Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on April 24, 2013. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

USS EMORY S LAND Crane Drive Control System

Awarded
N32205-13-R-5002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract, solicitation number N32205-13-R-5002, involves the procurement of a Crane Drive Control System for the USS EMORY S LAND (AS 39) from the Original Equipment Manufacturer, Parker Hannifin Corporation. The project is necessitated by the failure of the existing Eurotherm model 620 Drive System, which is no longer supported by the OEM and lacks commercially available replacement parts. Because the 30 Ton crane is classified as critical ship equipment essential for US Navy Submarine sponsor mission support, replacing the failed system is vital to ensure the safety of the ship, crew, and environment. The selected solution is the Parker Hannifin model 890 Drive System, which is the OEM recommended drop-in replacement. This specific model was previously installed on the USS FRANK CABLE (AS 40), and implementing it on the USS EMORY S LAND will standardize the configuration across the ship class. This standardization is intended to reduce overall costs related to integration, training, maintenance, and logistics support while simplifying the integration of existing electrical and control system components. The contract was managed by the Military Sealift Fleet Support Command in Norfolk, Virginia.

General Info

Contract Value

$363,979.9

NAICS

334419 - Other Electronic Component Manufacturing

Place of Performance

Simbawang, Singapore, VA, SGP

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Sources Sought

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Military Sealift Flt Supp Command Norf
Contacts2 people available
OfficeNORFOLK, VA, 23511, USA
Office AddressNORFOLK, VA, 23511, USA
Contacts
Eddrian LoganContract Specialist
Clenton A. ShanksSupervisory Contract Specialist

Full Description

Show more
J&A - Parker Hannifin Corporation, SS Drives Division, is the Original Equipment Manufacturer (OEM) for both the existing Eurotherm model 620 Drive System onboard the USS EMORY S. LAND (AS 39) and the existing Parker Hannifin model 890 Drive System onboard the USS FRANK CABLE (AS 40). The existing 30 Ton crane is required for USN sponsor mission support, including US Navy Submarine sponsor support requirements. The required item is critical ship equipment in accordance with SMS procedure number 10.6-002-ALL, Identification of Critical Equipment, the failure of which poses a hazard to the ship, the crew and/or the environment. The current Eurotherm model 620 Drive System has failed, CASREP C3-12-001 applies, and system is no longer supported by the OEM, and replacement parts are no longer available commercially. The Parker Hannifin model 890 Drive System is the OEM recommended "drop-in" replacement system. NAVSEA previously upgraded USS FRANK CABLE (AS 40) to the Parker Hannifin model 890 Drive System prior to transfer of the vessel to MSC. Standardization of configuration in this ship class is required to minimize integration, training, maintenance, and logistics support costs. Standardization of equipment configuration will also minimize costs associated with the integration of existing crane electrical and control system components.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS