Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Arizona was posted on January 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

UNION HILLS WATER TREATMENT PLANT - FINISHED WATER IMPROVEMENTS - CONSTRUCTION MANAGER AT RISK

Closed
WS85050052-CMARState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The City of Phoenix is seeking qualified candidates for the construction management role under the "Union Hills Water Treatment Plant - Finished Water Improvements" project, structured as a Construction Manager at Risk (CMAR) contract. Interested parties must submit their qualifications through the City's Procurement Portal by January 30, 2026, at 7:00 PM. The solicitation, identified by number WS85050052-CMAR, was posted on January 8, 2026, and is managed by the Design and Construction Procurement agency of Arizona. This contract involves improvements to the finished water systems at the Union Hills Water Treatment Plant, and the focus is on engaging a construction manager who will take on risk-related responsibilities during the project's execution. The office managing this contract is based in Phoenix, Arizona. For further details or inquiries, the primary contact is Julie Smith, Contract Specialist II, reachable via email or phone. The procurement portal provides all necessary information and submission capabilities for interested firms.

General Info

City of Phoenix seeks CMAR for Union Hills Water Treatment Plant improvements, submit by 1/30/2026.

Documents

5
DOC, High priority: read this first2 pages · amendment
High
DOCX, High priority: read this firstcontractor-reference-check
High
PDF, High priority: read this first5 pages · reference-check-instructions
High
PDF, High priority: read this first13 pages · rfq
High
PDF, High priority: read this firstrfq
High

Read all 5 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 14 days
  • Lift Station No. 85 ReplacementOpen now, due in 25 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyArizona → Design and Construction Procurement
Contacts1 person available
OfficePHOENIX, AZ, 85003, USA

Full Description

Show more
The City of Phoenix is requesting qualifications for Project Title . Qualifications are to be submitted via the City's Procurement Portal at https://procurement.opengov.com/portal/phoenix before Response Submission Time on Response Submission Date .

More opportunities from Arizona → Design and Construction Procurement

Same awarding agency

NAICS: 237110
New
SLED
ARIZONA SCIENCE CENTER STORMWATER AND SEWER PIPE REPLACEMENT CONSTRUCTION MANAGER AT RISK SERVICES
Solicitation # PW26740069
The City of Phoenix is seeking a Construction Manager at Risk (CMAR) for the Arizona Science Center Stormwater and Sewer Pipe Replacement project, with an estimated construction cost of $8.2 million. The scope of work involves the replacement or approved remedy of all existing drain, waste, vent, and storm drainage systems to address aging infrastructure. The selected CMAR will provide preconstruction services, including detailed cost estimating and budget validation, and will be responsible for developing two Guaranteed Maximum Price (GMP) proposals in MAG or CSI format. Construction services include site operation management, safety oversight, and a requirement for 24-hour, 7-day emergency response coverage with on-site arrival within two hours of notification. The project also includes an add alternate for ADA upgrades, specifically adult changing stations, and may require the use of the UNIFIER project management database. Qualified firms must submit a Statement of Qualifications (SOQ) and a separate bonding capacity statement from a surety company rated A- or better by December 11, 2026. The SOQ is limited to 12 pages and must be submitted electronically via the City's Procurement Portal. Evaluation criteria focus on the firm's general information, key personnel, and experience with at least three comparable CMAR projects. The contract emphasizes Small Business Enterprise (SBE) participation, requiring the CMAR to implement goals for local SBEs located within Maricopa County. Required documentation for GMP submittals includes a Contractor’s Statement of Proposed SBE Utilization and Letters of Intent for each SBE subcontractor. There is no specified set-aside status for this solicitation.
Water and Sewer Line and Related Structures Construction

POSTED

about 14 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237110
New
SLED
SANITARY SEWER REHABILITATION PROGRAM JOB ORDER CONTRACT
Solicitation # JOC261
The City of Phoenix is seeking up to five qualified contractors for the Sanitary Sewer Rehabilitation Program Job Order Contract (JOC261). This on-call program focuses on the rehabilitation of sanitary sewer pipes, primarily those with 8-inch to 15-inch diameters, using cured-in-place pipe (CIPP) lining as the primary method, alongside occasional dig-and-replace operations. The scope of work includes CIPP structural liner installation, PVC-liner repair, manhole rehabilitation, sewer cleaning, CCTV digital scans, bypass pumping, and trenching. The contract has a duration of 36 months with a potential value of up to $50,000,000, though individual JOCs are capped at $30,000,000. Selection is based on a qualifications-based process using Statements of Qualifications (SOQs), with evaluation factors including general firm information, Arizona contractor licensing, and performance evaluations from references. Submittals must be electronic, in PDF format, and limited to 10 pages, excluding the information sheet and a required separate bonding capacity statement. The response deadline is November 30, 2026, at 12:00 pm Phoenix time. While the contract includes Small Business Enterprise (SBE) clauses and reporting requirements, the specific SBE goal for this project is set at 0.00%. There is no specific set-aside status for this solicitation.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 10 days
View Details
NAICS: 236220
New
SLED
ESTRELLA CIVIC SPACE BRANCH LIBRARY (GO BOND) AND ROAD IMPROVEMENTS CONSTRUCTION MANAGER AT RISK SERVICES
Solicitation # PA75200751 & LS71200119
The City of Phoenix is seeking a qualified Construction Manager at Risk (CMAR) to provide preconstruction and construction services for the Estrella Civic Space Branch Library (GO Bond) and Road Improvements project. Located near W. Lower Buckeye Road and S. 99th Avenue, the project has an estimated construction cost of $9.7 million. The scope includes the construction of a 12,000 square foot branch library with associated parking and landscaping, as well as significant street improvements including a new traffic light at 95th Avenue, bike lanes, and center medians. The selected CMAR will be responsible for delivering the project through a Guaranteed Maximum Price (GMP) contract, with the GMP required to be submitted in MAG or CSI format. Selection is based on a qualifications-based process evaluating project approach, firm experience, key personnel qualifications, and reference checks, with additional points awarded for interviews. Applicants must submit a Statement of Qualifications (SOQ) in PDF format, not exceeding 20 pages, along with a separate bonding statement from a surety company rated A- or better. Submissions are due by December 4, 2026, via the City's Procurement Portal. The project incorporates a Small Business Enterprise (SBE) program, requiring contractors to submit a Statement of Proposed SBE Utilization and Letters of Intent. Administrative requirements include the use of the UNIFIER project management database for invoicing and progress payments.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 14 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS