This Solicitation opportunity from California was posted on March 27, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Addendum No. 1 - U4 Tank Replacement Project: Addendum No. 1 for the City of Santa Cruz Water Department's U4 Tank Replacement Project. It provides clarifications on DBE Good Faith Efforts and the mandatory pre-bid meeting date (April 17), and replaces Exhibits and Project Specifications with revised versions (Rev1). The bid opening date remains May 1, 2024, at 3:00 PM. Bidders must submit the signed receipt acknowledgement (Exhibit A) with their bid.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for City of Santa Cruz Water Department - U4 Tank Replacement Project - Addendum No. 2: Addendum No. 2 for the U4 Tank Replacement Project, issued by the City of Santa Cruz Water Department. Key changes include extending the bid opening date to May 9, 2024, at 3:00 PM. It also clarifies that welded steel tanks will not be accepted as substitutes for the required U4MT bolted steel tanks. Bidders must sign and submit Exhibit A to acknowledge receipt.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for CWO #2023-007 U4 Tank Replacement Project Specifications: Technical specifications and bidding requirements for the City of Santa Cruz Water Department's U4 Tank Replacement Project (CWO #2023-007). The document includes professional seals from civil and electrical engineers, a comprehensive table of contents covering bidding requirements (Division 00), general specifications (Division 01), and technical specifications (Divisions 02-49). Bids were scheduled to open on May 1, 2024.
PDF
PDF, High priority: read this firstifb
HighAI Summary for CWO #2023-007 U4 Tank Replacement Project Specifications: Invitation for Bid (IFB) and technical specifications for the City of Santa Cruz Water Department's U4 Tank Replacement Project (CWO #2023-007). The document includes the table of contents for bidding and contracting requirements, general specifications, and technical specifications for site work. Bids were scheduled to open on May 1, 2024.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for U4 TANK BID PLANS 6 OF 6 - El P&ID: Technical drawing and Piping and Instrumentation Diagram (P&ID) for the U4 Tank project, provided as part of the bid plans for procurement.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for U4 Tank Bid Plans - Tank and Pumphouse: Technical bid plans and specifications for a tank and pumphouse project, including demolition notes for existing piping, hazardous material warnings, and detailed engineering specifications for thrust ring fabrication and pipe dimensions.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for U4 Tank Bid Plans - Topo Survey: Technical drawing/document containing topographic survey data as part of the bid plans for the U4 Tank project.
PDF
PDF, High priority: read this first2 pages · specifications
HighAI Summary for University 4 Tank Replacement - Structural Specifications: Structural specifications and foundation plan details for the University 4 Tank Replacement project for the City of Santa Cruz Water Department. Dated January 31, 2024, the document includes technical requirements for reinforcement, concrete (4,000 psi), structural steel, seismic/wind design criteria, and post-installed anchorages.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for University Tank 4 Replacement - Civil Bid Plans: Technical civil engineering plans and specifications for the University Tank 4 Replacement project (Job Number 22109). The document includes a primary tank step 3 detail, erosion control plans, and supply profiles for the maintenance and surge tanks.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for University Tank 4 Replacement Project - Geotechnical Investigation: A geotechnical investigation report dated July 13, 2022, prepared by Pacific Crest Engineering Inc. for MME Engineering. The document provides subsurface soil analysis, boring logs, and engineering recommendations for the replacement of a 400,000-gallon water storage tank and the construction of a 35,000-gallon maintenance tank in Santa Cruz, California.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for University Tank 4 Replacement Project - Geotechnical Investigation Report: A geotechnical investigation report dated July 13, 2022, prepared by Pacific Crest Engineering Inc. for MME Engineering. The document provides subsurface soil analysis, boring logs, and engineering recommendations for the replacement of a 400,000-gallon water storage tank and the construction of a 35,000-gallon maintenance tank at University Tank Site 4 in Santa Cruz, California.
Bids will be received for a single prime contract for replacement of the existing steel 400,000-gallon potable water storage tank known as University Reservoir No. 4 (U4) which serves the University of California Santa Cruz (UCSC) campus and local Westside customers (Project). The Project includes decommissioning and removal of the old storage tank, construction of a new steel 400,000-gallon storage tank on the existing foundation, pump control upgrades and fire hardening of the roof of the U6 pump station. To meet system demands for the University and protect water supply pumps while the main reservoir is being replaced, a 40,000-gallon maintenance tank will be installed as part of the Project. Two road pullouts will be paved along the narrow quarter mile access road to allow small fire trucks and other vehicles to turn around. Other project work at the site will include replacing fencing and existing drainage infrastructure, installation of a new curb and gutter, and minor resurfacing and repairs to the access road once construction is complete.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award