Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Unitized Curtainwall Facade Enclosure

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of D1-A25012-00.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

UCSD - Hillcrest Medical Center Renewal (HMCR) Hospital & CUP Wave 3 - Bid Packages 1.09 – Unitized Curtainwall / 1.10 – Structural Steel / 1.11 – Elevator

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 23 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 2 documents on the prime contractFrom UCSD - Hillcrest Medical Center Renewal (HMCR) Hospital & CUP Wave 3 - Bid Packages 1.09 – Unitized Curtainwall / 1.10 – Structural Steel / 1.11 – Elevator
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → DPR Construction
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → DPR Construction
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs unitized curtainwall facade enclosure systems for prime contractors on University of California, San Diego hospital projects. Fabricates and installs unitized systems, provides visual and performance mockups, and performs detailed BIM coordination. Requires HCAI submission and seismic engineering. Must be DIR registered and compliant with prevailing wage and skilled/trained workforce requirements. Delivers the installed curtainwall system and approved mockups.

Similar Contracts

Same NAICS industry code

NAICS: 238190
New
CBP7857 Center Gate Replacements
Solicitation # CBP7857
Management and Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum subcontract to provide fence and gate repair services at the Sierra Nevada Job Corps Center in Reno, Nevada. The scope of work includes providing all labor, materials, equipment, and supervision to repair or replace designated drive gates, specifically focusing on the Building 29 South Drive Gate. Contractors must perform field verification of dimensions and hardware, execute structural repairs or full assembly replacements if damage exceeds 50 percent, and provide two sets of operation and maintenance manuals along with manufacturer and installer warranties. The estimated price range for this project is between 0 and 25,000 dollars. Bids are due by November 17, 2026, and must be submitted using the MTC Bid for Lump Sum Contract form accompanied by a detailed cost breakout on company letterhead. A physical site visit and signature on the attendance roster are mandatory prerequisites for bid submission. For bids equal to or greater than 25,000 dollars, a bid bond guarantee of 20 percent of the base bid is required, and the awarded contractor must provide performance and payment bonds within five business days of the Intent to Award Letter. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to Construction Wage Rate Requirements, necessitating compliance with prevailing wage rates for Washoe County, Nevada, and the submission of certified payroll reports. Award decisions will be based on overall best value. Final acceptance of the work is contingent upon a substantial completion inspection, the resolution of a punch list, and the submission of a Notice of Final Completion and a Certificate of Release of Liens.
Sierra Nevada Job Corps Center

POSTED

about 5 hours ago

DEADLINE

in about 19 hours
View Details
NAICS: 238190
New
SLED
Buena Vista Stormwater Pump Station Platform Repairs
Solicitation # US24005
The City of Stockton is soliciting bids for the Buena Vista Stormwater Pump Station Platform Repairs under solicitation US24005. The project requires a contractor to provide all labor, materials, and equipment to replace floor grating over existing sump pits A and B. Following Option 2 of the project plans, the contractor will abandon the existing grating configuration and install a new steel framed platform. The scope includes mobilization, demolition, installation of new framing and grating, and repairs to the top of the concrete wall. All work must be performed in accordance with the City of Stockton Standard Specifications, Caltrans Standard Specifications, and the California Building Code, specifically Chapter 17 for special inspections. The contract will be awarded to the lowest responsive bidder, with responsiveness contingent upon the disclosure of subcontractors and the provision of a bid guaranty of at least 10 percent of the total base bid price. The successful bidder must provide both Labor and Materials and Faithful Performance Bonds for 100 percent of the contract price and adhere to prevailing wage rates. Performance is managed by a Construction Manager, with payments issued monthly based on percentage completion. Bidders must submit sealed bid packets, including a Non-Collusion Declaration and proof of DIR registration, to the Office of the City Clerk by 2:00 p.m. on December 3, 2026.
City of Stockton

POSTED

about 8 hours ago

DEADLINE

in 17 days
View Details

More opportunities from California → DPR Construction

Same awarding agency

NAICS: 238150
New
SLED
UCSD - Hillcrest Medical Center Renewal (HMCR) Hospital & CUP Wave 3 - Bid Packages 1.09 – Unitized Curtainwall / 1.10 – Structural Steel / 1.11 – Elevator
Solicitation # D1-A25012-00
The University of California, San Diego is soliciting bids for the Hillcrest Medical Center Renewal (HMCR) Hospital and CUP Wave 3 project, managed by DPR Construction. This solicitation, numbered D1-A25012-00, covers three specific bid packages: Unitized Curtainwall (1.09), Structural Steel (1.10), and Elevators (1.11), with estimated Phase 2 values of $37M, $65M, and $16M respectively. The total estimated construction cost for the overall project ranges between $1.5 billion and $2 billion. The Phase 1 project is estimated to last 28 months, beginning in May 2026 and concluding in September 2028 at 4300 1st Avenue, San Diego, California. Key deliverables for all scopes include HCAI submission, seismic engineering, and detailed BIM coordination, with additional visual and performance mockups required for the curtainwall. To be considered responsive, bidders must have participated in the mandatory pre-bid conference on October 28, 2026, and must be registered with the Department of Industrial Relations (DIR) per Labor Code sections 1725.5 and 1771.1. This is a prevailing wage project with skilled and trained workforce requirements. Technical proposals are due by November 20, 2026, and the final bid form, bid bond, and schedule of values must be submitted via Building Connected by December 9, 2026. The project emphasizes the participation of Small Business Enterprises (SBEs) and Disabled Veteran Business Enterprises (DVBEs).
Glass and Glazing Contractors

POSTED

about 6 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS