USCGC ALEX HALEY Switchboard Replacement

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The United States Coast Guard is seeking a contractor to replace the obsolete ship service switchboards on the USCGC Alex Haley. This project involves a three-phase process encompassing design, fabrication, and installation support for a new 450 VAC, three-phase switchboard. The equipment must be built to UL 891 and IEEE 45 standards and fit within specific dimensional constraints of 192 inches in length, 25.25 inches in depth, and 81 inches in height. To ensure successful rigging and installation, the switchboard will be constructed in four separable sections capable of withstanding 45 degree rolls and 10 degree pitch in a marine environment. In addition to hardware fabrication, the selected vendor must conduct critical electrical system analyses, including failure modes, arc flash, protective device coordination, and fault current studies. The work will be performed in Kodiak, Alaska, under NAICS code 335313. This forecast is managed by the Department of Homeland Security and the United States Coast Guard.

General Info

USCG seeks contractor to design, fabricate, and install switchboards for USCGC Alex Haley.

Agency

Department of Homeland Security → United States Coast GuardView Agency

NAICS

335313 - Switchgear and Switchboard Apparatus ManufacturingView NAICS

Place of Performance

Kodiak, AK, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment of Homeland Security → United States Coast Guard
Contacts3 people available
OfficeN/A
Organization / Agency
Department of Homeland Security → United States Coast Guard
View Agency Profile
Office AddressN/A
Contacts
Laura LugoSmall Business Specialist/APFS Coordinator

Full Description

Show more
The 282-FT USCGC ALEX HALEY (WMEC-39) Ship Service Switchboards are no longer supportable and require replacement. This project entails the replacement of the ship's service switchboards through a comprehensive three-phase process covering design, fabrication, and installation support. The new 450 VAC, three-phase switchboard must adhere to strict dimensional constraints, with a maximum size of 192 inches in length, 25.25 inches in depth, and 81 inches in height, and must be built to UL 891 and IEEE 45 standards. Designed for a marine environment, it will consist of four separable sections to facilitate rigging and installation and must withstand up to 45° rolls and 10° pitch. Additionally, the vendor will be required to perform critical electrical system analyses, including studies on fault currents, protective device coordination, arc flash, and failure modes.

Similar Contracts

Same NAICS industry code

NAICS: 335313
New
SLED
ITB# 202636-Purchase of Two (2) Low Voltage Switchboards for Wastewater Treatment Plant Backup Generators (Re-Bid)
Solicitation # 202636
The City of Homestead is soliciting bids for the procurement, furnishing, and delivery of two complete low voltage switchboards, specifically the generator output switchboard (SWBD-GEN) and the distribution switchboard (SWBD-DIST), for its wastewater treatment facility. This project is part of a critical infrastructure initiative to enhance operational resilience during electrical outages and is funded by the U.S. Department of Housing and Urban Development's CDBG-MIT I0127 grant. The equipment is being pre-purchased to mitigate long lead times and will be installed under a separate contract. The scope includes the delivery of the switchboard assemblies, the performance of comprehensive power system studies, and the provision of in-person support for installation, commissioning, and training. Key requirements include strict adherence to Build America, Buy America (BABA) regulations, NEMA rated components, and UL 2200 listing. Bidders must be registered in SAM.gov and provide a Unique Entity Identifier (UEI). The contract will be awarded to the lowest responsive and responsible bidder based on factors such as contractor integrity, past performance, and technical resources. Deliveries are subject to a 30-week maximum timeframe, and the equipment carries a 24-month warranty following final acceptance. Payment is made in full upon receipt and acceptance of the complete units, with no down payments permitted. All submissions must be made electronically via the City's e-Procurement Portal by October 13, 2026.
Public Works

POSTED

1 day ago

DEADLINE

in 23 days
View Details
NAICS: 335313
New
CIRCUIT BREAKER AY — 5925017186439 — N0010426QEF48
Solicitation # N0010426QEF48
Solicitation NO0014-26-Q-EF48 is a request for quotations issued by NAVSUP Weapon Systems Support Mech for the procurement of three Circuit Breaker AY units (NSN 5925-01-718-6439). The award will be granted to the responsible offeror providing the lowest priced, technically acceptable offer, with a 10 percent price evaluation preference applied to qualifying HUBZone small business concerns. Technical compliance is governed by a strict order of precedence, prioritizing contract amendments and the schedule of supplies over individual repair part ordering data, standard technical requirements, and referenced drawings. Contractors must adhere to the MIL-I-45208 higher-level quality standard and provide a Certificate of Compliance per DI-MISC-81356 at the time of material delivery. The contract mandates rigorous packaging and marking standards, requiring MIL-STD-2073-1 for system stock and overseas shipments, and MIL-STD-129 for marking and labeling. All items must be inspected and accepted at the contractor's plant. Key regulatory requirements include compliance with DFARS 252.204-7012 for safeguarding covered defense information and strict adherence to Naval Nuclear Propulsion Information protocols. Additionally, the contractor must ensure that no mercury or mercury-containing compounds are intentionally added to the hardware. Payment and invoicing are to be processed electronically through the Wide Area Workflow system.
Navsup Weapon Systems Support Mech

POSTED

2 days ago

DEADLINE

in 29 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS