Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on March 23, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Upper Brownsville Levee Improvements at UPRR Crossing

Awarded
191BWC18B0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at 28 Bare Cove Park Drive. This fixed-price lump sum project has an estimated construction cost of $1,300,000. The scope of work includes site preparation such as the removal of trees, shrubs, and stumps, re-grading the site, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the contractor is responsible for a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for maintaining construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or paved athletic facilities. Bidders must submit their proposals electronically via the OpenGov portal by November 3, 2026, including a 5% bid security and a Statement of Qualifications with at least three similar public project references. Awarded contractors must provide a payment bond equal to 50% of the total project cost and adhere to Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code. The project includes a minimum one-year warranty for labor and a two-year warranty for materials. Final payment is contingent upon the submission of AIA affidavits for the payment of debts and release of liens.
Recreation

POSTED

about 6 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 7 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

The Upper Brownsville Levee Improvements at UPRR Crossing project, managed by the United States Section of the International Boundary and Water Commission, involves the rehabilitation of approximately 650 feet of an existing levee in Cameron County, Texas. The primary objective is to bring the levee system into compliance with FEMA Levee Accreditation Requirements and National Flood Insurance Program regulations, specifically addressing elevation issues where the Union Pacific Railroad line intersects the levees. The awarded contractor is responsible for obtaining a Right of Entry Agreement from the Union Pacific Railroad Company and coordinating closely with the UPRR/B&M Bridge Company. The scope of work includes right-of-way preparation, excavation and embankment to raise the levee, improvements to the levee top, and the construction of a 6-inch aggregate surface course. Additionally, the contractor must handle topsoil placement and the establishment of vegetation for erosion control. The total performance period is 210 calendar days, with a requirement that all flood control levee work be finished within the first 120 days, followed by 90 days for the maintenance of seeding.

General Info

Agency

N/A

Contract Value

$857,300

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

The site is near the B&M International Bridge but within the City of Brownsville, Texas., BROWNSVILLE, TX, 78570, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Combined Synopsis

Notice updated

The notice description changed.

Deadline changed

Response deadline changed from Jan 30, 2018 to Jan 31, 2018.

Notice updated

Notice type changed from Combined Synopsis/Solicitation to Presolicitation. The response deadline was removed. The notice title changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Philip K. JohnsonContracting Officer

Full Description

Show more
Purpose of the Project The United States Section of the International Boundary and Water Commission (USIBWC) recently completed rehabilitating approximately 65 miles of our levees within the limits of Donna Pump to Brownsville, which is part of the Lower Rio Grande Flood Control Project (LRGFCP) levee system, located in Hidalgo and Cameron Counties, Texas. The existing levee system was designed to protect the existing farmlands and commercial and residential buildings against the 100-year flood event; however, due to the UPRR rail line intersecting both levees at a lower elevation than the existing top of levee elevations of the adjacent levees, the existing levee system needs to be rehabilitated in order to meet the Federal Emergency Management Agency's (FEMA) Levee Accreditation Requirements of the National Flood Insurance Program (NFIP) regulations (44 CFR 65.10). The USIBWC Contractor that is awarded this project shall obtain Right of Entry Agreement from Union Pacific Railroad Co. General Description of the Work The work for this project generally consists of rehabilitation of approximately 650 feet of an existing levee located in a small segment of the Lower Rio Grande levee situated in Cameron County, Texas. Major Construction Tasks, include: (1) Preparation of Right of Way. (2) Excavation and Embankment required to raise an existing levee. (3) Excavation and Embankment at existing UPRR/B&M Bridge Co. Crossing at Levee. (4) Improvement of existing top of levee. (5) Construction of 6" aggregate surface course. (6) Topsoil placement, re-seeding and establishment of vegetation for erosion control on the side slopes of the levee. The work will require coordination with UPRR/B&M Bridge Co. Performance Period All work shall be completed within two hundred ten (210) calendar days. All flood control levee work, excluding maintenance of seeding, shall be completed within one hundred twenty (120) calendar days. All maintenance of seeding shall be completed within ninety (90) calendar days of completion of all other levee work. Other Information This is a Small Business contract. There will be a site visit (to be addressed on solicitation) to the project site, which will commence at the USIBWC Mercedes Field Office located at 325 Golf Course Road in Mercedes, TX 78570. The magnitude of this project is between $500,000 and $1,000,000. The solicitation, plans, and specifications are expected to be posted on or about 15 December 2017. The solicitation will be available for a minimum of thirty (30) calendar days, and award of the contract is expected on or before February 28, 2018. * This is NOT a request for Bid. Please do not submit a Bid in response to this Presolicitation Notice.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS