This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on November 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
USCGC Polar Star 1000KW Generator Rental
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
General Info
Place of Performance
Set-Aside
AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- Marine Hatch Fabrication and SupplyOpen now, due in 10 days
- O-RINGOpen now, due in 10 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Combined Synopsis
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
RENTAL SERVICES FOR 1,000Kw GENREATOR
Background USCGC POLAR STAR is preparing to get underway while a Ship Service Diesel Generator is unavailable. To sustain required cutter capability, the United States Coast Guard requires temporary portable electrical-generation capability, including the equipment and accessories necessary to connect the generator to the cutter's Viking International shore-tie connections. The rented generator will be placed aboard the cutter and used as temporary shipboard electrical generation during the rental period.
- Scope.
Provide rental and delivery of one portable generator package meeting the requirements below to the delivery location identified in this SOW for an anticipated rental period of approximately six months. The contractor shall also retrieve the generator package from the pier at the end of the rental period.
Minimum power rating 750 kW (prime), maximum 1000 kW, 450/480 VAC, 3-phase, 3-wire power. Generator must be able to withstand 1.5 times rated current for up to 30 seconds.
Minimum generator insulation class F.
Electrically operated generator circuit breaker, of either insulated-case or power circuit breaker type, must be installed for protection of the generator and the connecting power cable, with electronic trip unit capable of long-, short-, and instantaneous tripping. Circuit breaker must be rated for minimum 45 kA asymmetric interrupt rating.
Protection settings must be set for generator protection in accordance with American Bureau of Shipping (ABS) Marine Vessel Rules (MVR) 2025 Part 4, Chapter 8, Section 2, Paragraph 9.11 (4-8-2/9.11). Specifically:
- Overload protection
- Short-circuit protection
- Thermal damage protection
- Reverse power protection
- Prime mover shutdown
- Undervoltage protection
300’ of cable rated for 115% of generator maximum current in 40 deg C ambient, minimum 90 deg C rated cable. Cable must be rated for flexible service, single conductors no larger than 4/0 for purposes of installation on the ship.
Generator must be enclosed in a standard 30-foot or 40-foot shipping container. Exact specifications and dimensions must be provided in the proposal.
Internal lighting, and all necessary control systems for operators to manage the system inside the container must be installed.
Generator engine must be electrically started. Battery capacity must be sufficient when fully charged for at least 10 starts.
Switchgear and bus bar must be braced for asymmetric short-circuit carrying capacity of the generator.
The container must include a radiant cooling system capable of maintaining generator temperature in a range of ambient temperatures. The generator must be capable of operation in ambient temperatures of 15 degrees F to 100 degrees F.
The generator fuel system must be capable of being refueled while on-line, may be connected to ship’s power for heaters and battery chargers, but must not require any other fluid or system inputs from the ship.
The generator and container must be suitable for marine use on board a ship, and the container must have suitable protection from rain, salt spray, low-level flooding from waves, snow, ice, and operating angles up to 15 degrees. It must have physical connections for attachment on deck, and external grounding points for grounding container to the hull.
Generator must not have neutral grounding, and any installed ground protection features must be disabled. Grounding of the container will be installed by the Government.
Fuel tank must be suitable for generator operation at 50% prime rated power without refueling for 24 hours.
Excitation system must not require external power source or field flashing prior to operation.
Heaters must be provided to support generator operation within 15 minutes.
Exhaust system must include suitably sized spark arrestor and silencer.
Generator total harmonic distortion must be less than 3%.
- Tasks. The contractor shall provide operator and maintenance instructions necessary for the Government to operate and maintain the generator during the rental period. The contractor shall also provide any filter kits and consumables included in the rental package for routine Government-performed maintenance during the rental period, if applicable. The contractor is not responsible for performing routine operation, fueling, hookup, or maintenance during the rental period unless separately stated in the contract.
- Delivery To/ Place of Performance: USCGC POLAR STAR will be located in Pearl Harbor, HI, Joint Base Pearl Harbor-Hickam, 850 Ticonderoga St, JBPHH.
The contractor’s responsibility is limited to delivery of the generator package to the pier adjacent to the cutter and retrieval of the generator package from the pier at the end of the rental period. The Government will provide crane support, place the generator aboard the cutter, perform hookup and grounding, provide fuel, and perform operation and routine maintenance.
- Period of performance- 10 December 2026 through 30 June 2027.
- Acceptance. The generator rental will be accepted when the contractor has:
- delivered the generator package to the specified pier location by the required delivery date;
- provided a unit that conforms to the electrical and physical characteristics stated in this SOW;
- provided the required cables, connectors, and operating/maintenance instructions; and
- delivered the unit in serviceable condition, free of visible shipping damage.
- Points of Contact.
- USCG-SFLC-LRE PL Asset Management: CWO Matthew Temple, •••••@•••••.•••Sign up to see this detail, +1 (•••) •••-••••Sign up to see this detail
- USCG-SFLC-LRE PL Asset Management: LCDR Andrew Constant, •••••@•••••.•••Sign up to see this detail
- USCGC POLAR STAR Engineering Officer: Joshua Herring, •••••@•••••.•••Sign up to see this detail
More opportunities from Department Of Homeland Security → CG-SEA-C22
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS