This Solicitation opportunity from Nevada was posted on March 28, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
UNR - Upgrade Classroom Technology Infrastructure at University of Nevada Reno at Lake Tahoe Multiple Buildings
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract involves upgrading the audio and video systems across multiple classrooms and labs at the University of Nevada, Reno Lake Tahoe Campus, with a focus on architectural and electrical work. The project is a prevailing wage construction effort with an estimated cost ranging from $150,000 to approximately $226,000, and it requires the contractor to adhere to specific insurance requirements, including general liability, automobile liability, workers' compensation, pollution liability, and builders risk insurance. The work is scheduled to commence on June 3, 2024, and must be completed by August 23, 2024, with potential adjustments based on the academic calendar to minimize disruption. Bidders must submit responses electronically through a designated system, as hard copies are no longer accepted, and they can prepare responses in advance using the system's save feature. Once the bidding period closes on April 18, 2024, responses will be publicly unsealed and posted online, allowing transparency and review of all submissions. Additionally, vendors are required to register with the Nevada System of Higher Education's new payment system to facilitate payment processing, with instructions provided for registration and account verification.
General Info
Place of Performance
NV, USASet-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- Concept and Detailed Design ServicesOpen now, due in 199 days
- Architectural Design & EngineeringOpen now, due in 29 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
**NSHE recently migrated to a new payment system that requires all of our vendors register with the system in order for our Controllers office to allow us to pay you. Please visit the following link for the NSHE Supplier Registration system to sign up for a new account: https://suppliers.nevada.edu/Membership/Secure/CreateUser.aspx. This process only needs to be completed once. If you believe you already have an account set up please confirm by searching for your company at this link: https://suppliers.nevada.edu/FindSupplier.aspx. If your company is listed and shows the Supplier Status as anything other than “Accepted” then there are still steps that must be completed before your registration is approved.
**Once an ITB/RFP/RFQ/CMAR is released for bidding, bidders may begin working on their response and uploading required documents without submitting their bid early. The NGEM system allows for bidders to save their work. Please make use of this capability in order to give your company enough time to review your response and upload any other documents on the day the ITB/RFP/RFQ/CMAR closes so that you do not miss the cut-off time.
**Once the ITB/RFP/RFQ/CMAR closes and the responses are unsealed electronically, the list of bidders/responders will be immediately posted online and available to the public for viewing. This document can be accessed by clicking on Closed Bid Opportunities, selecting the specific opportunity, and scrolling down to Bid Documents. The Bid Tabulation document will be available for review there.
Description of Work: This is a prevailing wage project. The scope of work is to upgrade the audio/video system in several classrooms/labs at UNR Lake Tahoe Campus. The scope includes architectural and electrical work. UNR Project#: #23MNC02602 Labor Commissioner #: WA-2023-360 SPWD Project #24-B029 Estimated Cost Range: $150,000 to $225,980 Liquidated Damages: $500/day Special Considerations: It is possible that the construction schedule could be affected by academic activities at UNR Lake Tahoe campus. The general contractor will collaborate with the UNR project manager and UNR Lake Tahoe representative to minimize the construction's impact on academic activities.
Required Insurance if Awarded: Commercial General Liability, Business Automobile Liability, Workers' Compensation, Contractors Pollution Liability Insurance, and Builders Risk Insurance will be required. Please refer to the TEMPLATE-Owner-Contractor Construction Agreement on the Attachments tab for limits and additional information and in compliance with the requirements set forth here: https://www.unr.edu/bcn-nshe/risk/contracts. Completion of Work: Subject to change by Owner, Work is scheduled to begin on "June 3, 2024" and shall be fully complete by "August 23, 2024."
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
