Utility Relocation for ALDOT Project No. DEMOF-RPF-NHF-PRF-A210(943) Woolsey Finnell Bridge Replacement and Approach on SR-6 (US-82) over the Black Warrior River

Active
92225699State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Tuscaloosa is seeking sealed bid proposals for the utility relocation associated with the Woolsey Finnell Bridge Replacement and Approach on SR-6 over the Black Warrior River. The project scope involves extensive water and sanitary sewer work, including thousands of linear feet of water main, gravity sewer main, and force main installations, as well as jack and bore operations, manhole construction, and asphalt patching. Interested general contractors must attend a mandatory pre-bid conference on September 9, 2026, at 2:00 p.m. at City Hall to be eligible to bid. Sealed proposals are due by September 16, 2026, at 2:00 p.m. local time. The contract is expected to be awarded within sixty calendar days following the bid opening. Project documents are available through Hazen and Sawyer or via Central Bidding.

General Info

City of Tuscaloosa seeks bids for Woolsey Finnell Bridge utility relocation project.

Agency

Alabama → Hazen and SawyerView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

1490 North Bank Parkway, Suite 240, Tuscaloosa, AL, 35406, USA

Set-Aside

NONE

Documents

(2)

Woolsey Finnell Submittal Plans to Bid - Sealed.pdf

HTML

Woosley Finnell Submittal Specs to Bid - Sealed.pdf

HTML

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyAlabama → Hazen and Sawyer
Contacts1 person available
OfficeTuscaloosa, AL, 35406, USA
Organization / Agency
Alabama → Hazen and Sawyer
View Agency Profile
Office AddressTuscaloosa, AL, 35406, USA
Contacts

Full Description

Show more
CITY OF TUSCALOOSA ADVERTISEMENT FOR BIDS                                     Project Name: Utility Relocation for ALDOT Project No. DEMOF-RPF-NHF-PRF-A210(943) Woolsey Finnell Bridge Replacement and Approach on SR-6 (US-82) over the Black Warrior River, City of Tuscaloosa, Alabama File Number:OCA-25-1145    Engineering Project Number: 2024.729.001   Sealed Bid Proposals will be received by the City of Tuscaloosa, at the Council Chamber of City   Hall, 2201 University Boulevard, on September 16, 2026, at 2:00 p.m., local time for this project, at which time bids will be opened and read.   Pre-Bid Conference: Attendance at the MANDATORY Pre-Bid Conference is required in order for a General Contractor to submit a bid on this Project. The Pre-Bid Conference will be held at the Council Chamber of City Hall, 2201 University Boulevard, on September 9, 2026, at 2:00 p.m., local time. Parking and Entry to City Hall: Free visitor parking is provided in the Intermodal Facility (parking deck) at 2230 7th Street. Access City Hall through the 4th-floor skywalk entrance to Security.   Project Scope: Utility relocation of existing water and sanitary sewer including approximately 4,238 linear feet of water main (2-inch to 36-inch), 292 linear feet of water main flex ring (24-inch), 2,557 linear feet of water main carrier pipe (8-inch to 36-inch), 1,920 linear feet of water main jack and bore (16-inch to 48-inch encasement), 146 linear feet of water main open cut (30-inch encasement), 11 valves, control valve assembly, 774 linear feet of gravity sewer main (8-inch to 18-inch), 264 linear feet of sewer force main (16-inch), 324 linear feet of gravity sewer pipe flex ring (18-inch), 978 linear feet of sewer main carrier pipe (8-inch to 18-inch), 867 linear feet of sewer main jack and bore (16-inch to 30-inch encasement), 131 vertical linear feet of precast concrete manhole (48-inch), 220 square yards of asphalt patching, pipe bridge, wastewater flow control, landscaping, and miscellaneous appurtenances necessary to complete the work.                                                                                                                                                             Award of the contract will be made within sixty (60) calendar days from the date of the bid opening.   Plans and Specifications:  Plans and specifications and all related Contract Documents are open for public inspection at the office of the Tuscaloosa Sewer Department at the Hillard N. Fletcher Water Resource Recovery Facility, located at 4010 Reese Phifer Avenue, Tuscaloosa, AL 35401  and  plans,  specifications  and  other  elements  of  the  contract  documents  may  be  obtained  from  the  office  of  the Engineer  Hazen and Sawyer, designated as the office of the awarding authority for this purpose, located at  1490 Northbank Parkway, Suite 240, Tuscaloosa, AL 35406.  The contact person for the project is Brian Green, P.E.  He can be reached at (659)202-0013 or by email at RBGreen@hazenandsawyer.com.   Official Bid Documents can also be downloaded at www.centralbidding.com. Electronic Bids can be submitted at www.centralbidding.com. For any questions about the electronic bidding process, please contact Central Bidding at 225-810-4814 or support@centralbidding.com.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The JCSD Intervalley Pipeline Project (PN C155003) involves the installation of 3.3 miles of potable water transmission pipeline located along Country Village Road in Jurupa, California. Managed by Filanc on behalf of the Jurupa Community Services District, the project has an engineer's estimate of $36,000,000. The solicitation covers a wide array of specialized construction scopes, including pipe installation, valves, welding, disinfection, cathodic protection, jack and bore, asbestos pipe removal, paving, and electrical and instrumentation/controls. Additionally, the work encompasses supporting services such as videography, testing and inspections, settlement monitoring, surveying, traffic control, and stormwater pollution prevention (SWPPP). This procurement is subject to strict domestic sourcing requirements, specifically compliance with American Iron and Steel (AIS) and Buy American and Build America (BABA) standards. The solicitation is a Small Business set-aside and actively encourages participation from various socioeconomic categories, including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone Small Businesses, and Veteran-Owned or Service-Disabled Veteran-Owned Small Businesses. Interested parties must submit their quotes by the deadline of 2:00 PM on September 18, 2026. Plans and specifications are available upon request through the designated point of contact, Julia Masaitis, at bids@filanc.com.
Filanc

POSTED

about 15 hours ago

DEADLINE

in 26 days
View Details