UST Decommissioning & Demolition

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

562910 - Remediation Services

Place of Performance

34000, WY, USA

Set-Aside

SBA

Documents

This scope was carved out of 1240LT27Q0012.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Nelson Drive Fuel Tank Removal

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Intermountain 8 Usda-Fs
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs the decommissioning and removal of underground storage tanks (USTs) and associated infrastructure for prime contractors on USDA Forest Service projects. Removes water/sewer lines, valves, and utility boxes; demolishes asphalt paving and concrete; and salvages specific equipment like chlorinators. Requires UST removal certification and demolition equipment. Delivers a cleared site with removed tanks and demolished structures.

Similar Contracts

Same NAICS industry code

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was initiated following a sprinkler system failure that caused significant water damage. The scope of work requires the remediation of all visible and exposed interior building components and the cleaning or replacement of damaged theater seating cushions. All activities must adhere to ANSI/IICRC S520 standards, EPA guidelines, and OSHA regulations, with a specific requirement to achieve interior humidity levels of 50 percent or less. Key deliverables include the provision of a Certified Industrial Hygienist to verify materials and perform final clearance, a detailed mold remediation plan involving HEPA filtration and negative air pressure, and a final written report of findings. This is a single lump sum contract set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Award decisions are based on best value, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must provide a valid Indiana Contractor's License, proof of automobile and workers compensation insurance, and certification of compliance with Davis Bacon Act wage rates. The contractor must start work within 14 days of the Notice to Proceed and provide a sequenced construction schedule within 10 days. Payment is issued on Net 30 terms, and the Atterbury Job Corps Center is tax-exempt. Proposals must include a detailed cost breakdown, a timeline for substantial completion, and a 90-day bid guarantee.
Atterbury Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 16 days
View Details
NAICS: 562910
New
Maui JCC Mold Remediation and Removal of Water-Damaged Materials
Solicitation # maui-jcc-mold-remediation-removal-water-damaged-materials
Management & Training Corporation (MTC), acting as the operator for the U.S. Department of Labor, is soliciting bids for a fixed-price, single lump sum contract for mold remediation and removal of water-damaged materials at the Maui Job Corps Center in Makawao, Hawaii. The project focuses on Building 11, specifically the cafeteria, food service areas, restrooms, and adjoining spaces, following severe windstorm damage. The scope of work includes the removal of mold-affected porous materials such as drywall and ceiling tiles, the establishment of containment using HEPA-filtered negative air pressure to protect adjacent areas, and the remediation of structural surfaces in accordance with EPA guidance. The estimated price range for the project is between $25,000 and $100,000. Bids will be evaluated based on overall best value, and a physical site visit is mandatory prior to submission. For bids of $25,000 or more, contractors must provide a bid bond guarantee equal to 20% of the base bid, and the awarded contractor will be required to provide performance and payment bonds from a surety company with at least an A- rating. Compliance with the Davis-Bacon Act and specific Hawaii wage determinations is required. Payment is based on a Schedule of Values using AIA documents, with a 10% retainage withheld until substantial completion. This opportunity is set aside for various small business categories, including VOSB, SDVOSB, WOSB, and HUBZone certified firms.
Management & Training Corporation/Hawaii/Maui Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in about 5 hours
View Details
NAICS: 562910
New
Federal
Y--GCI Pollyanna #2 Acid Mine Drainage Remediation Pr
Solicitation # 140S0326R0001
The GCI Pollyanna #2 Acid Mine Drainage Remediation Project is a firm fixed price construction effort issued by the Department of the Interior's Office of Surface Mining Reclamation and Enforcement. Located in Latimer County, Oklahoma, the project involves the construction of a multi-stage passive acid mine drainage treatment system, including the installation of limestone channels, flow spreaders, an underdrain manifold, a settling and oxidation pond, and a transfer channel. Key work items include mobilization, clearing and grubbing of three acres, the placement of 7,000 to 9,000 cubic yards of fill, and the application of 3,000 to 4,000 tons of high calcium limestone. The project magnitude is estimated between $1 million and $5 million, with a period of performance from January 19, 2027, to January 18, 2028. This procurement is a 100 percent small business set-aside under NAICS code 562910. The government will make a single award based on best value, prioritizing technical approach and past performance over price. Bidders must comply with the Davis-Bacon Act and provide performance and payment bonds of 100 percent for construction costs exceeding $150,000. Proposals are due by November 6, 2026, and must be submitted in three volumes covering administrative requirements, technical approach and past performance, and pricing. Awarded contractors must commence work within one day of the notice to proceed and are subject to liquidated damages of $1,500 per calendar day for delays beyond the 325-calendar-day completion window.
DOI Osmre (co)

POSTED

about 7 hours ago

DEADLINE

in 14 days
View Details

More opportunities from Department Of Agriculture → Csa Intermountain 8 Usda-Fs

Same awarding agency

NAICS: 237120
New
Federal
Nelson Drive Fuel Tank Removal
Solicitation # 1240LT27Q0012
Solicitation 1240LT27Q0012 is a firm fixed price contract issued by the USDA Forest Service for the removal of two 300-gallon steel underground fuel storage tanks at the Nelson Drive housing complex on the Bridger-Teton National Forest in Wyoming. The scope of work includes the extraction and disposal of the tanks, the cleanup and disposal of contaminated soils, and potential surface restoration. The contractor is required to field verify all existing conditions before ordering products and must adhere to OSHA standards for excavation and shoring, as well as IDEQ and government regulations for waste hauling and disposal. The estimated period of performance is from June 1, 2027, to June 30, 2027. This project is a total small business set-aside under NAICS code 237120. Award will be made based on the lowest price technically acceptable (LPTA) criteria, evaluating technical capability through an experience questionnaire, a project-specific quality control plan, and a review of past performance. Required submissions include a technical narrative detailing the approach to tank removal and soil remediation, as well as the qualifications of key personnel. The contract mandates performance and payment bonds and compliance with the Davis-Bacon Act for wage requirements. Quotes were due by November 13, 2026, with a requirement to hold pricing firm for 90 calendar days.
Oil and Gas Pipeline and Related Structures Construction

POSTED

about 7 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237310
New
Federal
Administrative Parking Lot Repairs
Solicitation # 1240LT27Q0019
Solicitation 1240LT27Q0019 is a firm fixed price request for quotation issued by the USDA Forest Service for the repair and resurfacing of three administrative parking lots located at the Boulder Ranger District Office, Clear Creek Ranger District Office, and the Fort Collins Administrative Site within the Arapaho and Roosevelt National Forest and Pawnee National Grassland. The scope of work includes cleaning surfaces, asphalt crack and joint sealing, infrared pavement patching, seal coating, and re-striping. All work must adhere to the Forest Service Supplementary Specifications and Federal Highways Standard Specifications FP-24. The project magnitude is estimated between $25,000 and $100,000, with a performance window from June 15, 2027, to August 15, 2027, requiring completion within one week at each site. This procurement is a 100% Total Small Business Set-Aside under NAICS code 237310. Award will be based on best value, evaluating both price and a technical approach that includes a 1 to 3 page execution narrative and a construction schedule. Quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 23, 2026, at 14:00 EST. Required submission documents include the SF-1442, a technical approach narrative, and pricing provided specifically in the provided Excel Schedule of Items. Key compliance requirements include the Buy American-Construction Materials clause and electronic payment via the System for Award Management.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS