Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Alabama was posted on January 12, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

UPS PM & Service

Closed
SRC0000020510State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves semiannual inspections and preventive maintenance of two GE TLE-250kVA UPS systems at the Alabama Supercomputer Center, scheduled for January and June. The scope includes comprehensive testing and cleaning of critical power components such as the UPS units, batteries, static switch, rectifier, inverter, and power supplies. Inspections encompass verifying proper operation, system alignments within factory specifications, thermal scans, and electrical measurements of input/output voltages and currents. The batteries, consisting of four strings of Yuasa SWU585-12FR cells, are also tested to ensure optimal performance. Service technicians must be factory-trained and certified on the specific GE UPS systems, and a detailed report will be provided after each inspection, highlighting any issues and recommended corrective actions. The contract offers a six-month parts and labor warranty on repairs, with emergency response guaranteed within four hours. Parts are available at a 15% discount if purchased within a year, and the service includes a one-year service agreement. The project is located at the Alabama Supercomputer Center in Huntsville, with Michael Frazier serving as the primary contact for coordination.

General Info

Documents

2

Alabama State Standard Terms and Conditions for Quick Quote Solicitations

PDF, High priority: read this first4 pages · other
High

UPS Service and Preventive Maintenance Specs - Alabama Supercomputer Authority

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyAlabama
Contacts1 person available
OfficeN/A
Organization / AgencyAlabama
Office AddressN/A
Contacts

Full Description

Show more
Specification for UPS Service and Preventive Maintenance (PM) Alabama Supercomputer AuthoritySemiannual inspections and battery tests for two (2) GE TLE-250kVA UPS systems. Inspections to take place in January and June.Clean, inspect and test the critical power systems for the following equipment:Two (2) GE TLE-250kVA Uninterruptible Power Supplies1) SN: AS2250-3616-B150A2) SN: AS2250-3616-8153AFour (4) strings of forty (40) Yuasa SWU585-12FR batteries [two (2) strings per each UPS]Inspections will include, but are not limited to:System•  Proper fan operation•  Clean the interior of the system•  Check internal connections for proper torque•  Perform thermal scan of all breakers and power connectionsRectifier•  Record input/output voltage and currents•  Verify proper float and equalize settings for installed battery plant•  Verify AC ripple voltage is within tolerance on the filtered DC bus•  Verify system alignments are within factory specificationsInverter•  Record input/output voltage and currents•  Verify proper operation of inverter•  Verify system alignments are within factory specifications•  Verify DC currents on output of each inverter power stageStatic Switch•  Record inverter input voltage and currents to static switch•  Record bypass input voltage and currents to static switch•  Record static switch output voltage and currents•  Verify proper operations of static switch•  Verify system alignments are within factory specificationsPower Supplies•  Verify proper output voltage of each internal power supply•  Check for proper filtering of power supply output voltage•  Confirm power supply redundancy if applicable•  Adjust power supply output levels as requiredParts/Labor•  Special contract labor rates•  15% discount on any parts kits purchased within one year•  Six months parts and labor limited warranty on any repairs performed•  One-year service agreementEmergency response time will be withing four (4) hours.Service technicians must be factory trained and certified on General Electric (GE) TLE 250kVA Uninterruptible Powe Supply systems.A detailed report of the test results will be produced and emailed to the owner outlining any areas of concern along with an action plan to rectify all critical anomalies.Location:Alabama Supercomputer Center 686 Discovery DriveHuntsville, AL 35806-2802Contact:Michael Frazier (256} contact@example.gov

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS