Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Justice was posted on June 4, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Uninterruptible Power Supplies (UPS) Battery Back Up

Closed
15b61918Q00000003Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 335999
New
Federal
Prototype Stripline Kickers
Solicitation # MB483335
Brookhaven Science Associates, LLC, operating Brookhaven National Laboratory for the Department of Energy, is soliciting quotes for the design, fabrication, assembly, and delivery of one stripline kicker prototype for the Electron Storage Ring at the Electron-Ion Collider. The scope of work includes the production of a brass RF mockup to verify geometry and impedance, followed by the detailed mechanical design and fabrication of the full prototype, which incorporates kicker bodies, stripline electrodes, cooling features, and ultra-high-vacuum feedthrough interfaces. The contractor is responsible for comprehensive testing and verification, including RF electrical characterization, vacuum certification, and thermal and leak tests, all while adhering to BNL-QA-101 and UHV fabrication practices. The contract is a combined type with a performance period of 18 months from the effective date. Award will be granted to the responsive and responsible contractor offering the lowest total price who meets all technical requirements. Proposals must be submitted via email to the designated Contract Specialist by December 4, 2026, and must include the signed pricing sheet on Enclosure C along with a separate document detailing how the company meets the RFQ requirements. All shipments must comply with ASTM Standard D 3951-10 for commercial packaging and be delivered FOB Destination, Freight Prepaid, to Upton, New York. Domestic vendors must be registered in the System for Award Management, while foreign vendors must complete AMS-Form-050.
Brookhaven National Labor -Doe Contractor

POSTED

about 8 hours ago

DEADLINE

in about 2 months

General Info

Contract Value

$33,929

NAICS

335999 - All Other Miscellaneous Electrical Equipment and Component Manufacturing

Place of Performance

741-925 Herlong Access Road, HERLONG, CA, 96113, USA

Set-Aside

NONE

Award Issued Date

Documents

5

Cover_Letter.docx

DOCX

RFQ.pdf

PDF

UPS_Requirement.docx

DOCX

UPS_Requirements_2.docx

DOCX

UPS_Requirements_2.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

Response deadline changed from May 16, 2018 to May 21, 2018. The notice description changed.

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Justice → Fci Herlong
Contacts1 person available
OfficeHERLONG, CA, 96113, USA
Office AddressHERLONG, CA, 96113, USA
Contacts
Trevor PolanContract Specialist

Full Description

Show more
Numbers 6 and & are new additions. 1. Item (2) has been changed from a quantity of 5 to a quantity of 6. 2. The need for an external bypass has been removed. FCI Herlong will now use the existing external bypass. (Model APE-01-MBB-A) 3. The UPS systems must be designed to be hardwired into an external bypass without voiding the UPS warranty. The UPS must be HARDWIRED to the input and output of the NEW UPS. The UPS system must be compatible with the existing external bypass (Model APE-01-MBB-A). 4. The runtimes have been changed to a minimum runtime of 85 minutes each. 5. The UPS systems must run at a minimum of 90% efficiency at full load and 80% efficiency at 10% load. 6. The units must have web /SNMP card. 7. The existing bypass that will be used is a Powerware ( APE-01-MBB-A)

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS