Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Pennsylvania was posted on August 31, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

US 130 Access Management Needs Assessment

Closed
23-23-380State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
RFQ: Susquehanna River Road Corridor Safety, Shared-Use Path and Quarry Park Access Improvements
Solicitation # BPM059336
The Town of Port Deposit, in coordination with WILMAPCO, is seeking a multidisciplinary planning and engineering consultant to implement an integrated safety and mobility project for the Susquehanna River Road corridor. The scope of work focuses on establishing a context-sensitive safety strategy using the Safe System Approach, determining safe multi-modal access to the planned Hopkins Quarry Park, and evaluating the feasibility and preliminary design of a shared-use path between Granite Avenue and Octoraro Park. The project aims to produce an actionable 30 percent design and basis-of-design package by June 30, 2027, with the potential for future progression to final Plans, Specifications, and Estimates. This is a qualifications-based selection process where the contract will be awarded to the most qualified firm based on equal weighting of their proposed team and key staff, project approach, and related experience in rural corridor safety and riverfront access. Compensation and detailed scope will be negotiated after the selection of the highest-ranked firm; therefore, no fee or price information should be included in the technical proposal. The project is initially funded by the Wilmington Area Planning Council and the Maryland Department of Transportation Kimberly Lamphier Bikeways Grant Program. Selected consultants must provide proof of financial capacity, a bid affidavit, and professional liability insurance of at least 1,000,000 dollars per occurrence, while adhering to federal civil rights and non-discrimination provisions.
Town of Port Deposit

POSTED

about 10 hours ago

DEADLINE

in 19 days
NAICS: 541330
New
SLED
Lift Station Communication Improvement (FEMA)
Solicitation # 26-051UM-RFP
The City of Plant City is soliciting proposals under solicitation 26-051UM-RFP for a turnkey engineering design and implementation project to modernize the communication network for 55 wastewater lift stations. The project focuses on replacing or integrating Remote Terminal Unit (RTU) hardware and deploying a new cellular-based communication network to ensure seamless connectivity with the City's SCADA system. This initiative is partially funded by a FEMA grant via the Florida Division of Emergency Management, requiring all work to adhere to strict standards for system hardening, operational continuity, and disaster resilience. The project includes the delivery of pre-configured communication assemblies and requires installation by a licensed electrical contractor, with system startup performed by the supplier. The selection process utilizes a points-based evaluation focusing on the logical sequencing of the proposed project schedule, the credentials of the proposer, and a track record of at least three similar projects completed in Florida within the last ten years. Bidders must provide itemized pricing for site-specific materials and project-wide labor. Compliance requirements are extensive, including adherence to the Davis-Bacon Act, Equal Employment Opportunity regulations, the Americans with Disabilities Act, and specific FEMA sub-recipient agreement terms. Proposals are due by 2:00 pm local time on November 19, 2026, and must include a baseline project schedule, a human trafficking affidavit, and certifications regarding foreign country entities. Final acceptance of the work by the City is required before any applicable warranty periods commence.
Utilities Maintenance

POSTED

about 11 hours ago

DEADLINE

in 22 days
NAICS: 541330
New
SLED
Cellular Service Site Assessment and Feasibility Study
Solicitation # 2026-TA-0906
The Town of Nantucket, through its Town Administration, is soliciting proposals for a Cellular Service Site Assessment and Feasibility Study under solicitation number 2026-TA-0906. The project requires licensed professionals to evaluate the physical, structural, and regulatory suitability of the Town's water storage tanks for future telecommunications use. Key deliverables include a comprehensive final report and presentation, as well as a regulatory and permitting assessment identifying necessary approvals from the FCC, Massachusetts DEP, and the Nantucket Historic District Commission. The anticipated period of performance is twelve months, and the selected contractor must provide a detailed work plan and timeline. Proposals must be submitted electronically by November 4, 2026, divided into separate technical and price volumes. To be considered, firms must meet minimum qualifications, including at least three years of full-time experience in similar work and a proven ability to complete projects for comparable or larger municipalities. Evaluation is based on a minimum quality review followed by a comparative ranking of finalists based on project understanding and relevant experience. The Town will negotiate with the highest-ranked finalist whose price falls within the budgeted amount. The contract is governed by the laws of the Commonwealth of Massachusetts and requires the contractor to enter into the Town's standard 30B Form Service Agreement. Mandatory requirements include providing a Tax Compliance Certification, a Certificate of Non-Collusion, and evidence of financial stability. Comprehensive insurance coverage is required, including Commercial General Liability of $1 million per occurrence, a $3 million Umbrella/Excess Liability policy, and Workers' Compensation in accordance with Massachusetts General Laws. Payment terms are set at thirty days following the receipt of a satisfactory invoice.
Town Administration

POSTED

about 12 hours ago

DEADLINE

in 7 days
NAICS: 541330
New
SLED
Fruitland Sewer Extension Preliminary Engineering Report
Solicitation # 2027-RFP-033
Wicomico County is soliciting proposals under solicitation 2027-RFP-033 for professional engineering services to develop a Preliminary Engineering Report (PER) for the Fruitland Sewer Extension Project. The primary objective is to evaluate alternatives for providing public sewer service to seven specific focus areas around Fruitland, prioritizing locations prone to septic system failure. The project assumes connection to the City of Fruitland municipal sewer system and treatment at the City of Fruitland WWTP. While the scope excludes analysis of the treatment plant's capacity, the selected vendor must identify necessary upgrades for existing downstream pumping stations and sanitary sewers. The PER must comply with USDA RUS Bulletin 1780-2 and build upon the Wicomico County Water and Sewer Master Plan from September 2021. The contract will be awarded based on best value for money, with evaluation heavily weighted toward demonstrated experience, technical expertise, and project approach (35%), as well as the capacity to deliver products timely (15%). Required deliverables include a life cycle present worth cost analysis of feasible options, detailed cost estimates, and conceptual schematics. The successful vendor must provide a lump sum fee proposal and execute an Agreement for Engineering Services using EJCDC documents per RUS Bulletin 1780-26. Key administrative requirements include providing a Maryland Certificate of Status, submitting insurance certificates within ten days of award, and executing the contract within fourteen days of receipt. Proposals are due by December 2, 2026, at 2:30 pm via the electronic procurement portal.
Public Works

POSTED

about 14 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Power Delivery General Engineering Services
Solicitation # 2026-RFP-0300
The City of Pasadena Water and Power Department is soliciting proposals under solicitation 2026-RFP-0300 to establish a pool of qualified professional engineering firms for Power Delivery General Engineering Services. The objective is to secure supplemental support across six primary scope of work groups: substation design, SCADA/automation and communications, system planning, civil/structural engineering, EV infrastructure, and renewable energy and energy storage. Selected consultants will be assigned work via individual task orders on either a lump-sum or time-and-materials basis. The initial contract term is five years, with three optional one-year extensions available upon approval. Proposals must be submitted electronically through the City's eProcurement Portal, with a technical proposal and a separate price proposal. Evaluation is based on a weighted scoring system focusing on qualifications (35%), work experience (35%), and cost. To be eligible, firms must demonstrate at least five years of relevant experience and five completed projects within the last five years for each proposed scope group. Additionally, professional services must be performed by engineers registered in the State of California. The City offers a 5% preference for local Pasadena businesses and certified small or micro-businesses. Compliance requirements are extensive, including adherence to NERC, WECC, CAISO, and SCE standards, as well as California Labor Code prevailing wage laws and ADA accessibility guidelines. Required documentation includes a Unique Entity Identifier from SAM.gov, a Declaration of Non-Collusion, and various certifications regarding equal opportunity and conflict of interest. Invoicing is managed through the City's Vendor Invoice Portal, with payments processed via Accounts Payable.
Water & Power Department, Power Delivery

POSTED

about 14 hours ago

DEADLINE

in 9 days

AI Contract Overview

Show more

The US 130 Access Management Needs Assessment, solicitation number 23-23-380, focuses on the four lane principal arterial highway spanning Burlington and Mercer Counties in New Jersey. Due to the high volume of warehouse, manufacturing, and retail development along this corridor, the project aims to analyze the risks associated with unmanaged development, such as increased congestion and crash hazards. The primary goal is to provide a study that motivates municipalities to revise zoning and land development standards to align with the New Jersey Department of Transportation Access Management Code, ensuring future highway capacity and safety are maintained. This assessment will evaluate access management by examining individual driveways, the surrounding county and municipal roadway networks, and regional development patterns. The study will specifically look for opportunities to consolidate access, implement shared access, and redirect development toward appropriate local or county roads. Managed by the Transportation Planning agency in Pennsylvania, the solicitation was posted on August 31, 2026, with a response deadline of October 22, 2026.

General Info

US 130 access management study to improve highway safety and zoning in New Jersey.

Place of Performance

PA, USA

Set-Aside

NONE

Documents

2

DVRPC Budget Proposal - Consultant Cost Proposal

XLSX, High priority: read this first8 pages · cost-proposal
High

US 130 Access Management Needs Assessment RFP

PDF, High priority: read this first13 pages · rfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Transportation Planning
Contacts2 people available
OfficePhiladelphia, PA, 19106-1520, USA
Office AddressPhiladelphia, PA, 19106-1520, USA
Contacts
Betsy MastaglioAssociate Director, Multimodal Planning
Amy LamSenior Procurement and Contracts Officer

Interested Companies (13)

ConstructConnectCincinnati, OH
Foursquare Integrated Transportation PlanningWashington, DC
Clarke Caton HintzTrenton, NJ

See All 13 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
US Highway 130 in Burlington and Mercer Counties in New Jersey is a four lane, median divided, land access, principal arterial highway running parallel to the New Jersey Turnpike (I-95) and, in some segments, to Interstate 295. Access to local markets, to the Port of Elizabeth, and to the national interstate system have made the corridor attractive to development for warehouse and distribution centers, manufacturing, and retail commercial venues. Sites for new development and redevelopment remain, both abutting the highway and near to it. New driveways and higher volumes at existing access points increase the risk of congestion and crash hazards. Retrofit access management is expensive and challenging. The hope for this study is that, by understanding the risks of unmanaged development, municipalities may take action with zoning revisions and potentially adopting land development standards that complement the Access Management Code of the New Jersey Department of Transportation, with the result that future highway capacity and safety are effectively managed. The New Jersey State Highway Access Management Code provides for the creation of segment-level local access management plans (N.J.A.C. 16:47-12.1 et seq.). The rigors of this process, requiring municipal policy changes and concept-level design of every driveway and intersection on the segment, mean that almost no local access management plans have been developed statewide. Such a plan is not the object of this study. Rather, the study may motivate the need for a local plan or may motivate municipalities to examine their zoning and development standards to preserve safe, high-volume traffic on the highway. Because US 130 functions as a major regional transportation corridor, access management should be evaluated not only in relation to individual driveways or development sites but also to the surrounding County and municipal roadway network and the regional pattern and intensity of existing and future development. Attention should be given to opportunities to consolidate access, provide shared access, utilize existing intersections, and direct development access to appropriate local or County roadways where feasible.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS