This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on January 13, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Update 7-Mold Remediation in Denton, Texas

Closed
0863Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was initiated following a sprinkler system failure that caused significant water damage. The scope of work requires the remediation of all visible and exposed interior building components and the cleaning or replacement of damaged theater seating cushions. All activities must adhere to ANSI/IICRC S520 standards, EPA guidelines, and OSHA regulations, with a specific requirement to achieve interior humidity levels of 50 percent or less. Key deliverables include the provision of a Certified Industrial Hygienist to verify materials and perform final clearance, a detailed mold remediation plan involving HEPA filtration and negative air pressure, and a final written report of findings. This is a single lump sum contract set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Award decisions are based on best value, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must provide a valid Indiana Contractor's License, proof of automobile and workers compensation insurance, and certification of compliance with Davis Bacon Act wage rates. The contractor must start work within 14 days of the Notice to Proceed and provide a sequenced construction schedule within 10 days. Payment is issued on Net 30 terms, and the Atterbury Job Corps Center is tax-exempt. Proposals must include a detailed cost breakdown, a timeline for substantial completion, and a 90-day bid guarantee.
Atterbury Job Corps Center

POSTED

about 8 hours ago

DEADLINE

in 16 days
NAICS: 562910
New
Maui JCC Mold Remediation and Removal of Water-Damaged Materials
Solicitation # maui-jcc-mold-remediation-removal-water-damaged-materials
Management & Training Corporation (MTC), acting as the operator for the U.S. Department of Labor, is soliciting bids for a fixed-price, single lump sum contract for mold remediation and removal of water-damaged materials at the Maui Job Corps Center in Makawao, Hawaii. The project focuses on Building 11, specifically the cafeteria, food service areas, restrooms, and adjoining spaces, following severe windstorm damage. The scope of work includes the removal of mold-affected porous materials such as drywall and ceiling tiles, the establishment of containment using HEPA-filtered negative air pressure to protect adjacent areas, and the remediation of structural surfaces in accordance with EPA guidance. The estimated price range for the project is between $25,000 and $100,000. Bids will be evaluated based on overall best value, and a physical site visit is mandatory prior to submission. For bids of $25,000 or more, contractors must provide a bid bond guarantee equal to 20% of the base bid, and the awarded contractor will be required to provide performance and payment bonds from a surety company with at least an A- rating. Compliance with the Davis-Bacon Act and specific Hawaii wage determinations is required. Payment is based on a Schedule of Values using AIA documents, with a 10% retainage withheld until substantial completion. This opportunity is set aside for various small business categories, including VOSB, SDVOSB, WOSB, and HUBZone certified firms.
Management & Training Corporation/Hawaii/Maui Job Corps Center

POSTED

about 8 hours ago

DEADLINE

in about 10 hours

General Info

NAICS

562910 - Remediation Services

Place of Performance

Denton, TX, USA

Set-Aside

SBA

Documents

5

BSI Project 2024-2118: Mold Remediation Procedures

PDF, High priority: read this firstspecifications
High

RFQ 0863 - Contract Specialist, Mt. Weather, VA

DOCX, High priority: read this firstrfq
High

SOW - Mold Remediation in the DT MERS FRF Room

DOC, High priority: read this firstsow
High

Wage Determination TX20240243 - Denton County, Texas

PDF, High priority: read this firstwage-determination
High

BSI Project 2024-2118: FEMA - VSAB 1 FRF Limited Initial Mold Assessment Report

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

9 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice title changed. The notice description changed.

Notice updated

Response deadline changed from Jan 10, 2025 to Jan 14, 2025. The notice title changed. The notice description changed.

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice title changed.

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice title changed. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → National Continuity SECTION(CON50)
Contacts2 people available
OfficeBERRYVILLE, VA, 22611, USA
Office AddressBERRYVILLE, VA, 22611, USA
Contacts
Abigail Atkinson

Full Description

Show more
Update 7: Additional Question and Answer provided. What is the timeframe that the Mold Consultant (Industrial Hygienist) recommends for leaving the air filtration devices in scrub mode prior to conducting clearance sampling? This information is crucial for determining the number of days the HEPA air filtration devices and other related equipment will need to remain on-site. The Air Filtration devices (scrubbers) need to be in place from the start of the project until clearance is obtained. Update 6: Additional Question and Answer provided. Question: Is the HVAC subcontractor expected to replace any components of the HVAC system that do not work properly such as the evaporator coils, drain pans, the return and supply plenums as well as the ductwork (if cant be cleaned) and does this need to be included in the quote, or will the replacement of parts be a change order? No, contractor is not expected to replace major HVAC components. The HVAC duct cleaning as was specified by the company that did the mold testing: - If ductwork is uncleanable, the Remediation Contractor shall Poly off both ends and discard as necessary Update 5: Additional Questions and Answers provided. Original Question: Any pictures of the affected areas? FRF is designated as a TEMPORARY SECURE WORK AREA (TSWA) & no pics are allowed. Follow-up Question: How were the pictures acquired on the Brighton Solutions documents attached on SAM.Gov? can other photos of the ceiling and other areas not be acquired? Those items (shoes / chair) were temporarily pushed outside the FRF and pics taken outside the FRF. 2. Original Question: Is there any affected insulation material above the grid? It is often overlooked and usually has to be replaced once the ceiling tiles are relaced, the SOW makes no mention of this. If we find it damaged and in need of replacement, will this be a bilateral agreement added later on? Maintenance techs inspected and stated that the insulation does not rest on the ceiling tiles. The insulation is suspended above the tiles by wire mesh. Follow-up Question: So the Insulation IS NOT part of the remediation? As stated in section 1.3? No. (I am told by maintenance personnel that the insulation is suspended by wire above the ceiling tiles). 3. Original Question: SOW mentioned damaged framework above grid needs to be repaired. Are there any pictures of the damaged areas? FRF is designated as a TEMPORARY SECURE WORK AREA (TSWA) & no pics are allowed. Follow-up Question: Same as #1 No picture taking is allowed inside the FRF room. 4. Original Question: At which point will a decision to be made of repair or total replacement of the grid if it needs to be replaced in its entirety? The replacement of all ceiling tiles and all metal framing is stated on the SOW as a requirement. Follow-up Question: The SOW only reference grid straightening not replacement. The SOW was updated to indicate that al ceiling tiles and supporting metal framing is required to be replaced. 6. Original Question: Is there a Mold Remediation Protocol as completed by a licensed TDLR MAC? Can that be provided? Unfortunately, we do have the experience nor have an SME on site to answer those questions. Follow-up Question: The Brighton Solutions, if they are a TDLR MAC, then they would be the company to create the Remediation protocol. The SOW sated that vendor must sub contract that out separately. 8. Original Question: Will the 3rd party clearance be the original MAC or will the remediation contractor be required to coordinate that effort? It is our understanding that Contractor needs to acquire clearance thru and independent and certified vendor. Follow-up Question: If there is already a consultant (Brighton Solutions) then they would be the company to perform the clearance. This is not a function of the remediation company under TDLR mold rules. We FEMA do not have the expertise to answer this. 9. Original Question: The SOW calls for the cleaning of IT equipment; are those units running and will they remain running during the remediation? Yes, one IT rack will be running. Follow-up Question: This will have to be wrapped according to the protocol and will possibly cause a problem of heat could be an issue. It is my understanding that the IT rack hasn't be cleaned also. Once cleaned, FEMA has two options to mitigate the heating issue; 1 is to relocate the IT rack outside the FRF room. 10. Original Question: What was the Identified underlying cause of the fungal growth? Has this been addressed or will that be on the contractor? HVAC leak and not cooling caused excessive moisture buildup. AC leak to be repaired by separate contractor. Follow-up Question: HVAC duct cleaning cannot be completed during a mold remediation per TDLR regulation. The SOW states if this is needed, is the contractor's responsibility to ensure this gets done. Update 4: Additional Questions and Answers provided. Additional Questions and Answers: 1. Any pictures of the affected areas? FRF is designated as a TEMPORARY SECURE WORK AREA (TSWA) & no pics are allowed. 2. Is there any affected insulation material above the grid? It is often overlooked and usually has to be replaced once the ceiling tiles are relaced, the SOW makes no mention of this. If we find it damaged and in need of replacement, will this be a bilateral agreement added later on? Maintenance techs inspected and stated that the insluation does not rest on the ceiling tiles. The insulation is suspended above the tiles by wire mesh. 3. SOW mentioned damaged framework above grid needs to be repaired. Are there any pictures of the damaged areas? FRF is designated as a TEMPORARY SECURE WORK AREA (TSWA) & no pics are allowed. 4. At which point will a decision be made of repair or total replacement of the grid if it needs to be replaced in its entirety? The replacement of all ceiling tiles and all metal framing is stated on the SOW as a requirement. 5. There are stages at which the remediated area will need to be put back into service, once clearance is achieved. 1.1 Replacement of HVAC duct work if it is found uncleanable (this will be skipped if ductwork is cleaned) 1.2 Bent framework needs to be corrected 1.3 insulation needs to be replaced 1.4 Tiles will need to be replaced and any fitting of tiles will be done at this time. 1.5 Final cleaning and turnover to client. The question will be, is the awarded vendor responsible for the purchasing of ceiling tiles and insulation, and subcontracting the HVAC contractor if the ductwork is uncleanable? Yes. 6. Is there a Mold Remediation Protocol as completed by a licensed TDLR MAC? Can that be provided? Unfortunately, we do have the experience nor have an SME on site to answer those questions. 7. This is a TDLR notifiable project. That must be completed and filed will it be a routine or emergency project? Unfortunately, we do have the experience nor have an SME on site to answer those questions. 8. Will the 3rd party clearance be the original MAC or will the remediation contractor be required to coordinate that effort? It is our understanding that Contractor needs to acquire clearance thru and independent and certified vendor. 9. The SOW calls for the cleaning of IT equipment; are those units running and will they remain running during the remediation? Yes, one IT rack will be running. 10. What was the Identified underlying cause of the fungal growth? Has this been addressed or will that be on the contractor? HVAC leak and not cooling caused excessive moisture buildup. AC leak to be repaired by separate contractor. 11. The SOW 2.0A states - Service area(s) - VSAB 1 FRF Approximate Amount of Impacted Material - Shoes and leather chair, and less than 25 sf of contiguous visible mold growth was this determined by a TDLR MAC? Yes, Brighton Solutions. 12. Was there a previous project for this requirement or is this a new requirement? We would like to know if this is a brand new contract OR if there is (was) an incumbent performing these services. If not brand new, could you please provide the current / previous contract number? No Previos Project. New Contract. 13. Is there a wage determination? Wage determination for the Denton area is attached to this solicitation. 14. Can you please provide the specifications of the ceiling tiles? Fifth Avenue 280; 2 ft x 4 ft x 5/8 inch; Commercial Equivalent, Fissured 562. 15. Could you kindly confirm which section or specifications detail the protocol for this project? Your guidance will be greatly appreciated to ensure my understanding aligns with the requirements. The SOW lists this. Update 3: POC email for site visit has been updated as incorrect email was provided previously and two attachments have been added which are the two reports received from Brighton solutions regarding the Initial Mold Assessment Report of what they discovered in the FRF room. Update 2: Submission deadline extended to January 14, 2025 by 5:00 PM ET. Update 1: Questions and Answers and Wage Determination attached. Questions and Answers: What is the square footage of the FRF room requiring remediation? FRF room measures approx 50 X 50, so 2,500 sq ft. Are there any known water sources/leaks that need to be addressed as part of the remediation? No known sources What type of mold has been identified through testing, if any? I believe it was black mold, (this should be in the SOW) Are there any special security clearance requirements for personnel? Yes, every employee will have to have pass an NCIC (National Crime Information Center) check What are the working hours allowed for remediation work? 7AM to 4PM (M-F) Is there a required timeline for completion after award? The SOW provides the period of performance Are there any containment requirements for adjacent spaces? No, however from the Contracting Officer's Representative who is a non-SME, in reading the requirements from the testing company, two other adjacent areas at least need to be air-scrubbed. This is listed in the SOW. What is the current HVAC system configuration in the affected area? The FRF has its own 15 ton conventional AC unit. It is dedicated solely to the FRF room. Are there any sensitive equipment or materials that need special protection during remediation? Yes, there is some RF radio equipment racks and one IT equipment rack. Is there a designated staging area for equipment and materials? Yes. The awardee will provide all necessary labor and materials to perform the work required to eradicate all mold in the FRF room. 1) Please see the attached Statement of Work for requirements. 2) The evaluation criteria is shown in the Request for Proposal attached to this solicitation. The offeror must address the specifics of the evaluation factors to be considered for award. 3) Please email the Contracting Officer listed in the Request for Proposal with any questions you may have. Site Visits will be offered on January 8th, 2025 from 9:30am-2:00pm CST. Please contact David Perez at david.perez3@fema.dhs.gov to schedule. Proposals are due January 14th, 2025 by 5:00 PM/ET.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS