Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on September 8, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Uninterrupted Power Supply (UPS) Maintenance

Closed
W9124721T0500Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

NAICS

335911 - Storage Battery Manufacturing

Place of Performance

Shaw AFB, SC, 29152, USA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Sep 8, 2021 to Sep 10, 2021. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QM Micc Fdo Ft Bragg
Contacts2 people available
OfficeFORT BRAGG, NC, 28310-0000, USA
Office AddressFORT BRAGG, NC, 28310-0000, USA

Full Description

Show more
Statement of Work For Uninterrupted Power System HHBN, USARCENT Shaw AFB, SC UPDATED INFORMATION - Is there a loading dock on site? Yes - Is there room to store the batteries 1-2 days before installation? Yes - Are the units on the first floor? If not, is there an elevator available for use? Unit are on ground level - Are there any obstructions between the loading dock/entry point & the units? No Controlled by: HHBN, USARCENT CUI Categories: Contract Distribution/ Dissemination Control: FEDCON 1. SCOPE: Contractor shall provide all labor, tools, and parts, described in this Statement of Work (SOW) to perform Preventive Maintenance Inspections (PMI) and repairs to two Mitsubishi 9800A 750 Uninterrupted Power Systems (UPS) located in Building 1947, United States Army Central Command (ARCENT), Shaw Air Force Base, South Carolina. 1.1. BACKGROUND: This SOW applies to Two Mitsubishi 9800A 750 Uninterrupted Power Systems serial numbers Mitsubishi 9800A 200 09-7M73070-01 (1 each) and Mitsubishi 9800A 200 09-7M73013-03 (1 each). WORK HOURS: ARCENT work hours are from 7:00am to 6:00pm local time Monday through Friday, except Federal holidays. Emergency circumstances may occur which require the contractor to perform actions outside of normal working hours. 3. GOVERNMENT REQUIREMENTS: 3.1. The Government will provide contractor access to building 1947 for use of bathrooms, water fountains, and break areas. 3.2. During conditions of inclement weather, the contractor may use the covered Loading Dock area to prepare all electrical wiring or testing prior to installation. 4. CONTRACTOR REQUIREMENTS: 4.1. The Contractor shall perform all work on-site at building 1947, located at 1 Gabreski Drive, Shaw AFB, South Carolina 29152. 4.2 The Contractor shall furnish all labor, supervision, tools, equipment, and parts, unless otherwise stated, to perform the requirements contained in this work statement. 4.3. The Contractor shall perform the following UPS System Preventative Maintenance Checks (GOLD) Semi-Annual System Checks: 4.3.1 Physical Inspections - Visual inspection of environment for signs of impact to proper UPS operation. 4.3.2 Electrical Inspections - Verification of proper software versions and all adjustable parameters - Verification of proper cooling fan operation - Verification of proper display of system values - Review event/fault history menus 4.3.3 System Operational Check - Verify UPS is supporting critical load and no alarms are present 4.3.4 Follow Through - Document and advise customer of all findings - Review equipment operation and event/fault history with customer. - Make adjustments or take corrective action where possible - Develop a remedial action plan with customer to address major issues Annual System Checks Scope of Work 4.3.5 Physical Inspections - Internal/external visual inspection of UPS cabinet for signs of dirt and other foreign material - Visual inspection of internal components for signs of deterioration and or damage - Visual inspection of internal wiring signs of looseness, deterioration and or damage - Visual inspection of environment for signs of impact to proper UPS operation 4.3.6 Electrical Inspections - Verification of proper software versions and all adjustable parameters - Verification of proper control power supply values - Verification of proper converter/rectifier operation - Verification of proper inverter operation - Verification of proper cooling fan operation - Verification of proper static/internal maintenance bypass operation - Verification that system voltages and currents are within specifications - Verification of proper display of system values - Review event/fault history menus 4.3.7 System Operational Check - Verification of proper inverter forward & reverse manual transfer operation - Verification of proper inverter forward & reverse automatic (fault) transfer operation - Verification of proper external maintenance bypass operation - Verification of proper emergency (back up) mode of operation (after battery check only) - Verification of proper operation of peripheral products - Verification of proper operation of emergency power off (EPO) test - Verify UPS is supporting critical load and no alarms are present 4.3.8 Follow Through - Document and advise customer of all findings - Review equipment operation and event/fault history with customer. (VRLA) Battery System Preventative Maintenance Scope of WorkSystem Checks Performed Semi- Annually 4.3.9 Visual Inspections - Inspect individual battery units for signs of electrolyte leakage, venting, overheating, terminal integrity, terminal corrosion, bulging, and general cleanliness - Check battery room or area for proper temperature and ventilation 4.3.10 Cleaning - Battery cabinet interior / exterior free of dirt and debris - Battery units free of dust and debris 4.3.11 Data Recording / Measurements - Battery cabinet name plate information including date code - Ambient battery unit temperature at or near the highest physical location in the battery string - DC float voltage for each individual battery unit - Measure and record each battery units internal ohm values - Temperature of the negative terminal on each battery unit - Measure for DC ground faults 4.3.12 Battery Charger - Verify proper battery string float voltage and charging current per manufactures Specifications System Checks Performed Annually 4.3.12 * Measure and record all inter-cell and main terminal cable ohm values. Take apart and clean any connection that has an ohm value less than the manufacturer's recommended value or has a value that decreased by more than 20 % below the baseline value. Any loose connections that are found will be torqued to the battery manufacturer's recommended value. 4.3.13 * Requires DC breaker to be opened or UPS charger to be off (contingent upon customer approval) Remedial Action 4.3.14 Develop remedial action plan with customer to replace battery units where test values fall outside of the threshold. 4.4. The Contractor and all personnel working under this contract must have past experience in emergency response equipment installation as well as an advanced knowledge of working with electrical components. Contractor must be able to provide documentation of previous work performed upon request. 4.5. The Contractor shall be responsible for any malfunctions resulting from failure to follow manufacture instructions which results in violation of the manufacturer warranty regarding installation of all components. 4.6. The Contractor shall out-brief the Facility Manager on the status of the UPS on the day the maintenance is performed and send a written report within 10 working days. 4.7. Within 10 days after the contract award, the Contractor shall furnish to the Contracting Officer a personnel list containing the full name, address, date of birth, position classification, duty phone and date of employment for all employees working under this contract. The Contractor will update this list within one week after any personnel changes and submit the changes to the Contracting Officer and ARCENT Facility Manager. 4.8. The Contractor shall identify and provide a Project Manager and Alternate project Manager Designation letter to the Contracting Officer within 10 days after contract award. 4.9. The Contractor shall submit to the Contracting Officer a full report of any damages to Government property and/or equipment by the Contractor Employees. All damage reports shall be submitted within 24 hours after the occurrence. If any damages or loss of Government furnished property, to include but not limited to the UPS being worked on in accordance with this statement is caused by fault or neglect of the Contractor, the Contractor shall be responsible for the repair or replacement of the item(s), as directed by the Contracting Officer. Any such repair, replacement, or payment of cost under this paragraph shall be at the Contractor's expense. 4.10. The Contractor may be required to re-prioritize workload based on Government mission requirements. These re-prioritizations will be identified in writing by the ARCENT Facility Manager. 4.11. In the event that the Contractor cannot complete an inspection as required, the Contractor shall submit a written report to the Contracting Officer as to the reason the work could not be completed. The Contractor shall return the UPS to the same operational capacity it was before the work began. 4.12. Occupational Safety and Health: The Contractor shall comply with the Occupational Safety and Health Act (OSHA). The Contractor shall be responsible for ensuring adherence to all applicable installation, state of South Carolina, and federal rules and regulations. The Contractor shall maintain an accurate record of and shall report to the Contracting Officer at (803)751-6713, Installation Safety Office (803) 895-1985, and Security Police (803) 895-3669, by telephone or in writing within two hours of occurrence, all accidents resulting in death, traumatic injury, occupational disease, or damage to property, materials, supplies, and equipment incident to work performed under this contract. 4.13. Contractors and employees entering Shaw AFB will be required to provide a valid driver license, vehicle registration and proof of insurance at the Commercial or Main Entrance gate. 4.14. No weapons or ammunition are allowed on Shaw AFB. No hand held cell phones will be used while operating a vehicle on Shaw AFB, unless the phone is used with a Bluetooth or other type of ear piece. 5. ANTITERRORISM/OPERATION SECURITY REVIEW: 5.1. AT Level I Training: All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level 1 awareness training within 30 calendar days after the contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and sub-contractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 30 calendar days after completion of training by all employees and subcontractor personnel. AT Level 1 awareness training is available at the following website: https://atlevel1.dtic.mil/at. 5.2. Access and General Protection /Security Policy and Procedures. Contractors and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policy and procedures (provided by government representatives). The Contractor will also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshall Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. 5.2. AT Awareness Training for Contractor Personnel Traveling Overseas. This standard language text required US based contractor employees and associated sub-contractor employees to make available and to receive government provided area of responsibility (AOR) specific AT awareness training as directed by AR 525-13. Specific AOR training content is directed by the combatant commander with the unit ATO being the local point of contact. 6. CONTRACTING MANAGEMENT REPORTING (CMR): 6.1 The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report ALL Contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract Task Management Tool and Customer relationship Management via a secure data site. The Contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. The required information includes: Contracting Office, Contracting officer's Technical Representative (COTR) or also known as the Contracting Officer's Representative (COR). Contract number. Including task and delivery order number. Beginning and ending dates covered by reporting period. Contractor's names, address, phone number, e-mail address, identity of Contractor employee entering data. Estimated direct labor hours (including sub-contractors). Estimated direct labor dollars paid this reporting period (including sub-Contractors). Total payments (including sub-Contractors). Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and) separate predominant FSC for each Contractor in different). Estimated data collection cost. Organizational title associated with the Unit identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purpose of reporting this information). Locations where Contractors and sub-Contractor perform the work (specified by zip code in the United States and nearest city, country, when overseas location, using standardized nomenclature provided on website). Presence of deployment or contingency contract language. Number of Contractor and sub-Contractor employees deployed in theater this reporting period (by country). As part of its submission, the Contractor shall provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported not later than October 31 of each calendar year, beginning with 2014. Contractors may direct questions to the help desk at: http://www.ecmra.mil/. Contractors may use a direct extensible Markup Language (XML) data transfer to the database server or fill in the Fields on the website. The XML direct transfer is a format for transferring files from a Contractor's systems to the secure website without the need for separate data entries for each required data element at the website. The specific formats for the XML direct transfer may be downloaded from the website. 7. WARRANTY: 7.1. Contractor shall provide a three (3) year warranty for all new parts installed to include parts and labor. Warranty work request shall include the contractor's travel to Shaw AFB. 8. COMPLETION: The period of performance is one year with four option years from the date of the award of the contract.

More opportunities from Department Of Defense → W6QM Micc Fdo Ft Bragg

Same awarding agency

NAICS: 481211
New
Federal
Airborne Special Operations Testing Directorate Wet Blade Hours IDIQ
Solicitation # W91247-27-Q-A004
The Mission and Installation Contracting Command at Fort Bragg is soliciting a non-personal services IDIQ contract for the Airborne and Special Operations Test Directorate to provide flight services for military Static Line and Military Free Fall parachute operations. This total small business set-aside, specifically designated for Economically Disadvantaged Women-Owned Small Businesses, requires the contractor to provide all necessary personnel, aircraft, equipment, and maintenance supervision. The contract spans a five-year ordering period from December 1, 2026, to November 30, 2031, with an estimated total of 150 flight hours, averaging 30 hours per year. The contract value is estimated between 500 and 500,000 USD. To be eligible, offerors must be DoD-approved commercial operators listed on the Air Mobility Command Commercial Airlift Review Board Paratroop Commercial Operator Listing or provide a passing inspection report per DoD Instruction 4500.53, alongside an active FAA Part 135 Air Carrier Certificate or approved FAA Part 91 status. A critical requirement is the submission of a maintenance support plan ensuring aircraft can be repaired or replaced within 24 hours of a mechanical failure. Award will be determined using the Lowest Price Technically Acceptable method, evaluating mission capability based on aircraft performance, staffing, and aviation compliance. Invoicing will be managed electronically through the Wide Area WorkFlow system.
Nonscheduled Chartered Passenger Air Transportation

POSTED

1 day ago

DEADLINE

in 13 days
View Details
NAICS: 562991
Federal
Camp Lejeune Shower Services
Solicitation # W9124727QA002U00001
This non-personal services, fixed-price contract is a total small business set-aside, including HUBZone and SDVOSB categories, to provide temporary shower trailer services for the 1st Battalion, 505th Parachute Infantry Regiment, 82nd Airborne Division. The services will support an off-post training exercise at Camp Lejeune, North Carolina, with a period of performance from November 16 to November 19, 2026. The contractor is responsible for the delivery, setup, and full operational readiness of the facilities no later than 1700 hours on November 15, 2026. The required configuration must be gender-segregated with at least sixteen shower heads and a self-sustaining potable water supply of at least 8,250 gallons per day, including the legal collection and disposal of greywater. The contractor must provide power generation, fuel supply with secondary containment, and perform cleaning and sanitization twice daily. Additionally, the contractor must provide 24-hour emergency maintenance with a maximum two-hour on-site response time. Award will be based on the most advantageous offer considering price, technical capability, and past performance within the last three years. Offerors must submit a Quality Control Plan with their quote by October 22, 2026. The contract incorporates various federal regulations, including specific requirements for insurance on government installations, cybersecurity safeguarding of defense information, and strict adherence to the Service Contract Labor Standards.
Septic Tank and Related Services

POSTED

8 days ago

DEADLINE

in 1 day
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS