Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Homeland Security was posted on October 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

USCG Cutter Eagle New Dredging for Berthing at New London City Pier

Closed
70Z0G126BSLISSW02Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Solicitation 70Z0G126BSLISSW02 is an Invitation for Bid issued by the USCG Civil Engineering Unit Providence for dredging operations at New London's City Pier in Connecticut. The project aims to deepen a new area south of the CGC Eagle's berth to a depth of -17.0 feet at Mean Lower Low Water, plus a 2.0-foot over-dredge allowance, to facilitate tugboat assistance during mooring and unmooring at all tide levels. The scope involves the removal of approximately 3,700 cubic yards of dredge spoils to an approved upland disposal site, as offshore disposal is prohibited due to environmental analysis. Additionally, the contractor must remove approximately 50 buried piles, cutting any that cannot be fully extracted at -21.0 feet MLLW. This procurement is a 100% Total Small Business Set-Aside with an estimated value between $1,000,000 and $5,000,000. The performance period is estimated at 300 calendar days from the Notice to Proceed, subject to a strict environmental window that permits in-water work only between October 1st and March 1st. Bidders must provide a 20% bid guarantee, and the successful awardee will be required to furnish performance and payment bonds for 100% of the contract amount. Award will be based on the lowest responsible bid that is most advantageous to the government. Key requirements include adherence to Davis-Bacon wage determinations, the use of the Invoice Processing Platform for payments, and the maintenance of qualified on-site supervision for quality control and safety.

General Info

USCG small business contract for dredging and pile removal at New London City Pier.

NAICS

23799

Place of Performance

New London, CT, 06320, USA

Set-Aside

SBA

Documents

15

70Z0G126BSLISSW02 - Eagle New Dredging at New London's City Pier

PDF, High priority: read this firstifb
High

Amendment 00001 - Solicitation 51283PR260024555

PDF, High priority: read this first2 pages · amendment
High

Amendment 00002 to Solicitation 70Z0G126BSLISSW02

PDF, High priority: read this firstamendment
High

Amendment 0003 for Solicitation 70Z0G126BSLISSW02

PDF, High priority: read this firstamendment
High

CT20260006 Wage Determination - Connecticut Heavy Construction

PDF, High priority: read this firstwage-determination
High

PSN 23946211 - EAGLE New Dredging Specifications

PDF, High priority: read this firstspecifications
High

Solicitation 70Z0G126BSLISSW02 - Amendment 0003 Attachment IFB Page 5

PDF, High priority: read this firstamendment
High

USCG Project 23946211 - Eagle New Dredging Drawings

PDF, High priority: read this firstspecifications
High

Abstract of Offers - 70Z0G126BSLISSW02

PDF, Low priorityabstract-of-offers
Low

CT DEEP Section 401 Water Quality Certification 202509798-WQC

PDF, Low priority17 pages · permit
Low

Disposal Facility Acceptance Letters - New London City Pier

PDF, Low priority3 pages · supporting-documents
Low

Green Earth Preliminary Acceptance Letter - New London City Pier Dredge Material

PDF, Low priority1 page · award
Low

New London City Pier Chemical Analysis Report

PDF, Low priorityspecifications
Low

Phoenix Environmental Laboratories Quotation - New London City Pier

PDF, Low priorityquote
Low

SF24 Bid Bond Form

PDF, Low prioritysupporting-documents
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

4 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Oct 15, 2026 to Oct 22, 2026. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Ceu Providence
Contacts2 people available
OfficeWarwick, RI, 02886, USA
Office AddressWarwick, RI, 02886, USA
Contacts

Full Description

Show more

Posted ABSTRACT OF OFFERS IFB 70Z0G126BSLISSW02.



AMENDMENT 0003 Posted October 16, 2026 to update Item 0002-Optional Item 1 in the IFB, by deleting the first paragraph to clarify that we're asking for the additional disposal costs for coated/treated piling.  Please replace page 5 of the IFB with the updated one provided in this amendment.


AMENDMENT 0002 Posted October 13, 2026 (Revised Bid Opening Date 10/22/2026 2pm EST)


AMENDMENT 0001 Posted October 08, 2026


Eagle Pier New Dredging (FY26) at New London’s City Pier, CT (NEW LONDON COUNTY), PSN #24014900.


Contractor shall provide all personnel, equipment, materials, and all other items and services required to perform dredging of a new area immediately south of CGC EAGLE’s berth at New London’s City Pier. The intent is to deepen the area to allow tugboats to assist the cutter for mooring/unmooring at all tide levels. Requirements of the design specify dredging to a depth of -17.0’ at Mean Lower Low Water (MLLW) +2.0’ over dredging allowance. This equates to approximately 3,700 cubic yards (CY) of dredge spoils to remove to an upland disposal site. Offshore disposal is not permitted due to environmental sample analysis of the dredge area. There is an environmental time of year restriction in Connecticut that only permits dredging activities between October 1st and March 1st.


SPECIAL NOTES: The contractor shall conduct dredging operations so that navigation through the channel is possible at all times. The scope of work also includes removals of approximately 50 piles that remain below the waterline. Any piles that cannot be fully removed are to be cut at -21.0’ MLLW. Dredge quantity of 3,700 CY. This estimate is based on an average of the past annual dredging and surveys. The Contractor shall provide a cost for dredging per cubic yard. That per cubic yard cost will be used for any necessary contract cost adjustment resulting from dredging more or less than the estimated 3,700 cubic yards, within the limits of dredge. Contractor will be compensated for actual quantity of dredge material removed and disposed, within the limits of dredge, as shown on the plan sheets.  Dredge disposal site location is to be determined by conditions of treated/non-treated piles for Base bid item and Option Bid item.


The estimated value of the procurement is between $1,000,000 and $5,000,000. A 20% bid guarantee is required. Performance and Payment bonds will be required. The performance period is estimated to be 300 calendar days from issuance of Notice to Proceed.
This acquisition is issued pursuant to FAR Part 14 Sealed Bidding and is 100% Set-Aside for Small Business concerns. All relevant solicitation documents, including specifications and drawings may be accessed for download beginning on the date of issue of the IFB at the following site: https://www.sam.gov. Vendors MUST be registered in the System for Award Management database through https://www.sam.gov in order to receive a federal government contract.



THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS PRESOLICITATION NOTICE OR ANY FOLLOW-UP INFORMATION REQUEST.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS