This Subcontract opportunity from Connecticut was posted on April 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Utility Connections and Site Modifications
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract covers the installation or modification of electrical, fuel, water, and drainage utility systems to support airside improvements at a facility managed by the Connecticut Airport Authority. Work must be carefully coordinated to avoid disruption or interference with existing infrastructure, ensuring continuity of operations during construction. All activities are scoped to enhance site functionality while maintaining safety and compliance with applicable standards for airside environments. Subcontractors are required to respond by July 15, 2026, with the solicitation posted on April 30, 2026. The North American Industry Classification System code 238210 identifies this as an electrical and other utility systems installation contract. The place of performance and detailed location information are not specified in the data, but the work is tied to airport operations under Connecticut Airport Authority oversight. No set-aside provisions or organizational type restrictions are indicated, and all bids must be submitted through the designated portal linked in the contract notice.
General Info
Place of Performance
CT, USASet-Aside
Documents
This scope was carved out of 2026-008.
The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.
Airside Development - GON
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- 26-140 Installation of Emergency Shut Off SwitchesOpen now, due in 3 days
- Emergency/Exit Lighting – Mechanical/Electrical Rooms ProjectOpen now, due in 18 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
