Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on March 16, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

USS JASON DUNHAM MK-32 SVTT

Closed
N50054-20-Q-0054Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 33661
Federal
Drydock Repairs USCGC HATCHET (WLIC-75309)
Solicitation # 70Z08527QIBCT0002
Solicitation 70Z08527QIBCT0002 is a total small business set-aside for an Indefinite Delivery - Requirements Contract under FAR Part 12 to provide drydock repairs for the USCGC HATCHET (WLIC 75D), a 75-foot inland construction tender homeported in Galveston, Texas, and the USCG 68B Barge. The work will be performed at the contractor's facility over a projected 70-day period from March 9, 2027, to May 19, 2027. The comprehensive scope of work includes 88 detailed items such as hull plating inspection and renewal, propulsion shafting overhaul, tank cleaning and preservation, and structural repairs. All work must adhere to SFLC Standard Specifications and other referenced military and industry standards, including MIL-STD-2191 and ASTM F992. Quotations are due by November 9, 2026, at 11:00 am PST and must remain valid for 120 days. Award will be granted to the responsible vendor offering the lowest evaluated price among those rated acceptable for non-price factors, which include a demonstration of technical capability and a satisfactory past performance record on at least three relevant contracts completed within the last three years. The government will evaluate the total price, lay day rates, and a composite labor rate, which was corrected via Amendment A0001 to 750 hours. Invoicing is processed through the Invoice Processing Platform or MarkView, with a general requirement that CLINs reach 25 percent completion before they can be invoiced.
CG-SEA-C22

POSTED

11 days ago

DEADLINE

in 20 days

General Info

Contract Value

$137,468.43

NAICS

33661

Place of Performance

Norfolk, VA, 23511, USA

Set-Aside

LAS

Award Issued Date

Documents

4

Annodize_Passivate+List.xlsx

XLSX

GFP+Module+USS+Jason+Dunham.xlsx

XLSX

Incidental+List+Jason+Dunham.xlsx

XLSX

SOW+C287+MK+32+SVTT+JASON+DUNHAM+rev2.doc

DOC

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Mid Atlantic Reg Maintenance Ctr
Contacts2 people available
OfficeNORFOLK, VA, 23511-2124, USA
Office AddressNORFOLK, VA, 23511-2124, USA

Full Description

Show more
SHORT TITLE: USS JASON DUNHAM (DDG-109) MK 32 SVTT RAC PIERSIDE REFURBISHMENT SUPPORT. 1. PERIOD OF PERFORMANCE: Start Date: 6/1/20 Completion Date: 5/31/21 2. PLACE(S) OF PERFORMANCE: a. Contractor's Facilities b. MARMC and Naval Station Norfolk c. BAE d. USS JASON DUNHAM (DDG-109) 3. DESCRIPTION OF TASK: The contractor shall provide technical and engineering services to Mid-Atlantic Regional Maintenance Center (MARMC), Code 287. 3.1 The contractor shall provide technical support personnel, and material and services to refurbish two MK-32 SVTT Torpedo Tube mounts, one Torpedo Loading Tray and two HP air charging hoses currently on USS Jason Dunham (DDG 109). 3.1.1 The contractor shall conduct MK-32 SVTT pre-testing IAW applicable MIP/MRC, recording all conditions found. The contractor shall report all conditions found to the SME. 3.2 The contractor shall prepare (this will include disconnecting of all power sources and terminate disconnected cables to protect them from the elements), remove from the ship, transport to the contractor's facility and return to the ship and support post testing for two MK-32 SVTT mounts, one Torpedo Loading Tray and two air charging hoses. 3.2.1 Contractor shall install government furnished deck covers and secure with a minimum of six bolts in each cover. 3.2 2 During reinstallation and posttest, the contractor shall verify proper operation of MK-32 Torpedo Tube mounts and conduct post-testing IAW applicable MIP/MRC. The contractor shall record all test results and provide one copy to the SME. Post testing shall be witnessed by the SME and Ships Force. Ships Force acceptance signature is required by E-7 or above. 3.2.3 The contractor shall troubleshoot and restore all operational discrepancies noted during post testing until a 100 percent successful operation is achieved. NOTE: Ships Force is responsible to ensure fire control inputs and flask charging systems are proper and functional, including charging system pressure testing certifications and calibrations. 3.3 The contractor shall disassemble, assess, repair/restore and reassemble two MK-32 SVTT Torpedo Tube mounts, one Torpedo Tube Loading Tray and two HP air charging hoses IAW applicable paragraph 4.1 references. Annotate all conditions found and provide a completed copy to the SME. 3.3.1 The contractor shall provide the SME 24-hour notice of government checkpoint requirements as identified in paragraph 4.1 (a). If the government does not arrive in time to support the checkpoint the contractor shall continue with work as planned and advise the SME of the results. 3.4 The contractor shall paint the MK-32 SVTT launchers and Torpedo Loading IAW paragraph 4.1 (b). Paint thickness will be determined by use of NIST 2735A-18 MIL Gauge. 3.5 The contractor shall remove existing and install new government provided PCMS tiles/material as required IAW paragraph 4.1 (c, d). 3.6 The contractor shall inspect all quadrants, repair and resurface as required by MARMC, accomplish IAW paragraph 4.1 (e). The contractor shall run a bore gauge through each torpedo barrel after completion of work IAW paragraph 4.1 (f), a bore gauge test is required after completion of quadrant work IAW paragraph 4.1 (e). 3.6.1 If the quadrant(s) are resurfaced the contractor will paint quadrants to a Wet Film thickness of 8-10 mils, wet sand with 400 grit to achieve finial paint thickness. 3.7 The contractor shall hydro, drop test, and fire the torpedo breeches after completion of work IAW paragraph 4.1 (g, h) as required, the contractor shall refurbish and hydro charging hoses IAW paragraph 4.1 (g) as required. 3.8. The contractor (as directed by MARMC) shall Anodize / Passivate parts identified (by MARMC) in 4.1 (i) as directed by the government IAW drawings provided in paragraph 4.1 (j) using paragraph 4.1 (k) for guidance. 3.9 The contractor shall provide machine services to finish Manifolds (6 pcs) (as needed) delivered with minor incomplete aspects resulting from manufacturing process to bring into compliance with paragraph 4.1 (l). 3.10 The contractor shall drill and ream dowel pin holes when installing new Stationary Bases IAW paragraph 4.1 (m) if required. 3.11 The contractor shall provide welding service as required to support overhaul of the MK-32 SVTT. Level of effort estimated to be 16 hours. 3.12 The contractor shall order the items listed in paragraph 4.1 (n) Incidental Parts List 4. GOVERNMENT FURNISHED INFORMATION/EQUIPMENT/MATERIAL: 4.1 GOVERNMENT FURNISHED INFORMATION (GFI): (a) SVTT MK 32 Evaluation and Procedures (b) NAVSEA PPG Protective and Marine Coatings PSX700SG (c) NAVSEA Standard Item 009-78, PCMS tile procedures (d) NAVSEA PCMS REPAIR/INSTALLATION METHODS RIM 05T1-99 (e) EATP 18-0087 MK-32 Overhaul Manual (f) NAVSEA OD 46508 CHNG 21 DEC 1988 Workshop Equip Use and Maintenance for SVTT (g) MIP 7511 (S-1, 36M-1 and others as required) (h) NUWC-NPT Technical Document 11,282 1 July 2007 Field Repair Breech Mechanisms (i) Parts to be Anodized / Passivate (j) Surface Vessel Torpedo Tube Master Drawing package 18228001 (16 AUG 2018) (k) MIL'A8625 Type II Class 1 (Anodize) (l) Drawing 63302761 (Manifold) (m) Drawing 3246065 (Stationary Base) (n) Incidental Parts List General References: () NAVSEA TM SW395-AJ-MMO-010 REV1 (Loading Tray Manual) () SVTT IETM Volume ID N6660400045 () NUWC-NPT Technical Document 11,428 1 July 2005 Breech Mechanism INSP/Air Flask () NUWC-NPT Technical Document 10,910D 15 Jan 2009 SVTT Breech Gauge/Switch Cal () NAVSEA STANDARD ITEM 009-32 FY-21, CLEANING AND PAINTING 4.2 GOVERNMENT FURNISHED EQUIPMENT (GFE): a. Torpedo Setting Panel (used for post overhaul test) b. Bore gauge and associated equipment (used IAW Ref 4.1 (f)) c. Breech firing valve removal tool 4.3 GOVERNMENT FURNISHED MATERIAL (GFM): a. MK-32 SVTT Repair Parts b. SVTT Deck Covers (as applicable) c. PCMS Material d. Bore Gauge (as required) e. Manifolds (6 pcs) 5. CONTRACTOR FURNISHED EQUIPMENT/MATERIAL/TRANSPORTATION: 5.1 CONTRACTOR FURNISHED EQUIPMENT (CFE): a. General-purpose hand tools are considered normal tools of the trade and are to be provided by the contractor. b. High pressure air compressor c. Calibrated paint thickness gauge in accordance with Ref 4.1 (b) d. Standard warehouse equipment capable of moving equipment the size and weight of MK 32 SVTT and associated equipment outlined in paragraph 4.1. 5.2 CONTRACTOR FURNISHED MATERIAL (CFM): a. Consumables, tools and materials required to support task. Contractor shall provide material that is not available through the Federal Supply System, i.e. miscellaneous parts, tools and hardware. 5.3 CONTRACTOR FURNISHED TRANSPORTATION (CFT): a. Contractor to move material identified in this PWS from USS Jason Dunham (DDG 109) to the contractor's facilities and back as directed by the SME. 6. TRAVEL: Travel is not authorized. 7. SECURITY: The highest level of security required for this Contract is UNCLASSIFIED. Personnel performing classified work or requiring access to classified material or spaces under this task order shall possess both a DOD security clearance at the appropriate (or higher) level and the need to know. 8. OTHER REQUIREMENTS: 8.1 The contractor shall comply with any and all applicable NAVSEA Standard Items in the execution of this task order. 9. SUBJECT MATTER EXPERT (SME): 9.1 SME: Gregory L. Smith, MARMC C287, (757) 400-0942, gregory.l.smith@navy.mil

More opportunities from Department Of Defense → Mid Atlantic Reg Maintenance Ctr

Same awarding agency

NAICS: 332321
New
Federal
Watertight Hatch
Solicitation # N5005427Q0012
Solicitation N5005427Q0012 is a combined synopsis and solicitation issued by the Mid-Atlantic Regional Maintenance Center (MARMC) for the procurement of a new quick acting watertight hatch and coaming assembly for the USS Arlington. This is a total small business set-aside under NAICS code 332321, utilizing Simplified Acquisition Procedures in accordance with FAR Part 13. The required item must be new, as refurbished or used parts are strictly prohibited, and must comply with drawing 167-7317993 REV C and work specification items 168-11-001. Delivery is required by October 10, 2027, with shipping terms set as FOB Destination to DLA Distribution Norfolk RMC PROJ in Norfolk, Virginia. The government will award the contract based on a best value determination, evaluating quotes based on technical capability and price. To be eligible for award, offerors must receive an acceptable technical rating. Submissions must include a detailed unpriced technical quote, a capabilities statement, and lead time for the parts. Responses are due by 4:15 PM on October 27, 2026, and should be emailed to Ariana Seawell. This procurement incorporates specific DFARS requirements for cybersecurity and item unique identification, and requires Joint Certification Program (JCP) certification for accessing technical data. Funding is currently contingent upon the availability of appropriated funds.
Metal Window and Door Manufacturing

POSTED

about 8 hours ago

DEADLINE

in 7 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS