Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Alabama was posted on August 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Utility Relocation for ALDOT Project No. DEMOF-RPF-NHF-PRF-A210(943) Woolsey Finnell Bridge Replacement and Approach on SR-6 (US-82) over the Black Warrior River

Closed
92225699State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and incidentals necessary to furnish, install, commission, and deliver a fully functional system. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes, concrete structures, and fabricated pipe and fittings. Additional requirements include traffic control, SWPPP implementation, construction surveys, and preconstruction video services. Norstar Plumbing and Engineering, Inc. is acting as the prime contractor and is actively seeking certified DBE, MBE, SBE, and WBE subcontractors and suppliers to support various specialty trades. The project falls under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications for the project are available through the Inland Empire Utilities Agency bidding portal. Primary points of contact for this solicitation are Nathan Plummer and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 14 hours ago

DEADLINE

in 5 days
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves critical infrastructure work for the City of Belmont in North Carolina. The scope of work includes the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, and ancillary site improvements such as stormwater facilities, fencing, and a generator. The estimated project value is 16,690,000 dollars. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a performance period of 560 calendar days following the Notice to Proceed. Bidders must meet specific socioeconomic goals, including an EPA MBE goal of 10.9 percent and a combined State of North Carolina MBE/WBE goal of 10 percent. Required submittals include a signed bid form, bid bond, and evidence of authority to sign. The successful contractor must provide performance and payment bonds per EJCDC standards and proof of insurance. Payments are processed monthly via applications for payment submitted to the engineer, with payment due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 14 hours ago

DEADLINE

in 17 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from DBE, MBE, WBE, and SBE subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the use of FRP reinforcing systems. Technical requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additional tasks encompass the rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting sump pump discharge lines, excavation, trench work, and surveying. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. All subcontractors are strictly required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with Garney reimbursing the bond premium. Quotes, which must include the subcontractor's bond rate and any redlines to standard subcontract forms, are due by November 17, 2026, at 2:00 PM PT, ahead of the November 18, 2026, bid date. Requested supplies and services specifically include lead abatement, rebar, metals fabrication, painting and coatings, electrical and instrumentation, trucking and hauling, and access hatches.
Garney Pacific, Inc.

POSTED

about 14 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

The City of Tuscaloosa is seeking sealed bid proposals for the utility relocation associated with the Woolsey Finnell Bridge Replacement and Approach on SR-6 over the Black Warrior River. The project scope involves extensive water and sanitary sewer work, including thousands of linear feet of water main, gravity sewer main, and force main installations, as well as jack and bore operations, manhole construction, and asphalt patching. Interested general contractors must attend a mandatory pre-bid conference on September 9, 2026, at 2:00 p.m. at City Hall to be eligible to bid. Sealed proposals are due by September 16, 2026, at 2:00 p.m. local time. The contract is expected to be awarded within sixty calendar days following the bid opening. Project documents are available through Hazen and Sawyer or via Central Bidding.

General Info

City of Tuscaloosa seeks bids for Woolsey Finnell Bridge utility relocation project.

Place of Performance

1490 North Bank Parkway, Suite 240, Tuscaloosa, AL, 35406, USA

Set-Aside

NONE

Documents

2

Woolsey Finnell Submittal Plans to Bid - Sealed.pdf

HTML

Woosley Finnell Submittal Specs to Bid - Sealed.pdf

HTML

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyAlabama → Hazen and Sawyer
Contacts1 person available
OfficeTuscaloosa, AL, 35406, USA
Organization / AgencyAlabama → Hazen and Sawyer
Office AddressTuscaloosa, AL, 35406, USA
Contacts

Full Description

Show more
CITY OF TUSCALOOSA ADVERTISEMENT FOR BIDS                                     Project Name: Utility Relocation for ALDOT Project No. DEMOF-RPF-NHF-PRF-A210(943) Woolsey Finnell Bridge Replacement and Approach on SR-6 (US-82) over the Black Warrior River, City of Tuscaloosa, Alabama File Number:OCA-25-1145    Engineering Project Number: 2024.729.001   Sealed Bid Proposals will be received by the City of Tuscaloosa, at the Council Chamber of City   Hall, 2201 University Boulevard, on September 16, 2026, at 2:00 p.m., local time for this project, at which time bids will be opened and read.   Pre-Bid Conference: Attendance at the MANDATORY Pre-Bid Conference is required in order for a General Contractor to submit a bid on this Project. The Pre-Bid Conference will be held at the Council Chamber of City Hall, 2201 University Boulevard, on September 9, 2026, at 2:00 p.m., local time. Parking and Entry to City Hall: Free visitor parking is provided in the Intermodal Facility (parking deck) at 2230 7th Street. Access City Hall through the 4th-floor skywalk entrance to Security.   Project Scope: Utility relocation of existing water and sanitary sewer including approximately 4,238 linear feet of water main (2-inch to 36-inch), 292 linear feet of water main flex ring (24-inch), 2,557 linear feet of water main carrier pipe (8-inch to 36-inch), 1,920 linear feet of water main jack and bore (16-inch to 48-inch encasement), 146 linear feet of water main open cut (30-inch encasement), 11 valves, control valve assembly, 774 linear feet of gravity sewer main (8-inch to 18-inch), 264 linear feet of sewer force main (16-inch), 324 linear feet of gravity sewer pipe flex ring (18-inch), 978 linear feet of sewer main carrier pipe (8-inch to 18-inch), 867 linear feet of sewer main jack and bore (16-inch to 30-inch encasement), 131 vertical linear feet of precast concrete manhole (48-inch), 220 square yards of asphalt patching, pipe bridge, wastewater flow control, landscaping, and miscellaneous appurtenances necessary to complete the work.                                                                                                                                                             Award of the contract will be made within sixty (60) calendar days from the date of the bid opening.   Plans and Specifications:  Plans and specifications and all related Contract Documents are open for public inspection at the office of the Tuscaloosa Sewer Department at the Hillard N. Fletcher Water Resource Recovery Facility, located at 4010 Reese Phifer Avenue, Tuscaloosa, AL 35401  and  plans,  specifications  and  other  elements  of  the  contract  documents  may  be  obtained  from  the  office  of  the Engineer  Hazen and Sawyer, designated as the office of the awarding authority for this purpose, located at  1490 Northbank Parkway, Suite 240, Tuscaloosa, AL 35406.  The contact person for the project is Brian Green, P.E.  He can be reached at (659)202-0013 or by email at RBGreen@hazenandsawyer.com.   Official Bid Documents can also be downloaded at www.centralbidding.com. Electronic Bids can be submitted at www.centralbidding.com. For any questions about the electronic bidding process, please contact Central Bidding at 225-810-4814 or support@centralbidding.com.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS