Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of The Interior was posted on July 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--Update Utilities

Closed
140P2026R0063Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont, North Carolina, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Additional deliverables include the installation of new gravity sewers and manholes, a generator, odor control equipment, stormwater facilities, and site fencing. The project has an estimated value of $16,690,000 and is set aside for small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts forms. The agreement is governed by EJCDC standard forms, requiring performance and payment bonds and proof of insurance. Performance begins upon a Notice to Proceed, and payment is processed monthly via applications for payment submitted to the Engineer, with payments due 30 days after presentation to the owner. Final acceptance is contingent upon a joint inspection by the Owner, Contractor, and Engineer, the completion of a punch list, and the Engineer's written recommendation for final payment.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is set aside for small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of the bid for reimbursement. Quotes are due by November 17, 2026, at 2:00 PM PT, with the general bid date following on November 18, 2026. Contracting will be based on Garney Standard Purchase Order and Subcontract documents, and any exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 20 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities (Project No. EN19001.03) and Butterfield Lift Station Improvements (Project No. EN26054) located in Chino and Chino Hills, California. The scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 pipelines for the Butterfield Dual Force Main. Additionally, the project requires modifications to the RP-2 Lift Station to accommodate Prado Basin flows, which includes replacing existing pumps with smaller units and constructing an elevated electrical platform to protect equipment from 100-year flood levels. Key electrical deliverables include new SCE electrical services and the installation of a standby generator. Filanc is seeking quotes across a wide range of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and E&IC. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. Bids and proposals are due by October 29, 2025, at 2:00 PM. Primary contact for this opportunity is Julia Masaitis.
Filanc

POSTED

about 2 hours ago

DEADLINE

in about 3 hours

AI Contract Overview

Show more

This contract, issued under solicitation number 140P2026R0063 by the Department of the Interior’s DSC Contracting Services Division, pertains to the rehabilitation of underground utilities at Bandelier National Monument in Los Alamos, New Mexico. The work includes comprehensive reconstruction and replacement of aging utility systems—sixty years or older—that suffer from code deficiencies and deferred maintenance across key areas: Mesa Top (including Entrance Station, Juniper Campground, Mesa Housing, and Field Operations Center), Entrance Road and Fire Tower Lane, Frijoles Canyon, and the Los Alamos National Laboratory right-of-way across Highway 4. The project requires site preparation such as clearing, grubbing, and stripping of topsoil while preserving existing vegetation through designated Tree Protection Zones. All utility systems—water mains, electrical distribution, cellular network, and roadway infrastructure—must be replaced under a Firm-Fixed-Price arrangement, with construction activities constrained by the imperative to keep Entrance Road fully open to vehicular traffic throughout the project. The contractor must adhere to strict environmental and safety protocols, including compliance with OSHA standards for underground construction and excavations, implementation of a storm water pollution prevention plan, and development of an emergency response plan for trapped personnel in shafts or pipes. Only domestic or designated country materials are permitted, explicitly excluding those from Bahrain, Mexico, or Oman. The contract mandates precise compliance with packaging and delivery requirements, including use of original manufacturer containers, biodegradable or recyclable packaging with minimal material, and proper labeling—particularly for insulation, which must be marked "asbestos-free." All materials and equipment must be protected from damage, moisture, and abrasion during shipment and on-site handling. Technical proposals must be submitted in two volumes via email, with Volume I addressing project experience, technical approach, management structure, past performance, and small business participation, and Volume II containing the sealed business and price proposal, including SF 1442 and price schedules. Proposals must be under 100 MB per email and 38 MB per attachment, with specific subject line formatting. Evaluation will use the Best Value Continuum Tradeoff Process under FAR Part 15.1, with non-price factors—project experience, technical approach, management approach, past performance, and small business participation—considered approximately equivalent in weight to proposed pricing. Large businesses must submit an acceptable Small Business Subcontracting Plan to be eligible for award. The contract incorporates critical FAR clauses on definitions, prohibitions on grat

General Info

Utility update project at Bandelier National Monument; solicitation by Department of the Interior.

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

CO

Set-Aside

NONE

Documents

42

Addendum No. 1 Specifications for BAND 266697 Underground Utilities Rehabilitation

PDF, High priority: read this firstspecifications
High

Amendment 0001 to Solicitation 140P2026R0063 for Bandelier National Monument Utilities Rehab

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation 140P2026R0063 for Bandelier National Monument Utilities Rehabilitation

PDF, High priority: read this firstamendment
High

Amendment 0003 to Solicitation 140P2026R0063

PDF, High priority: read this firstamendment
High

Amendment 0004 to Solicitation 140P2026R0063 for Bandelier National Monument Utilities Rehabilitation

PDF, High priority: read this firstamendment
High

Amendment 0005 to Solicitation 140P2026R0063

PDF, High priority: read this firstamendment
High

Amendment 0006 to Solicitation 140P2026R0063

PDF, High priority: read this firstamendment
High

Amendment 0007 to Solicitation 140P2026R0063

PDF, High priority: read this firstamendment
High

B08 Attachment 1 All Specifications Addendum No. 1

PDF, High priority: read this firstspecifications
High

B08 Attachment 2 Band 266697 Drawings Addendum 01 07APR2026

PDF, High priority: read this firstdrawings
High

B08 Attachment 2 BAND-266697 Final Geotechnical Report Sept 2024

PDF, High priority: read this firstgeotechnical-report
High

B08 Attachment 5 Bandelier Project Addendum Memo 02APR2026

PDF, High priority: read this firstamendment
High

BAND-266697 Contract Price Schedule Addendum 1

XLSX, High priority: read this firstcontract-price-schedule
High

BAND-266697 Contract Price Schedule for Underground Utilities Rehabilitation

XLSX, High priority: read this firstcontract-price-schedule
High

BAND-266697 Submittal List Review Estimate Template

XLSX, High priority: read this firstsubmittal-list
High

BAND 266697 Underground Utilities Rehabilitation Project Specifications

PDF, High priority: read this firstspecifications
High

BAND 266697 Underground Utilities Rehabilitation Project Specifications April 2025

PDF, High priority: read this firstspecifications
High

NPS Bandelier National Monument Replace Underground Utilities Pre-Bid Meeting Presentation

PDF, High priority: read this firstpresentation
High

NPS Bandelier National Monument Underground Utilities Pre-Bid Meeting Presentation May 12 2026

PDF, High priority: read this firstpre-bid-presentation
High

RFP 140P2026R0063 - Rehabilitate Underground Utilities Q&A Tracker

PDF, High priority: read this firstq-and-a
High

RFP 140P2026R0063 - Rehabilitate Underground Utilities Q&A Tracker

PDF, High priority: read this firstq-and-a
High

Small Business Subcontracting Plan for Contract 140P202

PDF, High priority: read this firstsubcontracting-plan
High

Solicitation 140P2019XXXX Project Experience Questionnaire

PDF, High priority: read this firstproject-experience-questionnaire
High

Solicitation 140P2026R0063 - Bandelier National Monument Underground Utilities Rehabilitation

PDF, High priority: read this firstifb
High

Solicitation 140P2026R0063 Rehabilitate Underground Utilities

PDF, High priority: read this firstrfp
High

Solicitation 140P2026R0063 - Rehabilitate Underground Utilities

PDF, High priority: read this firstrfp
High

Solicitation 140P2026R0063 - Rehabilitate Underground Utilities

PDF, High priority: read this firstrfp
High

Solicitation 140P2026R0063 - Rehabilitate Underground Utilities at Bandelier National Monument

PDF, High priority: read this firstifb
High

Solicitation 140P20XXRXXXX Past Performance Questionnaire

PDF, High priority: read this firstpast-performance
High

Solicitation 140P20XXRXXXX Past Performance Questionnaire

PDF, High priority: read this firstpast-performance
High

Wage Determination Heavy Construction New Mexico Santa Fe Counties 2026

PDF, High priority: read this firstwage-determination
High

Wage Determination NM20260048 for Santa Fe County Building Construction

PDF, High priority: read this firstwage-determination
High

B08 Attachment 11 General References Form

PDF, Low prioritygeneral-references
Low

B09 BAND 266697 Pre-Proposal Sign-In Roster 2026-05-12

PDF, Low priorityother
Low

B09 QR Tracker BAND 266697

PDF, Low priorityother
Low

Construction Contract Administration Guidance

PDF, Low priorityother
Low

B08_Attachment_10_Solit_PSP_Vol_II_BidBond.pdf

PDF

B08_Attachment_2_BAND_266697_Construction_Drawings_Full_Size_Combined_Part1_0001.pdf

PDF

B08_Attachment_2_BAND_266697_Construction_Drawings_Full_Size_Combined_Part2_0001.pdf

PDF

B08_Attachment_2_BAND_266697_Construction_Drawings_Full_Size_Combined_Part3_0001.pdf

PDF

B08_Attachment_2_BAND_266697_Construction_Drawings_Full_Size_Combined_Part4_0001.pdf

PDF

B08_Attachment_4_BAND_MOD7_Exceptions_Report_Signed.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

7 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice title changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from May 27, 2026 to Jun 29, 2026.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Jun 29, 2026 to Jul 16, 2026.

Notice updated

Response deadline changed from Jul 16, 2026 to Jul 23, 2026. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
Contacts1 person available
OfficeDenver, CO, 80225, USA
Office AddressDenver, CO, 80225, USA

Full Description

Show more
This project is located and Bandelier National Monument, New Mexico

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. A critical requirement is that the existing plant must remain in permitted operation until the new facility is accepted by the government, and the contractor must provide a 12-month operational support period. The contract is a firm-fixed-price acquisition with a magnitude exceeding 100 million dollars. The mandatory period of performance is 1095 calendar days, scheduled from February 1, 2027, to February 1, 2030. Award will be based on a multi-factor, best-value tradeoff process evaluating technical experience, technical approach, key personnel experience, and price. Required deliverables include a detailed commissioning plan covering startup sequencing, operator training, and regulatory coordination. The contractor must furnish performance and payment bonds and comply with union prevailing wage rates, Department of the Interior cybersecurity requirements, and ADA/ABA accessibility standards.
Sewage Treatment Facilities

POSTED

about 9 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is a Small Business Set-Aside, Firm-Fixed-Price contract issued by the National Park Service for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. The project, with an estimated construction magnitude between $1 million and $5 million, involves three primary components: the selective demolition and installation of a new weatherable rigid vinyl sheet pile wall with tie rods and a deadman wall, the eastward extension of the wall using structural FRP composite sheet piles, and comprehensive site restoration including excavation, backfilling, sodding, limestone riprap installation, and spartina sea grass restoration. The mandatory performance period is 259 calendar days, with work required to begin within 10 days of award. The government will utilize the Best Value Continuum Tradeoff Process for award, where non-price factors—specifically technical approach, schedule, and management approach—are significantly more important than price. Contractors must adhere to strict environmental protection protocols to protect marine mammals and endangered species, and comply with the Davis-Bacon Act and various ASTM standards for recycling and packaging. Key requirements include the submission of a Contractor Quality Control plan, the assignment of specific key personnel, and the provision of performance and payment bonds. Invoicing must be processed electronically through the U.S. Department of the Treasury's Invoice Processing Platform following a draft review by the Contracting Officer's Representative.
Other Heavy and Civil Engineering Construction

POSTED

6 days ago

DEADLINE

in 16 days
View Details
NAICS: 237310
Federal
Z--BRCA 310427 Southbound Shuttle Stop
Solicitation # 140P2026R0065
Solicitation 140P2026R0065 is a small business set-aside for the construction of the Southbound Shuttle Stop at Bryce Canyon National Park, Utah. Managed by the National Park Service Denver Service Center, this firm-fixed-price contract has an estimated value between $1,000,000 and $5,000,000. The scope of work includes shuttle stop improvements, the addition of lanes, culvert installation, trail realignment, retaining wall construction, ADA ramp and sidewalk installation, and the placement of shelters and MUTCD-compliant signage. Due to the project's location, the contractor must implement protective measures for the adjacent UT Prairie Dog Habitat and ensure all equipment is clean and free of contaminants. The performance period is scheduled from May 1, 2027, to September 28, 2027, with a total duration of 150 calendar days following the notice to proceed. Award will be determined using the Best Value Continuum Tradeoff Process, evaluating technical approach, schedule, project experience, key personnel, and past performance alongside proposed pricing. Requirements include the submission of bid, performance, and payment bonds, compliance with Davis-Bacon Act wage determinations, and adherence to OSHA safety standards. Proposals must be submitted electronically in separate technical and price volumes, with a final response deadline of November 3, 2026.
Highway, Street, and Bridge Construction

POSTED

12 days ago

DEADLINE

in 6 days
View Details
NAICS: 237110
Federal
Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment
Solicitation # 140P2026R0091
Solicitation 140P2026R0091 is a firm-fixed-price construction contract issued by the National Park Service Denver Service Center to rehabilitate the Rainshed and Water Treatment System at Hawaii Volcanoes National Park. The project scope includes the rehabilitation of the rainwater catchment and water treatment systems, the replacement of Building 43 with a new metal building, and the replacement of Building 241 with a new open-air and CMU structure. Additional optional requirements include replacing the perimeter fence, repairing the water treatment system, and replacing ground catchment pavement. The project has a mandatory performance period of 610 calendar days, with primary CLINs scheduled from November 1, 2026, to July 3, 2028. The government will award the contract using a best value tradeoff process, evaluating non-price factors such as project experience, technical approach, management approach, and construction schedule against proposed pricing. Bidders must comply with the Davis-Bacon Act for prevailing wages and adhere to Buy American Act and Build America Buy America standards. Technical requirements include ADA compliance, the implementation of a Quality Control Plan, and adherence to specific environmental standards regarding ozone-depleting substances and recycled content. Due to the site's nature, the project involves Section 106 mitigation for historic buildings and requires careful construction phasing to ensure water production is not compromised. Proposals must be submitted electronically, and the awardee will be required to provide performance and payment bonds within 10 days of award.
Water and Sewer Line and Related Structures Construction

POSTED

15 days ago

DEADLINE

in 9 days
View Details
NAICS: 237310
Federal
Z--YELL 338223 - Bridge Preservation
Solicitation # 140P2026R0073
Solicitation 140P2026R0073 is a Small Business Set-Aside for bridge preservation services at Yellowstone National Park, Wyoming, managed by the National Park Service Denver Service Center. The project involves the rehabilitation of three specific bridges: Lava Creek, Thumb Creek, and an Unnamed Creek bridge. The scope of work includes concrete spall and structural repairs, crack sealing, stone masonry repointing, bridge expansion joint maintenance, painting of railings, and the application of epoxy overlays via hydro-demolition. Additional requirements include erosion repair, pavement markings, and strict traffic control. The anticipated period of performance is 155 calendar days from the Notice to Proceed, with an estimated contract value between $1 million and $5 million. The contract will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, project experience, key personnel, and past performance—are significantly more important than price. Required key personnel include a Site Superintendent with at least five years of experience and OSHA 30 certification, and a Traffic Control Supervisor with three years of experience meeting MUTCD standards. Contractors must adhere to strict work hour restrictions from 7 AM to 7 PM and comply with environmental protections for wildlife and cultural resources. Performance and payment bonds are required at 100 percent of the contract price, and the project is subject to Davis-Bacon Act labor standards. Proposals are due by October 30, 2026.
Highway, Street, and Bridge Construction

POSTED

15 days ago

DEADLINE

in 2 days
View Details
NAICS: 237110
Federal
Y--GRTE 237343 - Rehab 4 Lazy F Ranch
Solicitation # 140P2026R0098
Solicitation 140P2026R0098 is a Total Small Business Set-Aside for the rehabilitation of the historic 4 Lazy F Ranch in Grand Teton National Park, Wyoming, to provide employee housing. The project scope includes the comprehensive rehabilitation of one lodge, eight cabins, one garage, two outbuildings, and a water well structure. Key technical requirements involve structural repairs, historic preservation, and the installation of new potable water and wastewater systems, including a sanitary sewer collection system and lift station. The project is estimated to exceed 10 million dollars and has a mandatory negotiable performance period of 170 calendar days, with work beginning within 10 days of award. The procurement will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—technical approach, project experience, schedule, and past performance—are collectively equal in importance to price. Contractors must adhere to strict environmental and safety standards, including the management of lead-based paint and asbestos, compliance with the Davis-Bacon Act, and mitigation of impacts on bald eagle nesting and roosting bats. Proposals must be submitted electronically by November 20, 2026, and must include a detailed technical approach and a phasing plan to minimize park operational disruptions. Required insurance includes general liability of 500,000 dollars and employer liability of 100,000 dollars.
Water and Sewer Line and Related Structures Construction

POSTED

23 days ago

DEADLINE

in 23 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS