Uninterruptable Power Supply and Electrical Switchboard Replacement Harbor Development Permit No. 25-023
Active
State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California → Long Beach, Port of
NAICS
N/A
Place of Performance
Long Beach, CASet-Aside
NONE
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Show more
AgencyCalifornia → Long Beach, Port of
Contacts2 people available
OfficeN/A
Organization / Agency
California → Long Beach, Port of
Office AddressN/A
Contacts
Full Description
Show more
Amendment 1: Remove approximately 35 feet of existing 8-foot-high ornamental fencing, including posts and foundations, and restore footing excavations and pavement to grade. Construct approximately 50 feet of new 8-foot-high ornamental fencing with new posts and 3-foot-deep concrete footings, reusing salvaged fence panels. Install a 21-foot-wide by 8-foot-high powered ornamental sliding gate with a hydraulic operator, five (5) guard pipe bollards, a concrete pad for a card reader and sensor arm, and a vehicle detector loop. The project also includes installation of a new circuit breaker within an existing electrical panel, above-grade rigid metallic conduit supported by channels and clamps, coring through an existing metal wall, and trenching approximately 9 inches wide by 3 feet deep for installation of underground PVC conduit and associated electrical wiring. Additional improvements include demolition of an existing concrete curb, pavement restoration, and yellow pavement striping.
