around (QTA) Area Fire Suppression System Replacement (Re-bid)The Port of Seattle’s Aviation Project Management Group is preparing to replace the existing aqueous film-forming foam (AFFF) fire suppression system at the Rental Car Facility located at 3150 S 160th Street in SeaTac, which contains per- and polyfluoroalkyl substances (PFAS). The project involves complete removal of the outdated foam system, including contaminated components, followed by the design and installation of a new fully dry chemical fire suppression system. This includes new storage tanks, control valves, pumps, sprinkler piping, sprinkler heads, and reserve tanks, all engineered to meet current safety and environmental standards. The new system must integrate seamlessly with the facility’s existing fire alarm controls to ensure full operational coherence and emergency response capability. The contract is being re-bid under the solicitation title Rental Car Facility (RCF) Quick Turn Around (QTA) Area Fire Suppression System Replacement, classified under NAICS code 238210 for fire protection contracting. The effort is managed by the Port of Seattle with primary point of contact Todd Rehm and project manager Pat Nakamura available for inquiries. While no set-aside status or detailed budget is specified, the work is anticipated to proceed after the posting date of July 25, 2026, with performance expected at the RCF location. The project underscores the Port’s commitment to environmental compliance by eliminating PFAS-containing systems and transitioning to safer, non-contaminating fire suppression technology.
Aviation Project Management Group

POSTED

about 2 hours ago

DEADLINE

N/A
View Details

More opportunities from Department Of Defense → FA5025 356 Eceg Pk

Same awarding agency

NAICS: 333120
New
Federal
ERHS CAT CTL AttachmentsThis solicitation, designated FA502526QA015 and titled ERHS CAT CTL Attachments, is a Total Small Business Set-Aside under FAR 19.5 targeting NAICS code 333120 for procurements by the Department of Defense, specifically the office FA5025 356 Eceg Pk. It seeks the acquisition of one CAT CTL 265 Compact Track Loader along with six hydraulic attachments: Box Blade BB124, Brushcutter BRX318, Bucket-SK Plate 86in, Cold Planer PC306, Root Rake Grapple, and Broom BA121, each with precise technical specifications including operating widths, cutting or sweeping capacities, hydraulic flow requirements, and dimensional constraints. The primary machine must support dual travel speeds of 5 mph and 8.1 mph, offer either Standard Flow or High Flow XPS hydraulic packages, and comply with ROPS ISO 3471:2008 and FOPS ISO 3449:2005 Level I safety standards. The place of performance is Yigo, Guam, with a submission deadline of July 31, 2026, and responses directed to the primary point of contact, Daniel Callahan, with secondary correspondence routed through the 356 ETSG/CONS Org Box. While detailed technical requirements for each attachment are specified, the solicitation lacks information on pricing, quantities, delivery schedules, packaging and marking standards, inspection protocols, evaluation factors, contract administration details, and submission instructions beyond the deadline and set-aside status, with all referenced attachments provided as spec sheets supporting the performance requirements.
Construction Machinery Manufacturing

POSTED

2 days ago

DEADLINE

in 5 days
View Details