Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Utility Construction (Water Main & Hydrant Installation)

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for utility construction involves the installation of fire hydrants for prime contractors on Los Angeles Department of Water and Power projects. The scope of work includes performing open-trench excavation, connecting hydrants to existing water mains, and ensuring the hydrant assembly is installed according to Installation Exhibit F-86320 within the Caltrans Right-of-Way. The final deliverable is a fully operational fire hydrant. To qualify for this work in Los Angeles, contractors must hold either a C-42 Plumbing or A-General Engineering license and maintain full compliance with Caltrans encroachment permits. The project falls under NAICS code 237110 and was posted on September 22, 2025.

General Info

Subcontract for fire hydrant installation on LADWP projects requiring C-42 or A-General licenses.

Agency

California Los Angeles Department of Water and Power

Place of Performance

Los Angeles, CA, 91303

Set-Aside

NONE

Documents

This scope was carved out of Fire Hydrant Installation at 6850 Topanga Canyon Blvd Project.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom Fire Hydrant Installation at 6850 Topanga Canyon Blvd Project
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Los Angeles Department of Water and Power
ContactsNo contacts available
OfficeN/A
Organization / Agency
California Los Angeles Department of Water and Power
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs fire hydrant installation for prime contractors on Los Angeles Department of Water and Power (LADWP) projects. Conducts open-trench excavation, connects the hydrant to the existing water main, and installs the hydrant assembly per Installation Exhibit # F-86320 within the Caltrans Right-of-Way. Requires C-42 Plumbing or A-General Engineering license and Caltrans encroachment permit compliance. Delivers an operational fire hydrant.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 16 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS