Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on August 7, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

USFS Joint Precision Air Drop System Capability Solutions

Closed
SN-2018-09Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334511
New
DIBBS
TAG, CASUALTY TRIAGE
Solicitation # SPE2DS-27-T-1137
Solicitation SPE2DS-27-T-1137, issued by the DLA Troop Support Medical Supply Chain, is a request for quotations for the procurement of one package of Casualty Triage Tags (NSN 6515-01-587-1700). These combat casualty cards are designed for patient documentation during the three phases of tactical combat casualty care and are constructed from waterproof, tear-resistant ruggedized paper. Each tag features a grommet-reinforced punch and is sized to fit into an Individual First Aid Kit (IFAK). The required unit of issue is a package containing 25 tags, with pack dimensions of 6 by 4.5 by 1.5 inches and a weight of 5.5 ounces. The contract requires strict adherence to DLA packaging and marking standards, specifically RP001, ASTM D3951, and Medical Marking Standard No. 1, which supersedes MIL-STD-129 for medical materials. Delivery is required by November 2, 2026, with destination inspection mandated under FAR 52.246-2. Administrative requirements include the use of the Wide Area Workflow (WAWF) system for invoicing and payment. The procurement is subject to the Buy American Act and DFARS 252.225-7001, and it incorporates specific cybersecurity and telecommunications restrictions. Evaluation may include a price preference for HUBZone small businesses, and all offerors must maintain active certifications in the System for Award Management (SAM).
MEDICAL SUPPLY CHAIN MD SURG FSF

POSTED

about 4 hours ago

DEADLINE

in 6 days
NAICS: 334511
New
Federal
Automated Traffic Enforcement Trailer
Solicitation # W911S226U4411
Solicitation W911S226U4411 is a Total Small Business Set-Aside for the procurement of a complete, towable, autonomous mobile traffic enforcement trailer and laser-based measuring system for the Department of Defense at Fort McCoy, Wisconsin. The primary requirement is for one Automated Traffic Monitoring System Trailer, specifically the POLISCAN Speed FM1 or an approved equal, capable of tracking multiple vehicles across at least four adjacent traffic lanes to enforce speed limits and red-light violations. The contract includes a requirement for eight hours of on-site operator training at Fort McCoy and a minimum 12-month comprehensive manufacturer's warranty. All equipment must be new, and the system must be calibrated to federal and state standards to ensure data is legally admissible in court. The award will be granted to the responsible offeror whose proposal is most advantageous to the government based on price and technical evaluations. Delivery is required F.O.B. Destination to Fort McCoy, with a preferred delivery window of 30 days. Offerors must submit their proposals via the PIEE Solicitation module, including technical, price, and past performance documentation. A critical requirement for responsiveness is the completion of Attachment 1 regarding certifications and the identification of the country of origin. The contract incorporates various regulatory clauses, including Buy American preferences, cybersecurity reporting under DFARS 252.204-7012, and prohibitions on certain telecommunications equipment.
W6QM Micc-Ft Drum

POSTED

about 9 hours ago

DEADLINE

in 7 days

General Info

NAICS

334511 - Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

Place of Performance

Not Applicable, ID, USA

Set-Aside

NONE

Documents

1

JPAD_RFI.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

special-notice

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → USDA Forest Service
Contacts1 person available
OfficeBOISE, ID, 83705, USA
Office AddressBOISE, ID, 83705, USA
Contacts
Kasey J. AldrichContract Specialist

Full Description

Show more
Special Notice Number: SN-2018-09 Agency: United States Forest Service Office: Washington Office, Acquisition Management, Incident Support Branch Location: Various Locations RFI Issue Date: August 07, 2018 RFI Response Date: September 07, 2018 NAICS Code: 334511, Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing Size Standard: 1250 employees Potential Quantity: 10-30 units Submittal of information: The information requested by this RFI shall be provided, in writing (electronically), by close of business (4:00 p.m. Mountain Time) September 07, 2018 to the following address: U.S. Forest Service National Interagency Fire Center (NIFC) 3833 South Development Avenue Attn: Mr. Kasey Aldrich, Owyhee Building 106, Suite 1101-1 Boise, Idaho 83705-5354 Or contact@example.gov, Synopsis: This Request for Information is for Market Research and Planning purposes only. THE GOVERNMENT DOES NOT INTEND TO AWARD A CONTRACT ON THE BASIS OF THIS RFI OR TO OTHERWISE PAY FOR THE INFORMATION SOLICITED. This RFI does not constitute a solicitation for proposals or the authority to enter into negotiations to award a contract. No funds have been authorized, appropriated, or received for this contemplated effort. This RFI is for planning purposes only and shall not be considered as a request for proposal or as an obligation on the part of the Government to acquire any products or services. No entitlement to payment of direct or indirect costs or charges by the Government will arise as a result of contractor submission of responses to this RFI or the Government's use of such information. The Government reserves the right to reject, in whole or in part, any contractor's input resulting from this RFI. Responses to this RFI will not be returned. Whatever information is provided in response to this RFI may be used to assess tradeoffs and alternatives available for future needs. The information provided may be utilized by the US Forest Service in developing its acquisition strategy and in its Statement of Objective, Statement of Work, and/or Performance Specifications. The information resulting from this RFI may be included or combined with other submissions in one or more options considered in the analysis of alternatives. Any proprietary information that is submitted may be used in establishing requirements of the future system but specific information will be safeguarded as proprietary. Contracting Office Address: Owyhee Building - MS 1100 3833 S. Development Ave. Boise, ID 83705 Primary Point of Contact: Kasey Aldrich, Contract Specialist contact@example.gov +1 (555) 000-0000 Technical Points of Contact: Mike Fritsen (Primary) contact@example.gov +1 (555) 000-0000 Or Justin (JT) Gilman contact@example.gov +1 (555) 000-0000 Background: This Request for Information (RFI) briefly describes the current United States Forest Service (USFS) Joint Precision Air Drop System Ultra-Light Weight (JPADS-ULW) program/acquisition approach, identifies key events in the JPADS-ULW acquisition program schedule, and requests information to assess industry's capability to provide a materiel solution that will meet the draft JPADS-ULW system requirements. The program office is currently planning to employ an evolutionary acquisition strategy to procure a commercially proven product based on mature technology and variant of the JPADS Family of Systems (FoS) for fielding of a new JPADS solution. Information gathered from vendors to this RFI will be used to help refine USFS JPADS performance requirements. The information provided in this RFI is notional and may change. The Government will provide any additional information and issue any additional requests for information at its sole discretion via the FedBizOpps. Description: USFS Fire and Aviation Management (FAM) is conducting an Analysis of Alternatives for High Altitude High Opening (HAHO) systems that can perform some or all of the core tasks and missions of the USFS smokejumpers Aerial Delivery. One of these missions is re-supply of firefighters in remote locations, under low-visibility conditions (smoke, night, etc.). This RFI will provide the opportunity for contractors to describe, in detail, the ability of their candidate systems to accomplish this mission. In those situations, firefighters are operating in areas requiring an autonomously guided aerial delivery system that can deliver critical supplies and equipment when precision and standoff are required due to ground threat, terrain, or winds. HAHO re-supply systems allow aircraft to operate above and offset from problem terrain or decreased visibility. The objective of this RFI is to identify potential solutions, technologies, and state of the art approaches to the precision air drop capability to re-supply firefighters in the operational environment. Requested Information: Vendors are requested to provide information on the ability of their system to meet the following notional performance specifications: 1. Is this system and program sold to the general public or offered for sale to the general public? If so, please provide information on where to purchase and market prices. 2. System Characteristics: The system should allow it to be an aircraft deployed, under a steerable canopy system, equipped with hardware and software to deliver 250 to 550 pound cargo loads safely and effectively from 24,500 feet Mean Sea Level (MSL) through hardware and software altitude control and glide management of system descent and landing. System hardware and software should function up to deployment altitudes in an un-pressurized cabin environment. The system should allow interface, be deployable by static-line drogue, and double or single bag static line. The USFS smokejumpers typically utilize fixed wing with either side-door or rear door deployments. The JPADS-ULW must be compatible with palletized or boxed cargo rigged under acceptable smokejumper paracargo methods. 3. Weight Carrying Capabilities: The system must be capable of delivering cargo loads with suspended weights of 250 to 550 pounds. A maximization of cargo capacity and minimization of system weight is a key consideration. 4. Deployment Altitude, Feet Mean Sea Level (MSL): The system when rigged with cargo loads of 250 to 550 pounds should have an operational airdrop range of 2,500 to 24,500 feet MSL. 5. Offset Requirement: The JPADS-ULW should allow for a minimum of an 8 km horizontal offset from the intended impact point. The offset is defined as the horizontal distance from a 24,500 feet MSL release point to a zero MSL landing point in zero wind conditions. 6. Descent Speed: The system should maintain a stable descent rate, which must result in a descent speed, vertical and horizontal, which will allow cargo to survive. 7. Landing Requirements: The system should deliver cargo on target, in condition for operational use. Rapid de-rigging, with soft landing, is highly desired. 8. Precision of Delivery (Accuracy): The System should have an accuracy of 80 meter radius from the intended impact point (IP), with reasonable assumption that user experience and vendor collaboration will yield improvements in this standard. 9. Interface to JPADS-Mission Planner (JPADS-MP): The system must have the capability to interface with a mission planner. The FS does not currently have MP developed. Please provide in your response, your existing capability to aid in development, or provide existing. 10. Major Components List: The system must consist of an Autonomous Guidance Unit (AGU), able to interface equipment to cargo and cargo aircraft as needed and be compatible with assorted government provided deceleration systems in use by the smokejumper program, both current and yet to be developed. Currently the smokejumpers utilize Performance Designs CR-360, Airborne Systems DC-7. 11. System Weight: The weight of the JPADS-ULW Autonomous Guidance Unit will not exceed 44 lbs. 12. Guidance Control Unit: Must be capable of being programmed by downloading information from a computer with readily available commercial interfaces. The destination coordinates should be able to be programmed into the GPS unit / navigation package by a user within 5 minutes. The system must be able to accept coordinates in latitude/longitude and military grid coordinates as a minimum. Positive feedback must be provided to ensure that the system is properly programmed. The system must be capable of accepting programming/reprogramming using a standard computer. The system must be capable of onboard computational capabilities to aid in determining course made good, wind speed and direction, control values for optimal performance, and in making go/no go decisions. The navigational package must allow go/no go decisions to be made en-route to drop, based upon previously calculated information. Way point navigation is desired. 13. Test and Diagnostic Equipment: Must be provided or built in to the equipment and software to ensure proper functioning of the equipment prior to the actual delivery of cargo. 14. Navigation Package: Must be designed to facilitate repair at the lowest possible level within the fire cache system. Where possible, the electronics must be modular in nature. 15. Physical Characteristics: The physical dimensions of the JPADS-ULW system must be defined as height above rigged cargo box or palletized load. 16. Interface Requirements: The JPADS-ULW system must be capable of being delivered from standard smokejumper aircraft, including but not limited to Twin Otter, SD3-60 Sherpa, CASA 212, Dornier 228, at 90 - 120 KIAS (objective) must be compatible with current accepted methods of rigging and dropping. 17. JPADS-ULW System: Must interface to a variety of cargo configurations using standard military or smokejumper cargo rigging procedures according to the Interagency Smokejumper Operations Guide. 18. Interface Connection between the Navigation Unit and the Laptop Computer: Must be a standard serial, usb or parallel port type connector or wireless connection. The system must be able to receive a signal inside the aircraft with a GPS repeater type system. 19. System: Must be able to receive a signal through a receiver to a mission planner if provided or developed. 20. Reliability: System must be able to be reused with no major repairs 20 times (threshold) and 30 times (objective) and must meet a 95% reliability rate with 90% confidence. 21. Maintainability: Maintenance of the parachute and suspension system must be accomplished, where appropriate, by smokejumper paraloft personnel. Deployment systems may be OFS, or developed by FS personnel and compatible with current smokejumper cargo delivery operations. 22. Environmental Conditions: The JPADS-ULW system must be designed for operational use, storage, and transit in climatic variables to include US Navy amphibious shipping. These variables may be hot, cold, and basic temperature ranges as defined in referenced document AR 70-38 as well as defined in MIL-STD-810-F, Method 509.4 (Salt Fog), Method 510.4 (Sand and Dust), Method 520.2 (Temp, Humidity, Vibration and Altitude) and Method 506.4 procedure III and method 507.4 (rain drip). 23. Transportability: System must be capable of being transported by highway, rail, marine, and air modes, world-wide. The applicable transportability criteria are set forth in referenced documents AR 70-47 and MIL-STD-1366. If the JPADS-ULW uses lithium or lithium ion batteries, the batteries must meet the criteria in NAVSEAINST S9310-AQ-SAF-010 "Technical Manual for Batteries, Navy Lithium Safety Program Responsibilities and Procedures" of 19 August 2004 and 49cfr173.185. 24. What is the estimated delivery time from the time or order? 25. What is the estimate cost per unit? 26. What is the location of the manufacturer? 27. Who is the manufacturer or are you a third party distributor? 28. Any additional information that may be pertinent to the operation of your system? Company Information: Vendors/contractors who respond to this Request for Information (RFI) are requested to provide all of the following information in writing and in accordance with the directions below: 1. Company name 2. Company mailing address 3. Company point of contact (name & title) 4. Point of contact's telephone numbers (office & fax) 5. Company's size standard for the NAICS information provided above Note: You may provide any other pertinent information that may contribute to efficiencies related to this RFI that will assist the Government in developing specifications for future solicitations.

More opportunities from Department Of Agriculture → USDA Forest Service

Same awarding agency

NAICS: 621111
New
Federal
Jacobs Creek JCC Medical Services
Solicitation # 1282A727Q0002
Solicitation 1282A727Q0002 is a Request for Quotation issued by the USDA Forest Service for on-site medical services at the Jacobs Creek Job Corps Center in Bristol, Tennessee. This firm-fixed-price contract is 100% set aside for small businesses under NAICS code 621111. The scope of work requires licensed medical professionals, such as Physicians, Nurse Practitioners, or Physician Assistants, to provide basic health services including examinations, assessments, treatment, immunizations, and prescription issuance. Services are typically required one to two days per week, Monday through Friday, from 8 am to 5 pm, totaling 400 hours per year. The contract structure consists of a base year running from January 11, 2027, to January 10, 2028, with four one-year options and a final six-month extension. Award will be based on best value, with technical capability and past performance weighted more heavily than price. To be considered responsive, offerors must submit a completed Quoter’s Questionnaire, current resumes for key personnel, unrestricted medical licenses, DEA registrations, and proof of medical liability insurance of at least 1 million dollars. All services must comply with OSHA, HIPAA, and American Medical Association guidelines. Invoices are to be submitted monthly via the Invoicing Processing Platform. Quotations must be submitted in Word or PDF format to the designated point of contact by 5:00 PM Eastern Time on November 17, 2026.
Offices of Physicians (except Mental Health Specialists)

POSTED

1 day ago

DEADLINE

in 19 days
View Details
NAICS: 237310
New
Federal
GAOA Brainard Lake Recreation Area Deferred Maintenance
Solicitation # 1240LT27Q0004
Solicitation 1240LT27Q0004 is a Request for Quotation issued by the USDA Forest Service for deferred maintenance and accessibility improvements at the Niwot Picnic Trailhead within the Brainard Lake Recreation Area near Ward, Colorado. This project, estimated between $100,000 and $250,000, is a 100% Total Small Business Set-Aside under NAICS 237310. The scope of work includes demolishing existing timber parking barriers and retaining walls, constructing new rock retaining walls and timber steps, creating accessible compacted aggregate trails, renovating and constructing picnic sites, and revegetating disturbed areas. The contractor must commence work within 10 calendar days of the notice to proceed and complete all tasks, including final cleanup, within 120 calendar days. The contract is awarded based on the lowest price technically acceptable criteria, evaluating the offeror's technical approach and past performance on at least three similar projects completed within the last three years. Required submissions include a signed SF1442, a priced Schedule of Items, a technical proposal, and bid guarantees. Key compliance requirements include adherence to Davis-Bacon wage determinations, OSHA safety regulations, and MUTCD standards for signage. Performance and payment bonds are required, and the contractor must submit a company-approved accident prevention plan and evidence of insurance before beginning on-site work. Inspection and final acceptance are governed by FAR 52.246-12.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in about 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS