This Government Contract opportunity from Department Of Defense was posted on March 28, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
PDF, High priority: read this first1 page · specifications
HighAI Summary for ABB ACS800 Hole Patterns and Mechanical Installation: Technical specifications and installation guide for mounting ABB ACS800 drives. The document provides step-by-step mechanical installation instructions and a detailed table of hole patterns, dimensions (H, W, D1, D2), and screw sizes for frame sizes R2 through R6.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for AHU Mount - VSD & Change Over Switch Technical Drawing: Technical specification and mounting drawing for a Variable Speed Drive (VSD) and Change Over Switch (COS) to be attached above an Air Handling Unit (AHU). Includes mounting requirements, spacing for cables, and dimensional notes. Dated 2010-11-10 by Wilhelmsen Marine Engineering.
DOC
DOC, High priority: read this first2 pages · amendment
HighAI Summary for Amendment 0003 to RFP N40442-11-R-3000: Amendment 0003 to RFP N40442-11-R-3000 provides a clarification in Section M regarding Specification Item 205, Para 7.9 (MDG #1 Cooler Casing Leak Repair). It specifies that the OEM must oversee and perform work with shipyard labor and identifies FME as the only authorized T-AKE main diesel OEM for work in CONUS and US territories.
DOC
DOC, High priority: read this first2 pages · amendment
HighAI Summary for Amendment 0004 to RFP N40442-11-R-3000: Amendment 0004 to solicitation N40442-11-R-3000 provides clarifications via a Q&A format. Key updates include specifying the size and quantity of HAZMAT containers (two 20ft containers) for temporary storage and correcting a reference range for Government Furnished Material (GFM) in the Bill of Materials from 2.2.1-2.2.4 to 2.2.1-2.2.8.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Bulkhead Mount Specifications: Technical drawing specifications for bulkhead mounting of VSD and COS components, including dimensional requirements, cable spacing (minimum 200mm), and the use of horizontal L-beams for support.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ChangeOverSwitchDimensions: Technical dimension specifications for change-over switches (16A to 63A and 160A) for various fan models, referencing ANSI A30-2010 and Wilhelmsen Marine Engineering.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Compressor and Pumpstarters Panel Dimensions - Project 2000-01-01-0001: Preliminary technical specifications and dimensions for compressor and pumpstarter panels for T.C. Kültür ve Turizm Bakanlığı (Contract No: 2000-01-01-0002). The document includes physical attributes such as weight (1,225 KG), color (Gray FSC # 26770), and a preliminary itemized pricing list.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Enclosure 2.2.11 Loop Seal Installation Details: Technical installation drawings and general notes for Loop Seal piping on a vessel. The document provides detailed plan views, sections, and elevations for removing existing piping and installing new 3-inch and 6-inch loop seals, including welding standards (USCG, ABS) and pipe hanger requirements (ASTM F-708).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Enclosure 2.2.6 List of Material (Rev B): A technical specifications document and Bill of Materials (BOM) for a maritime or industrial project (referencing NASSCO). It includes a detailed list of materials, part numbers (e.g., PPE Spool Assemblies), general notes for installation, and references to various plan views and deck drain piping layouts. The document includes revision history and plant designations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Enclosure 2.2.7 (8389534 Rev B) - List of Material: This document is a technical material list and general notes section for the T-AKE project (Revision B). It includes a bill of materials specifying parts from Henry Products Inc. and Carling Electric Corp., along with general engineering notes and abbreviations. The document contains critical technical specifications for copper panels and bonding wires.
DOCX
DOCX, High priority: read this first5 pages · sow
HighAI Summary for HVAC and Cargo Chillers VSD Install Support: This document is a Statement of Work (SOW) providing shipyard support for an MSC contractor performing the installation of Variable Speed Drives (VSD) for HVAC and Cargo chillers. It details specific requirements for rigging, removal of existing equipment, foundation modification, material routing, and the provision of shore-based facilities, electrical power, and crane services. It includes references to NAVSEA drawings and General Technical Requirements (GTRs) for painting, piping, and electrical systems.
DOCX
DOCX, High priority: read this first11 pages · amendment
HighAI Summary for HVAC Variable Speed Drive (VSD) Install Support Amendment 1: This document is an amendment providing detailed technical requirements and a statement of work for shipyard support regarding the installation of HVAC Variable Speed Drives (VSD) by an MSC contractor. It includes specific equipment locations, references to technical drawings, material requirements, and detailed tasks such as rigging, fabrication, hot work, and cable tray installation across various ship compartments.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for MSC # 8390916 Starter Mount: Technical specification and mounting diagram for VSD and Change Over Switch (COS) start cabinets, referencing MSC # 8390916 and compliance with NIST 800-44 Rev. 1 guidelines.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for MSC # 8390917 AHU Mount Specifications: Technical mounting specifications for VSD and Change Over Switches (COS) on an Air Handling Unit (AHU) frame, including dimensional requirements and profile mounting instructions for MSC # 8390917.
DOC
DOC, High priority: read this first2 pages · amendment
HighAI Summary for N40442-11-R-3000 Amendment 0001 - Summary of Changes: Amendment 0001 to solicitation N40442-11-R-3000. This document provides a summary of changes to Section B, including revisions to Work Items 104, 205, 805, and 806, and the addition of Work Item 520 regarding Firemain cutout valve repairs.
DOC
DOC, High priority: read this first11 pages · amendment
HighAI Summary for N40442-11-R-3000 Amendment 0002: Amendment 0002 to solicitation N40442-11-R-3000 for USNS Lewis & Clark ROH/DD. Key changes include extending the closing date to January 18, 2011, confirming the project is a total small business set-aside requiring dry-docking, and providing detailed responses to contractor questions regarding technical drawings, phenolic block modifications, brine system flushing, and hardware replacement procedures.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Panel Dimensions - CS2 (Refrigeration Plant): Technical drawing and specification document for the CS2 refrigeration plant panel, including front and side views, dimensions, and component details (pump starters, main switch, VSD motor unit). Produced by York Marine AB/Maintenance AB.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Panel Dimensions - CS8_1: A preliminary technical specification document detailing panel dimensions, cabinet colors (Gray, FSC # 26370), and hardware requirements such as latching nuts. The document includes references to ANSI Z87.1 and contains dated entries from 10/16/95.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Panel Dimensions-CS8_2: A preliminary technical dimensions drawing and specifications document for panels, including base plate measurements, scale references (1:30), and specific part dimensions in inches and millimeters.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Phenolic Block Installation Details - Rev A: Technical specifications and installation instructions for replacing 1/2 inch phenolic blocks with 100mm (4 inch) blocks in Cargo Hold 3 (2nd and 4th decks) to improve thermal isolation. The document includes detailed work instructions for cooler table bulkhead foundations, plenum support I-beams, and mid-span supports, along with a hardware procurement list and revision history dated November 28, 2010.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Precision Products, Inc. Arrangement Model: Technical arrangement drawing/model from Precision Products, Inc. dated 11/30/2023. The document specifies pipe materials (PVC sizes), electrical components (Main Breaker, Pump Starters), and ventilation details for a piece of equipment.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Pre-Installation Checklist - Arrangement Model: A technical pre-installation checklist and proposed reinforcement chart dated 11/30/2023. The document outlines enclosure protection, foundation mitigation requirements, and electrical continuity/structural bearing specifications for equipment installation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Rittal AE1114.600 Exhaust Filter Layout Drawing: Technical layout drawing and specification sheet for a Rittal AE1114.600 Exhaust Filter and Control Panel AC140, dated 10/20/2023. Includes electrical specifications (460V, 60Hz), power ratings (6.4 kW), and component identifiers for supply fans and heat sinks.
DOC
DOC, High priority: read this first42 pages · rfp
HighAI Summary for Solicitation N40442-11-R-3000 - USNS LEWIS AND CLARK (T-AKE 1) Overhaul: Solicitation N40442-11-R-3000 for the Regular Overhaul/Dry-docking (ROH/DD) and alterations of the USNS LEWIS AND CLARK (T-AKE 1). The document includes Section B (Supplies or Services and Prices) with a detailed CLIN structure for overhaul services, additional work, man-hour rates, and material costs, as well as Section C (Descriptions and Specifications) outlining the general requirements for voyage repairs, planning, and quality assurance.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for T-1 Deck Drain System Check Valve Replacement (DWG 529-7488762): Technical drawing and specifications for the T-1 Deck Drain System check valve replacement, specifically referencing NAVSEA DWG 529-7488762. Revision A (dated 12/03/10) includes updates to check valves 143 and 145 (resized from 6 to 3 inches), removal of unnecessary pipe/valve callouts, and location descriptions for valves 127 and 130.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Typical Cable Tray Mounting Arrangement Layout: Technical drawing and specification document detailing the typical cable tray mounting arrangement. It includes welding requirements, dimensional tolerances, installation safety conditions, and a California Proposition 65 warning. The document is associated with a project funded by the U.S. Department of Energy under Contract No. DE-AC04-86RE27966.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Typical Cable Tray Mounting Arrangement Layout: Technical drawing and specification document detailing cable tray mounting arrangements, including dimensional tolerances, surface finish requirements, and scale (1:8). It serves as a technical reference for part assembly and installation.
DOC
DOC, High priority: read this first27 pages · specifications
HighAI Summary for USNS Lewis and Clark (T-AKE 1) Drydock Availability Specifications: Technical specifications for the USNS Lewis and Clark (T-AKE 1) drydock availability scheduled for April 11 to June 15, 2011, under RFP N40442-11-R-3000. The document includes a detailed work item index covering general requirements, hull structure, propulsion, electrical, communication, auxiliary machinery, habitability, HVAC, drydocking, and UNREP gear, with most items dated December 2010.
DOC
DOC, High priority: read this first4 pages · amendment
HighAI Summary for USNS LEWIS & CLARK - MDG #1 Cooler Casing Leak Repair (VR10-023) Amend 1: Amendment 1 to work item 205 for the USNS LEWIS & CLARK (T-AKE 1), dated December 16, 2010. The document provides a detailed statement of work for replacing the MDG #1 Charge Air Cooler casing, including requirements for OEM technical representatives, material specifications (CFM and GFM), cleaning and repair of coils, and hydrostatic testing. It includes specific safety warnings regarding high voltage systems and instructions for the disposal/repair of old components for shore-based spares.
DOC
DOC, High priority: read this first5 pages · sow
HighAI Summary for USNS LEWIS & CLARK - Repair Firemain Cutout Valves (VR10-043): Dated December 16, 2010, this document provides the technical specifications and statement of work for repairing 12 Firemain Cutout Valves (10 16-inch and 2 14-inch butterfly valves) on the USNS LEWIS & CLARK (T-AKE 1). It includes detailed material requirements for valve seats, installation instructions, electrical safety warnings, and specific hydrostatic testing and painting requirements.
PDF
PDF, High priority: read this first3 pages · specifications
HighAI Summary for VSD List - System Motor Specifications: Technical specification list for Variable Speed Drives (VSD), detailing system motor kW, amperage, and frame sizes for various ACS800 models and machinery units (M1, M2, M4, M5, M7, M8).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for YORK MARINE HVAC Arrangement Model - Piping Diagram #1: Technical drawing and piping diagram from York Marine AB detailing HVAC arrangement models. The document specifies that all dimensions must be in millimeters and includes references to foundation steps and piping diagrams.
PDF
PDF, Low priority7 pages · other
LowAI Summary for Enclosure 2.2.8 (8389536 Rev B): The document content consists of fragmented alphanumeric characters and coordinates that do not form coherent text, rendering the file unreadable or devoid of procurement-related information.
ZIP
ZIP
ZIP
ZIP
ZIP
ZIP
ZIP
ZIP
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
ZIP
ZIP
ZIP
ZIP
ZIP
ZIP
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
ZIP
ZIP
AI Contract Breakdown
Uniform Contract Format
Contract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
5 updates
PhaseAwarded
Posted
Presolicitation
Notice updated
Set-aside added: Total Small Business Set-Aside (FAR 19.5). The notice description changed.
Notice updated
The notice description changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Type Changed
Presolicitation → Solicitation
Awarded
Contract was awarded
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Organization & Contact Information
Show more
AgencyDepartment Of Defense → Military Sealift Flt Supp Command Norf
Government intends to award a firm fixed price contract for the Regular Overhaul (ROH) on the USNS LEWIS AND CLARK (T-AKE 1) commencing on/about 22 April 2011. Work to be performed at Contractor's facility on/about the above mentioned dates. Area of consideration is East Coast. Otherwise, succesful offeror must posses an Agreement for Boat Repair (ABR) with NAVSEA in order to recieve award. To request a copy of solicitation, email Julia Fulmer at contact@example.gov or fax a request to +1 (555) 000-0000. Estimate issue date for this Solicitation, is on/about 02 December 2010. After issuance, solicitation may be obtained by accessing the contracts section of the MSC website, http://www.msc.navy.mil NOTE: This pre solicitiation notice is changed to a total small business set a side in lieu of unrestricted