Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from New York was posted on October 23, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Utility Conflict Resolution

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

This contract involves the identification, relocation, or protection of existing underground utilities such as water, sewer, electrical, and telecommunications lines during construction activities across all counties in New York State. The work is essential to prevent damage to critical infrastructure and ensure the safety and continuity of public services throughout project implementation. Contractors must be prepared to survey, mark, andCoordinate with utility owners and public agencies to manage conflicts arising from planned construction, with a focus on accuracy, timely response, and compliance with state and local regulations. The opportunity is structured as a subcontract for a project managed by the Buffalo Urban Development Corporation and was posted on October 23, 2025, with responses due no later than November 17, 2025. The North American Industry Classification System code 237110 identifies the work as underground utility construction, indicating the need for specialized expertise in subsurface utility engineering and construction coordination. Performance is required across the entire state of New York, and interested parties must be capable of mobilizing resources regionally, adhering to all applicable safety and operational standards. The contract does not specify a set-aside designation, meaning it is open to all eligible subcontractors regardless of business size or ownership structure.

General Info

Subcontract for underground utility detection and protection across New York State, due November 17, 2025.

Documents

This scope was carved out of N/A.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Temporary Intersection Redesign and Installation

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
  • Lift Station No. 85 ReplacementOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNew York → Buffalo Urban Development Corporation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Identification, relocation, or protection of existing underground utilities including water, sewer, electrical, and telecom lines during construction.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS