Underground Primary Feeder Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the Fort Valley Utility Commission involves the installation of a three-phase underground electric distribution system. The selected licensed electrical contractor will be responsible for installing underground primary cables, conduit systems, pad-mounted transformers, PME switchgear, primary metering equipment, terminating cabinets, vaults, and pads. The scope of work also includes the execution of grounding systems and the completion of testing and commissioning in accordance with NESC and ECG Construction Assembly Specifications to deliver a commissioned 7.2 kV / 12.47 kV system. The project is categorized under NAICS code 238210 and was posted on September 28, 2026. Interested parties must submit their responses by the deadline of November 10, 2026, at 2:00 PM.

General Info

Electrical contractor to install underground electric distribution system for Fort Valley Utility Commission.

Documents

This scope was carved out of PE-33552-NONST-2027-000000021.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

BLUE BIRD EXPANSION

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → Fort Valley Utility Commission
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs a three-phase underground electric distribution system for prime contractors on Fort Valley Utility Commission projects. Installs underground primary cable, conduit systems, pad-mounted transformers, PME switchgear, primary metering equipment, terminating cabinets, vaults, and pads. Executes grounding systems and performs testing and commissioning per ECG Construction Assembly Specifications and NESC. Licensed electrical contractor required. Delivers a commissioned 7.2 kV / 12.47 kV system.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
The Department of Homeland Security's Immigration and Customs Enforcement agency is soliciting a firm-fixed-price task order for the LED Lighting and Occupancy Sensor Upgrade project at the Buffalo Federal Detention Facility in Batavia, New York. This 8(a) Multiple Award Construction Contract set-aside involves providing all engineering, labor, materials, and supervision to replace existing fluorescent fixtures, lamps, and ballasts with energy-efficient LED lighting and occupancy sensors. The project includes the removal and proper disposal of old materials, testing, commissioning, and the provision of five percent attic stock. The estimated magnitude of the project is between 2 million and 2.3 million dollars, with a period of performance of 180 calendar days from the notice to proceed. Award will be based solely on the lowest total evaluated price. The contractor is required to provide a quality control plan within 15 days of award and a site survey within 30 days. Key deliverables include product submittals, a commissioning report, a minimum two-hour training session for facility personnel, and as-built drawings upon closeout. The work must comply with the Davis-Bacon Act for prevailing wages, OSHA safety standards, the Americans with Disabilities Act, and International Building Code requirements. Performance and payment bonds are required, and all payment requests must be submitted electronically via the Invoice Processing Platform accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in about 12 hours
View Details
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This firm-fixed-price task order, issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ, requires the provision and installation of two 40ft x 8ft high-security steel conex offices for forensic personnel at the St. Thomas HSI Facility in the US Virgin Islands. The project includes the construction of reinforced concrete slabs, installation of the units, and the integration of air conditioning, electrical outlets, lighting, vinyl flooring, insulation, and security features such as Cypher locks and security windows. The estimated magnitude of the contract is between $250,000 and $300,000, with a total period of performance of 364 calendar days from the Notice to Proceed. The award will be based on the lowest total evaluated price, with evaluations considering the technical approach, safety and quality control plans, and total proposed price. Contractors must adhere to the Buy American Act, follow the provided wage determination for the Virgin Islands, and ensure all personnel undergo security background checks and sign non-disclosure agreements. Key deliverables include a mandatory site survey prior to proposal submission, a project schedule due within 15 days of the Notice to Proceed, and a mandatory kickoff meeting. Payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in about 12 hours
View Details
NAICS: 238210
New
CBP: Replacement Fiber Line
Solicitation # CBP: Replacement Fiber Line
This subcontracting opportunity, issued by Management and Training Corporation (MTC) for the Earle C. Clements Job Corps Center in Morganfield, Kentucky, involves the replacement of existing multi-mode fiber optic cabling with 12 strand single mode fiber optic cabling. The project requires the removal of retired aerial fiber lines and splice boxes and the installation of new 12 strand single mode aerial fiber to provide network connectivity between the building 2436 network closet (MDF) and the building 2443 maintenance office (IDF). The contractor must provide all labor, equipment, and materials, including Belden FS3L0024NS 12 strand OS2 OSP fiber or an equivalent brand, along with necessary supports, ends, and rack-mounted enclosures. The contract is a fixed-price, single lump sum agreement with an estimated value of up to 25,000 dollars. Bids are due by October 5, 2026, and must be submitted via email to the primary point of contact, Angie Mahoney. To be considered, bidders must conduct a mandatory physical site visit, submit a bid bond guarantee, and provide a detailed cost breakout. Award decisions are based on overall best value. The project is set aside for various small business categories, including SDB, WOSB, HUBZone, VOSB, and SDVOSB. Compliance requirements include adherence to the Davis-Bacon Act for prevailing wage rates as specified in Kentucky wage determination KY20250041. Awarded contractors must possess a Unique Entity Identifier (UEI) and provide performance and payment bonds if the bid is 25,000 dollars or greater. The contract incorporates several FAR clauses regarding small business representations, foreign purchase restrictions, and the protection of sensitive government information. Final acceptance of the work is contingent upon acceptable workmanship and the completion of all punch list items as approved by the buyer and government representatives.
Earle C. Clements Job Corps Center

POSTED

about 2 hours ago

DEADLINE

in 7 days
View Details
NAICS: 238210
New
SLED
LED Lighting Project #FY2027-Phase 03- Mill Creek Elem
Solicitation # PE-55612-NONST-2027-000000037
Bulloch County Schools is soliciting proposals for the LED Lighting Project #FY2027-Phase 03 to retrofit or replace existing lighting technologies with modern LED solutions at Mill Creek Elementary School in Statesboro, Georgia. The selected contractor must conduct a mandatory site audit to identify current lighting and provide a comprehensive proposal including specific technical details on proposed LED solutions, an estimated annual energy savings report, and a detailed plan of action to complete the project within a 60-day window. Substantial completion of the work is required within 90 calendar days from the date of commencement. Proposals must be submitted in sealed envelopes by November 5, 2026, at 2:00 PM. Evaluation is based on a 100-point scale, considering factors such as company data, team personnel, references from institutional projects, and a proven track record of similar work within the last three years. Awarding is at the sole discretion of Bulloch County Schools based on the most advantageous benefit to the district. The contract requires a turn-key, all-inclusive firm cost that incorporates a 10% contingency allowance and covers all materials, labor, insurance, and bonding. Both performance and payment bonds equal to 100 percent of the contract sum are required from a corporate surety authorized in Georgia. Payment terms are net 30 days following final delivery, inspection, and acceptance by a Bulloch County Schools authorized representative.
Bulloch Board of Education

POSTED

about 13 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Georgia → Fort Valley Utility Commission

Same awarding agency

NAICS: 237130
New
SLED
BLUE BIRD EXPANSION
Solicitation # PE-33552-NONST-2027-000000021
The Fort Valley Utility Commission is soliciting sealed bids from experienced and licensed contractors for a labor-only contract to construct the electric primary feeder system for the Blue Bird Expansion Project in Fort Valley, Georgia. The scope of work involves the installation of a 7.2 kV phase-to-ground and 12.47 kV phase-to-phase three-phase underground electric distribution system. Key components include underground primary cable and conduit systems, pad-mounted transformers, PME switchgear, primary metering equipment, terminating cabinets, vaults, pads, grounding, and all associated testing and commissioning. The project supports a site expansion featuring a 918,390 square foot building and a 39,474 square foot building. Under this agreement, the Fort Valley Utility Commission will provide all major electrical materials, while the contractor is responsible for providing all labor, supervision, qualified personnel, construction equipment, tools, transportation, and safety equipment. All work must adhere to ECG Construction Assembly Specifications, NESC, OSHA, Georgia 811, and other applicable federal, state, and local requirements. A mandatory pre-bid meeting is scheduled for November 2, 2026, at 10:00 AM at 500 Anthoine Street, Fort Valley, Georgia. Bids must be submitted by the deadline of November 10, 2026, and the final completion date will be determined by Parrish Construction and Blue Bird.
Power and Communication Line and Related Structures Construction

POSTED

about 13 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS