Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Transportation was posted on January 6, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Upgraded HVAC and Fire Life Safety Project at the Air Traffic Control Tower (ATCT) in Portland, ME

Closed
697DCK-24-R-00596Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
26-140 Installation of Emergency Shut Off Switches
Solicitation # 26-140
Solicitation 26-140 is a subcontracting opportunity for the Atterbury Job Corps Center in Edinburgh, Indiana, operated by Adams and Associates, Inc. for the U.S. Department of Labor. The project requires the installation of two mushroom-head push-button emergency shut-off switches and a new 60A, 208/120V, 3-phase, 4-wire, 6-circuit branch circuit panel with a 60A shunt-trip main circuit breaker in the Facility Engineering Storage/Maintenance Shop. All work must comply with OSHA, EPA, and FNC guidelines, as well as applicable state and local building codes. The contractor must provide a one-year guarantee on workmanship and adhere to Davis-Bacon Act wage rate decisions. This is a small business set-aside solicitation requiring a single lump sum bid with a detailed cost breakdown for labor, materials, and equipment. Award will be based on best value, evaluated across price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). A mandatory site visit was scheduled for November 10, 2026, with a proposal deadline of November 20, 2026. Qualified offerors must possess a valid Indiana Contractor's License and provide proof of general liability, automobile, and workers compensation insurance. Payment terms are Net 30, contingent upon the submission of certified payroll records, a completed SF 1413, and the release of liens.
Atterbury Job Corps. – Adams & Associates

POSTED

about 7 hours ago

DEADLINE

in 20 days
NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency is soliciting proposals under RFP-VC-26-010 for professional transformer oil testing services to enhance the reliability, safety, and maintainability of its transformers. The scope of work includes performing visual and infrared thermographic inspections on energized transformers under typical load, installing standardized external oil sampling devices to improve technician safety, and conducting comprehensive oil testing analysis. Key deliverables include annotated infrared images, written condition assessment reports for each asset, the development of standard operating procedures, and on-site training for up to 20 agency staff members. All work must adhere to NETA MTS, IEEE, and NFPA 70E safety protocols, with oil sampling following ASTM D923 standards and infrared inspections performed by ASNT Level 1 certified technicians or equivalent. The agency intends to make a single award to the most capable offeror based on a cost-effective and time-efficient approach. Evaluation criteria focus on past performance, requiring at least two similar projects completed within the last five years, as well as personnel experience, staffing methodology, and the proposed fee structure. Proposals must be submitted electronically via PlanetBids by December 23, 2026, at 3:00 pm. The resulting contract will utilize fixed pricing with a not-to-exceed total value. Administrative requirements include electronic invoicing via ACH, strict adherence to public works contractor registration where applicable, and the provision of a SOC 2 report or completed CAIQ to meet cybersecurity goals.
Inland Empire Utilities Agency

POSTED

about 7 hours ago

DEADLINE

in about 2 months
NAICS: 238210
New
Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility
Solicitation # purified-water-replenishment-san-jacinto-valley-advanced-water-purification-facility-2
Axia Electric LLC is soliciting bids from SBE/DBE certified firms for the Eastern Municipal Water District's Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility Project in California. The scope of work is divided between the San Jacinto Valley Advanced Water Purification Facility and the Brine Ponds, specifically requesting subcontractors for low voltage systems, fiber optics, and electrical materials and supplies. Bids must be submitted by 2:00 PM on November 18th to be considered responsive, with a final deadline of November 19th. Qualified bidders must be registered to perform public work pursuant to Labor Code Sections 1725.5 and 1771.1 (a) and must agree to the AGC Master Labor Agreements and Axia's Standard Long Form Subcontract or Purchase Order. Minimum insurance requirements include 5 million dollars in excess liability, 1 million dollars for auto liability, 1 million dollars for workers compensation and employer liability, and general liability coverage of 1 million dollars per occurrence, 2 million dollars aggregate, and 2 million dollars for completed operations. Evaluation will prioritize SBE/DBE certification, though non-certified firms may be considered if they provide lower-tier SBE/DBE participation details.
Axia Electric

POSTED

about 7 hours ago

DEADLINE

in 19 days
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management & Training Corporation is soliciting bids for a fixed-price, single lump sum subcontract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project involves inspecting, testing, repairing, and certifying emergency lighting systems to ensure compliance with NFPA 101 (2024 Edition) and NFPA 70 standards. Key responsibilities include inventorying all fixtures, performing functional power-cut testing, applying durable tracking labels to fixtures, and integrating recurring maintenance into the facility's Computerized Maintenance Management System. The estimated contract value ranges between $25,000 and $100,000, with specific work areas including the cafeteria, education building, recreation center, and men's and women's dormitories. Bids are due by December 1, 2026, and will be awarded based on overall best value. Mandatory requirements for submission include a physical site visit, a detailed cost breakout on company letterhead, and a completed supplier packet including a W-9 and self-certification. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. The contract is subject to various federal regulations, including the Davis-Bacon Act for prevailing wages, FAR 52.222-4 for safety and overtime, and FFATA reporting for contracts valued at $40,000 or more. Final acceptance is contingent upon a joint substantial completion inspection and the resolution of any punch list items.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 7 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract is focused on the Upgraded HVAC and Fire Life Safety Project at the Air Traffic Control Tower (ATCT) in Portland, Maine. The primary objective is the replacement and upgrade of HVAC equipment and mechanical controls. Key tasks include replacing the existing chiller and dry cooler with two new chillers and the existing boiler with two redundant boilers. Additionally, the contract entails the installation of new VFD pumps for hot water and chilled water systems, along with new piping configurations. Four new CRUs are to be installed to replace the old ones, and the existing RTU controlling base building air will be fully replaced, including all ductwork. The introduction of new VAVs into the base building system is also required. Additional upgrades cover the replacement of stair pressurization systems and updating smoke detectors, alongside a complete overhaul of the building's roof with a PVC membrane system. Crucial to the project is also the installation of new equipment such as fan coil units and bathroom exhaust fans, amid necessary incidental works like hydronic and domestic water piping, pipe and wall insulation, electrical wiring, concrete pads, as well as testing and commissioning of the new systems. Throughout its amendments, the contract adjustments primarily involved extensions and updates concerning proposal due dates, the inclusion of revised Q&A documents and additional attachments. Notably, Amendment 06 extended proposal submissions to January 07, 2025, maintaining that late submissions will be marked non-responsive. It is pivotal that potential contractors adhere to deadlines, currently set for proposal submission by January 07, 2025. Furthermore, Amendments have ensured responses to clarified queries, emphasizing the unchanged terms and conditions. The amendment history encapsulates the transition from small business set-aside criteria to full and open competition, reflecting an adjusted approach in response to the evolving project scope and requirements. With a base in FORT WORTH, Texas, the contract aligns itself with NAICS Code 238210, indicative of electrical contractors and other wiring installation contractors. Proposers are urged to maintain compliance with all stated terms to ensure a responsive bid submission.

General Info

HVAC and safety upgrades for ATCT in Portland, due January 7, 2025.

NAICS

238210 - Electrical Contractors and Other Wiring Installation Contractors

Place of Performance

Portland, ME, 04102, USA

Set-Aside

SBA

Documents

32

1302899 PWM HVAC Upgrade Project - FAA Drawing Clarifications and Notes

PDF, High priority: read this first1 page · amendment
High

697DCK-24-R-00596 Amendment 0001

PDF, High priority: read this first2 pages · amendment
High

697DCK-24-R-00596 Amendment 02

PDF, High priority: read this first2 pages · amendment
High

697DCK-24-R-00596 Amendment 03

PDF, High priority: read this first2 pages · amendment
High

697DCK-24-R-00596 Amendment 04

PDF, High priority: read this first2 pages · amendment
High

697DCK-24-R-00596 Amendment 05

PDF, High priority: read this first2 pages · amendment
High

697DCK-24-R-00596 Amendment 06

PDF, High priority: read this first1 page · amendment
High

697DCK-24-R-00596 Amendment 07

PDF, High priority: read this first1 page · amendment
High

697DCK-24-R-00596 Solicitation and Award - Upgraded HVAC and Fire Life Safety

PDF, High priority: read this first72 pages · rfp
High

ATCT Fire Life Safety Upgrade Scope of Work

PDF, High priority: read this firstsow
High

FAA Proposal Breakdown Form - Blank Bid Form

PDF, High priority: read this first1 page · rfq
High

FAA Proposal Breakdown Form - HVAC/ATCT Alternate 1 Bid

PDF, High priority: read this first1 page · bid-form
High

FAA-PWM-1302899 HVAC Rehabilitation Specifications

PDF, High priority: read this first1015 pages · specifications
High

HVAC Rehabilitation – Portland International Jetport ATO, June 28 2024

PDF, High priority: read this first86 pages · specifications
High

J-5 Mobile Office Specifications

PDF, High priority: read this first1 page · specifications
High

J-7 Restroom Trailer Specification Sheet

PDF, High priority: read this first17 pages · specifications
High

J-8 Updated Q&A for PWM HVAC and Fire Alarm

PDF, High priority: read this first18 pages · q-and-a
High

ME20240050 Wage Determination - Cumberland County, Maine

PDF, High priority: read this first5 pages · wage-determination
High

PWM-D-ATCT-C110-BL Utility Site Plan

PDF, High priority: read this first1 page · sow
High

Performance Questionnaire - PWM HVAC

PDF, Low priority1 page · past-performance
Low

PWM HVAC and Fire Life Safety Upgrade Project at ATCT - Site Visit 2024-10-29

PDF, Low priorityspecial-notice
Low

PWM plot layout with staging area and offices

PDF, Low priority1 page · other
Low

J-10_20241213_102014.jpg

JPG

J-11_20241213_102043.jpg

JPG

J-12_20241213_102514.jpg

JPG

J-13_20241213_102801.jpg

JPG

J-14_20241213_102844.jpg

JPG

J-15_20241213_103246.jpg

JPG

J-16_20241213_103308.jpg

JPG

J-17_20241213_103520.jpg

JPG

J-18_20241213_104733.jpg

JPG

J-9_20241213_101951.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

10 updates
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Nov 22, 2024 to Nov 29, 2024. The notice title changed. The notice description changed.

Notice updated

Response deadline changed from Nov 29, 2024 to Nov 22, 2024. The notice title changed. The notice description changed.

Notice updated

The notice title changed.

Notice updated

Response deadline changed from Nov 22, 2024 to Nov 29, 2024. The notice description changed.

Notice updated

Response deadline changed from Nov 29, 2024 to Dec 16, 2024. The notice description changed.

Notice updated

Response deadline changed from Dec 16, 2024 to Jan 3, 2025. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Jan 3, 2025 to Jan 7, 2025. The notice description changed.

Notice updated

Response deadline changed from Jan 7, 2025 to Jan 10, 2025. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 697DCK Regional Acquisitions Svcs
Contacts2 people available
OfficeFORT WORTH, TX, 76177, USA
Office AddressFORT WORTH, TX, 76177, USA
Contacts
Ms. Joni Haynes
Erin Crabtree

Full Description

Show more
Purpose of Amendment 07 is to extend the due date for proposals FIRST: The due date for proposals is hereby updated to the following: Proposals are due no later than January 10, 2025, at 1200 ET. Any proposal received after this time will be deemed non-responsive and will not be considered for award. ******************************* SECOND: All terms and conditions remain unchanged and in full effect. **************************************************************************************** Purpose of Amendment 06 is to extend the due date for proposals FIRST: The due date for proposals is hereby updated to the following: Proposals are due no later than January 07, 2025, at 1200 ET. Any proposal received after this time will be deemed non-responsive and will not be considered for award. ******************************* SECOND: All terms and conditions remain unchanged and in full effect. **************************************************************************************** Purpose of Amendment 05 is to incorporate updated Q&A and include additional attachments as follows: FIRST: The Q&A released on December 02, 2024 is hereby superseded by the Q&A with revision date of December 16, 2024. This Q&A will replace the previous version and will be remain attachment J-8. Updated FAA responses within the document are highlighted. ******************************* SECOND: Due to the updated Q&A, additional attachments are required and are being released and outlined as the following: 1. J-9_20241213_101951 2. J-10_20241213_102014 3. J-11_20241213_102043 4. J-12_20241213_102514 5. J-13_20241213_102801 6. J-14_20241213_102844 7. J-15_20241213_103246 8. J-16_20241213-103308 9. J-17_20241213_103520 10. J-18_20241213_104733 11. J-19_PWM Plot layout with staging area and office shown 12. J-20_Utility Site Plan pwm-d-atct-c110-bl ***************************** THIRD: The due date for proposals still remains January 03, 2025, at 1200 ET. Any proposal received after this time will be deemed non-responsive and will not be considered for award. ***************************** FOURTH: All other terms remain unchanged and in full effect. **************************************************************************************** Purpose of Amendment 04 is to extend the due date for proposals and release the Q&A and supporting attachments as follows: FIRST: The due date for proposals is hereby updated to the following: Proposals are due no later than January 03, 2025, at 1200 ET. Any proposal received after this time will be deemed non-responsive and will not be considered for award. ******************************* SECOND: The following attachments are hereby included in this amendment: 1. J-5_Mobile Office_PS1 2. J-6_PWM HVAC ADENDUM NOTES LIST 3. J-7_Restroom Trailer Spec Sheet 4. J-8_QA for PWM HVAC and Fire Alarm_ December 02, 2024 ******************************* THIRD: All terms and conditions remain unchanged and in full effect. **************************************************************************************** Purpose of Amendment 03 is extending the due date for proposals as follows: FIRST: The due date for proposals is hereby updated to the following: Proposals are due no later than December 16, 2024, at 1200 ET. Any proposal received after this time will be deemed non-responsive and will not be considered for award. ******************************* SECOND: All terms and conditions remain unchanged and in full effect. **************************************************************************************** Purpose of Amendment 02 is changing the dates for the following timeline: FIRST: The date for the site visit hereby updated to the following: A site visit is scheduled for October 29, 2024 at 0900ET. If you wish to attend, submit your name, company and contact information for all attendees to contact@example.gov and contact@example.gov no later than October 25, 2024. ******************************* SECOND: The due date for questions is hereby updated to the following: Submit questions in writing to contact@example.gov and contact@example.gov no later than November 06, 2024, by 1200 ET. ******************************* THIRD: The due date for proposals is hereby updated to the following: Proposals are due no later than November 29, 2024, at 1200 ET. Any proposal received after this time will be deemed non-responsive and will not be considered for award. ******************************* FOURTH: All terms and conditions remain unchanged and in full effect. **************************************************************************************** Purpose of Amendment 0001 is to change the size standard for this solicitation as follows: FIRST: The size standard for this solicitation is hereby changed to the following: FROM: Small Business set-aside. TO: Full and Open SECOND: All other terms and conditions remain unchanged and in full effect. **************************************************************************************** The PWM ATCT HVAC project is primarily an equipment replacement/upgrade project with Mechanical Controls. The existing chiller and dry cooler will be replaced with two new chillers. The existing boiler will be replaced with two redundant boilers. The hot water and chilled pumps will be replaced with new VFD pumps along with a new piping configuration to be installed. A total of four new CRUs will be installed to replace the existing CRUs. The existing RTU that controls the base building air will be fully replaced along with all its duct work. New VAVs to be installed in the base building system as well. The existing stair pressurization will be replaced along with the removal/addition of several smoke detectors throughout the building. The existing ballasted base building roof will be fully replaced with a PVC membrane roof system. All existing three way hydronic valves will be replaced with two way Belimo energy valves. The existing TRANE BAS will be replaced in full with Schneider Electric EcoStruxure BAS. New equipment will also be installed including fan coil unit and bathroom exhaust fans. Incidental work includes hydronic piping, domestic water piping, pipe insulation, wall insulation, framing, and gypsum board, painting, joint sealants, electrical wiring and devices, concrete pads, and equipment supports. A significant portion of the work also includes temporary heating and cooling, testing & balancing and commissioning. The list is not all inclusive and other items of work are required.

More opportunities from Department Of Transportation → 697DCK Regional Acquisitions Svcs

Same awarding agency

NAICS: 236220
New
Federal
MARKET SURVEY NOTICE for new ATCT Project at (FLL) Fort Lauderdale- Hollywood International Airport
Solicitation # 697DCK-27-R-FLL01
The Federal Aviation Administration is conducting a market survey for the Progressive Design Build of a new Air Traffic Control Tower (ATCT) at the Fort Lauderdale-Hollywood International Airport in Florida. This project, identified under solicitation 697DCK-27-R-FLL01 and NAICS code 236220, has a total target budget of 85 million dollars. The procurement is structured in two primary phases: Phase 1 focuses on programmatic validation, preconstruction services, and preliminary design up to 70 percent completion, while Phase 2 covers final design, full construction, commissioning, and warranties. The contract utilizes a Firm Fixed Price model for Phase 2 construction, with a total budget encompassing both the new tower facility and final parking and site configuration. The FAA will employ a Tradeoff Source Selection Method, prioritizing non-cost factors over price. Evaluation is based on three volumes: a pass/fail business proposal, a statement of qualifications focusing on project past performance and experience, and a Phase 1 price proposal requested only from the apparent awardee. Qualified sources must demonstrate a record of completing mission-critical facilities of similar scope within the last ten years. The selection process includes confidential interviews with the three highest-rated submittals. Additionally, firms categorized as other than small businesses must provide a subcontracting plan meeting specific goals, including 40 percent for small businesses and 5 percent each for socially disadvantaged, women-owned, and service-disabled veteran-owned small businesses.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 6 days
View Details
NAICS: 541330
New
Federal
Design Renovation, System Support Center (SSC), 3551 Combine St., Paso Robles, CA
Solicitation # 697DCK-27-R-00022A
The Federal Aviation Administration is seeking engineering design services for the renovation of a 4,992 square foot leased building to serve as a System Support Center located at 3551 Combine St., Paso Robles, California. This procurement, identified by solicitation number 697DCK-27-R-00022A, is a Total Small Business Set-Aside. The selected contractor will be responsible for developing permit-ready Mechanical, Electrical, Plumbing, Life Safety, and Fire Protection drawings based on provided Design Intent Drawings. Key deliverables include three full-size stamped construction permit drawings approved by the City of Paso Robles, a dedicated life safety sheet, and all necessary electrical load and hydraulic calculations. All work must comply with 2022 California Building Codes and local standards. The period of performance is 130 days from the issuance of the Notice to Proceed, with a potential option to extend services for up to six months. Award will be based on the best value, considering successful price negotiations and conformance with solicitation terms. Offerors must submit their proposals in PDF or Word format to Linda Hennequant by November 12, 2026, ensuring the solicitation number is included in the subject line. Submissions must include a past performance record of at least three relevant projects completed within the last five years. Invoicing for this contract will be managed electronically through the Delphi eInvoicing web portal.
Engineering Services

POSTED

2 days ago

DEADLINE

in 13 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS