Utilities Privatization - McConnell AFB, KS

Active
SP0600-11-R-0807Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the potential privatization of the electric distribution system, potable water distribution system, and wastewater collection system at McConnell Air Force Base in Wichita, Kansas. The contractor will assume ownership of these utility systems, taking full responsibility for their operation, maintenance, repair, upgrades, and overall management while providing uninterrupted utility services to the Government. The solicitation number has been updated to SPE600-13-R-0806, and the procurement process is currently in the market research phase to gauge industry interest and capabilities. Interested firms are required to submit statements of interest detailing their experience, financial capability, business size, and a primary contact by the specified deadline. This effort may include opportunities for small and disadvantaged business set-asides, and a formal solicitation could be issued if sufficient market interest is identified. McConnell AFB's electric system consists of extensive underground circuits, poles, transformers, and associated infrastructure, with power sourced from Westar Energy. The water distribution system includes pipes of various vintages, storage tanks, fire hydrants, valves, and other equipment, treating water delivered from the City of Wichita before distribution across the base. The wastewater collection system is solely a collection network that conveys wastewater to the city treatment facilities and includes pipes, manholes, lift stations, and a generator. The privatization initiative is governed by federal statute (10 U.S.C. §2688) and aims to transfer ownership rights of these utility systems to an eligible municipal, private, or cooperative utility provider, under terms that ensure the continued provision and enhancement of utility services at the base.

General Info

Privatization of McConnell AFB utilities, contractor assumes operation, maintenance, and ownership responsibilities.

Agency

N/A

NAICS

221122 - Electric Power Distribution

Place of Performance

McConnell Air Force Base, WICHITA, KS, 67221, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseSources Sought
Posted

Sources Sought

Notice updated

The response deadline was removed. The notice description changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Dale G. StephensContract Specialist
Jose JimenezContracting Officer

Full Description

Show more
The solicitation number for the privatization of the Electric System, Water Distribution System, and Water Collection System at McConnell AFB, KS has changed. The new solictation number is SPE600-13-R-0806. All pertinent information regarding this procurement will be posted under the new solicitation number. The contractor will be required to assume ownership of the utility system(s) at McConnell AFB and as the new system(s) owner shall operate and maintain the system(s) and provide utility services to the Government. Contractor shall furnish all necessary labor, management, supervision, permits, equipment, supplies, materials, transportation, and any other incidental items or services required for the complete ownership of and provision of utility services via these utility systems, including operation, maintenance, repair, upgrades, and improvements to the utility system(s). This Sources Sought Notice (hereinafter "Notice") is an essential step in determining market interest and feasibility. Responses received will be used to develop marketing strategies for the potential privatization of utilities at this installation. Should interest be determined sufficient, a formal solicitation may be forthcoming. Interested parties should provide a statement of interest on company letterhead no later than 4:00 pm on Tuesday, July 5, 2011. Responses are preferred via e-mail, but hard copies and facsimiles will also be accepted. At a minimum, the statement of interest shall address: (1) capability and experience in utility privatization or owning and operating electric, water, or wastewater utility systems; (2) financial capability to justify potential award of such a contract; (3) a primary point of contact, including phone number and e-mail address; and (4) an indication of the size of the business (large, small, or any sub-category of small business). The potential opportunity for set-asides for small businesses and small disadvantaged businesses will be considered on the basis of the responses received. This Notice is solely for the Government's use as a market research tool. As such, the issuance of a competitive solicitation is not guaranteed. If determined appropriate, then both a synopsis and a solicitation may be anticipated in the August 2011 timeframe. All responsible sources are encouraged to submit a response to this Notice. All information received will be considered. Failure to respond to this Notice does not preclude a firm from offering on any resultant solicitation; however, a lack of interest in this requirement may keep this effort from moving forward competitively. This announcement shall not be construed as a commitment or authorization to incur costs in anticipation of an award. The Government is not bound to make any awards under this Notice. If you are interested in this project, please provide the information requested above to the DLA Energy Contracting Office. Installation Description McConnell Air Force Base (AFB) is located six miles southeast of downtown Wichita, Kansas, in unincorporated Sedgwick County. Topeka, the state capital, is 140 miles northeast of the installation and Oklahoma City, Oklahoma, is 162 miles south of McConnell AFB. Interstate 35 provides a by-pass route east around Wichita, bordering McConnell AFB to the west and north. Rock Road runs north/south through the base and separates the main base from the housing area. McConnell Electric Distribution System: McConnell AFB receives electric power from Westar Energy at 12.47 kV at three separate service locations. The distribution system consists of approximately 526,795 single conductor linear feet (SCLF) of underground circuits (1986 - 2010 vintage). Also included are approximately 377,525 SCLF of street lighting wire, 570 steel/aluminum poles, 31 wood poles, 216 precast concrete manholes (1986 - 2010 vintage), 298 three-phase pad-mounted transformers ranging from 15 to 2000 kVA (1991 to 2010 vintage), 50 single-phase pad-mounted transformers ranging from 10 to 75 kVA (2003 to 2010 vintage), and 21 single-phase pole-mounted transformers ranging from 5 to 150 kVA (1991 to 1994 vintage). McConnell Potable Water Distribution System: The water utility system was originally constructed in the early 1950s. Water from the City of Wichita lines goes to the Base water treatment plant, where it is chlorinated and fluoridated. After treatment, water is pumped into a 1 million gallon ground storage tank and a 1 million gallon elevated storage tank. The distribution system consists of approximately 4,579 LF of asbestos pipe (1952 to 1963 vintage), 62,972 LF of steel pipe (1952 to 2008 vintage), and 122,628 LF of PVC pipe (1981 to 2010 vintage). Also included are approximately 230 fire hydrants (1980 to 2005 vintage), 5 post indicator valves (1988 to 2000 vintage), 424 gate/ball valves (1952 to 2010 vintage), and 12 backflow preventers (2002 to 2008 vintage). McConnell Wastewater Collection System: The wastewater system is a collection system only; there are no treatment facilities on base. Wastewater is pumped to the City of Wichita's system for treatment and ultimate disposal. The largest force main on the base is used to convey wastewater from the main pumping station, Building 1151, to the City's system. Construction of the main lift station was completed in 2006. The collection system consists of approximately 149,682 LF of PVC pipe (1955 to 2007 vintage) and 697 LF of vitrified clay pipe (1946 vintage). Also included are approximately 255 precast concrete manholes (1995 to 2009 vintage), 122 brick manholes (1946 vintage), 16 lift stations (1988 to 2008 vintage), and 1 generator. Additional installation information may be located at: http://www.mcconnell.af.mil/ Description The DLA Energy Energy Enterprise Business Unit seeks to identify and obtain information from responsible sources in connection with the privatization of the electric distribution system (NAICS 221122), the water distribution system (NAICS 221310), and the wastewater collection system (NAICS 221320) at McConnell Air Force Base (AFB), KS. Privatization is defined as the conveyance of a utility system to a municipal, private, regional, district, or cooperative utility company or other entity. The conveyance may consist of all right, title, and interest of the United States in the utility system. Utility Privatization (UP) will be accomplished in accordance with 10 U.S.C. - 2688 - Utility Systems: Conveyance Authority.

Similar Contracts

Same NAICS industry code

NAICS: 221122
New
SLED
FIRM ELECTRICITY SUPPLY SERVICES
Solicitation # 3162-27
The New Hampshire Department of Administrative Services is soliciting bids under RFB 3162-27 for a certified Competitive Electric Power Supplier to provide firm electricity supply services. The procurement follows a two-phase evaluation process where bidders are first assessed on qualification criteria—including quality, reliability, and coordination of service per RSA 21-I:17-b—and subsequently evaluated on pricing for those who qualify. The contract is for a firm fixed, full-requirements supply with an estimated start date of November 1, 2026, and pricing requests cover 12, 24, and 36-month terms. One specific account group, PG1 Eversource Group 2, has an estimated annual usage of 6,775,357 kWh. The successful vendor must be registered to conduct business in New Hampshire, be in good standing with the Secretary of State, and maintain certification with the New Hampshire Public Utilities Commission. Compliance with NEPOOL, ISO New England, and Local Distribution Company requirements is mandatory. Administrative terms include payment via ACH or Procurement Card within 30 days of invoice receipt, with single billing by the LDC being acceptable. The agreement is governed by Chapter Adm 600 Procurement and Property Rules and NH RSA Chapter 91-A. Bids are due by October 27, 2026, and must be submitted electronically to the Bureau of Purchase and Property.
Department Of Administrative Services

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 221122
New
Federal
36-Month Electrical Distribution Testing
Solicitation # 36C24727Q0044
Solicitation 36C24727Q0044 is a firm-fixed-price requirement issued by the Department of Veterans Affairs Network Contracting Office 7 for the inspection, testing, adjustment, calibration, preventive maintenance, and infrared thermographic scanning of electrical distribution equipment. This total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) covers three Georgia locations: the Joseph Maxwell Cleland Atlanta VA Medical Center, the Fort McPherson VA Clinic, and the Trinka-Davis Veterans Village Clinic. The scope includes a wide array of assets such as distribution panelboards, transformers, switchboards, and automatic transfer switches, with all work required to adhere to ANSI/NETA MTS, NFPA 99, NFPA 110, and OSHA standards. The project is a single, non-recurring action requiring all field work to be completed within 240 calendar days of the Notice to Proceed, with a final consolidated report due within 270 days. Award will be determined using the Lowest Price Technically Acceptable (LPTA) process. To be deemed technically acceptable, offerors must demonstrate at least five years of experience in healthcare or industrial facilities and provide certified technicians, including a Level II certified thermographer. Companies must either be NETA Accredited or provide an objective equivalent, including a documented quality-assurance program and test instruments calibrated within the last 12 months. Key deliverables include a proposed work schedule and phasing plan due within 14 days of the Notice to Proceed, the application of durable adhesive test labels to all serviced assets, and detailed engineering service reports. The scope specifically excludes arc-flash labeling, study-level engineering, and internal UPS service.
247-NETWORK Contract Office 7 (36C247)

POSTED

1 day ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS