Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on June 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement

Closed
N5523626R0009Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333618
New
DIBBS
SENSOR, EXHAUST GAS, OXY
Solicitation # SPE7L5-27-T-0429
This fixed-price solicitation, issued by the Defense Logistics Agency (DLA) Weapons Support Land Supplier Operations Engines, is for the procurement of six units of exhaust gas oxygen emission control sensors, identified by NSN 2990-01-697-7963. These sensors are designated as critical application items and must conform to TDP Rev A Gen 3 and Basic Drawing NR 53711 8599721. The delivery period is 147 days after receipt of order, with a need ship date of April 6, 2027, and delivery to the DLA Distribution DDSP New Cumberland facility in Pennsylvania. Inspection and acceptance will occur at the destination. The contract imposes rigorous technical and quality standards, including compliance with DLA Master List requirements (RA001), tailored higher-level quality requirements (RQ001), and configuration change management (RQ002). Packaging and marking must adhere to MIL-STD-2073-1E and MIL-STD-129, with palletization following RP001. Due to the nature of the technical data, the contract is subject to ITAR and EAR export controls, requiring approved US/Canada Joint Certification Program certification. Additionally, the contractor must comply with CMMC Level 2 certification, DFARS safeguarding of covered defense information, and specific mercury containment standards per NAVSEA 5100-003D. Invoicing must be processed electronically through the Wide Area WorkFlow (WAWF) system.
DLA WEAPONS SUPPORT LAND SUPPLIER OPNS ENGINES

POSTED

about 18 hours ago

DEADLINE

in 11 days
NAICS: 333618
New
DIBBS
PUMP, COOLING SYSTEM, EN
Solicitation # SPE7L1-27-T-2965
Solicitation SPE7L1-27-T-2965, issued by the DLA Weapons Support Land Supply Chain, is for the procurement of engine cooling system pumps, specifically Cummins Inc. part number 6456335 and NSN 2930-01-663-4578. The requirement consists of multiple line items, each for a quantity of one unit, with a delivery window of five days after receipt of order. Delivery is FOB Origin, with inspection and acceptance occurring at the destination. Shipping must be executed via the fastest traceable means, and parcel post is strictly prohibited. Primary delivery locations include Fort Hood, Texas, and Fort Irwin, California, with required delivery dates extending into October and November 2026. The contract mandates strict adherence to technical and quality standards, including MIL-STD-129 for marking and MIL-STD-2073-1E for packaging. Palletization must comply with DLA packaging requirements RP001. Invoicing and payment are processed electronically through the Wide Area WorkFlow system. This is not a small business set-aside, though it is categorized under NAICS code 333618. Key regulatory compliance includes the Buy American Act, the Berry Amendment, and various FAR and DFARS clauses regarding cybersecurity, hazardous material labeling, and the prohibition of covered telecommunications equipment. Quotations must be submitted via the DLA Internet Bid Board System by November 9, 2026.
DLA WEAPONS SUPPORT LAND SUPPLY CHAIN

POSTED

about 18 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The U.S. Navy, through the Southwest Regional Maintenance Center in San Diego, California, is soliciting a sole-source procurement for the replacement of long lead time material for the ALCO Model 251C engine on the USS BOXER (LHD-4), with Fairbanks Morse Defense as the only designated source. This solicitation, issued under FAR Part 12 for commercial products and identified by solicitation number N5523626R009, is structured as a combined synopsis and solicitation with no intent to compete, leveraging authority under FAR 12.102. The required part is detailed in Attachment J-1, which has been updated via RFP Amendment 0001, and the procurement is classified under NAICS code 333618 for Other Engine Equipment Manufacturing. Responses are due by July 1, 2026, with the point of contact for inquiries being Mira Maje Brown and Kristin Liljestrom, both of whom can be reached via provided email and phone numbers. The contract will be executed without competition, and the government retains full discretion to determine the award based solely on the proposed solution from Fairbanks Morse Defense.

General Info

SWRMC seeks OEM ALCO Model 251C engine capability from small businesses, responses due May 8, 2026.

NAICS

333618 - Other Engine Equipment Manufacturing

Place of Performance

San Diego, CA, CA, 92136

Set-Aside

NONE

Documents

5

Attachment J-2: NAVSEA Clauses (N5523626R011)

PDF, High priority: read this firstspecifications
High

RFP N5523626R009 - USS BOXER Emergency Diesel Generator Engine

PDF, High priority: read this firstrfp
High

USS BOXER (LHD-4) Emergency Diesel Generator Assessment SOW

PDF, High priority: read this firstsow
High

USS BOXER (LHD-4) Emergency Diesel Generator Assessment SOW

PDF, High priority: read this firstsow
High

USS BOXER (LHD-4) Emergency Diesel Generator Replacement SOW

DOCX, High priority: read this first1 page · sow
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Type Changed

Sources Sought → Combined Synopsis

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Southwest Regional Maintenance Center
Contacts2 people available
OfficeSAN DIEGO, CA, 92136-5205, USA
Office AddressSAN DIEGO, CA, 92136-5205, USA

Full Description

Show more
RFP Amendment 0001 is hereby posted to update the Product Description (Attachment J-1), see attachment. This is a Combined Synopsis/Solicitation for commercial products prepared in accordance with the format in Part 12. This announcement constitutes the only solicitation. A proposal is being requested from only one source. Request for Proposal (RFP) N5523626R009 is issued as a sole source procurement. The subject solicitation is being processed in accordance with FAR Part 12. The Government intends to solicit and contract with only one source, Fairbanks Morse Defense (referred to herein a s Fairbanks Morse) for the part listed on the Product Description (Attachment J-1), under the authority of FAR 12.102 on a sole source basis. This notice of intent is not a request for competitive proposals. Determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. The applicable North American Industry Classification System (NAICS) code is 333618 ? Other Engine Equipment Manufacturing. This solicitation incorporates provisions and clauses by reference. The full text of FAR and DFAR references, provisions and clauses may be accessed at https://acquisition.gov. Please see the attachment, 26R0009__USS_Boxer_RFP_Syn_Sol for the full combined solicitation/synopsis notice for this requirement.

More opportunities from Department Of Defense → Southwest Regional Maintenance Center

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS