Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Utility Trenching and Earthwork

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Utility Trenching and Earthwork subcontract for the County of Santa Cruz involves performing excavation, trenching, and backfilling for water line projects at a County Park in Soquel, California. The scope of work includes excavating pipe trenches, applying noncorrosive granular bedding and shading, and backfilling using site soils or imported sand. All fill must be compacted to 95 percent density while maintaining optimum moisture content to ensure trenches are ready for utility installation. The contractor must adhere to specific erosion control standards outlined in Sections 31 23 17 and 31 25 13. This opportunity was posted on September 17, 2026, with a response deadline of October 15, 2026. The project falls under NAICS code 237990 and is intended for subcontractors working under prime contractors.

General Info

Utility trenching and earthwork for water lines at Santa Cruz County Park, Soquel.

Agency

California → County of Santa CruzView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Soquel, CA, 95073, USA

Set-Aside

NONE

Documents

This scope was carved out of 2026-RP0038.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Anna Jean Cummings Water Line Replacement Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → County of Santa Cruz
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → County of Santa Cruz
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs excavation, trenching, and backfilling for prime contractors on County Park water line projects. Excavates pipe trenches, places select noncorrosive granular bedding and shading, and backfills with site soils or imported sand. Compacts fill to 95% density while maintaining optimum moisture content. Complies with Section 31 23 17 and 31 25 13 Erosion Controls. Delivers excavated and backfilled trenches ready for utility installation.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
This solicitation is for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Haleiwa, Oahu, Hawaii, issued by the U.S. Army Corps of Engineers Honolulu District as a sealed bid, firm-fixed-price procurement. The work is being pursued with small business subcontracting and supply participation in mind, and the solicitation is set aside for HUBZone small business concerns under SBA authority. The project is valued in an estimated range of $1,000,000 to $5,000,000, with bids due by September 30, 2026, and performance expected to begin upon notice to proceed. The contract calls for a 200-calendar-day delivery/performance period, uses three CLINs covering mobilization/demobilization, dredging and ocean disposal of 4,260 cubic yards, and revetted mole repair, and requires bidders to submit on all line items. The place of performance is the harbor site in Hawaii, with dredged material to be disposed of at an approved offshore site south of Oahu. Submission is in hard copy only; electronic bid submission is not permitted, and sealed envelopes must be properly marked. Bidder questions are to be submitted through ProjNet by the stated deadline, with a designated bidder inquiry key provided. A bid guarantee is required, and the contractor must also furnish performance and payment bonds. The project scope combines maintenance dredging with repair of the revetted mole, including clearing and grubbing, vegetation and root removal, stone rework, filling voids with additional stone, environmental controls, water quality protections, and disposal of dredged material. The drawings and specifications reference detailed site plans, cross sections, survey data from 2024, contractor notification and preservation obligations, and specific dredging methods. Technical requirements include pre- and post-dredge surveys by a qualified third-party surveyor using multi-beam hydrographic methods, acceptance based on median depth sorting on a 3-foot by 3-foot grid, and strict inspection criteria for stone quality and construction compliance. The contractor must submit an operations plan and schedule within 30 days of notice to proceed, maintain a quality control program with preparatory, initial, and follow-up phases, and provide key personnel including a project manager, project superintendent, QC manager, and site safety and health officer with supporting resumes and letters of direction. The solicitation incorporates Davis-Bacon wage requirements, public safety and traffic controls, cybersecurity during construction, CUI/NDA obligations for certain data, and specific compliance clauses covering liquid
Healy Tibbitts Builders, Inc.

POSTED

about 3 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237990
New
SLED
Guadalupe Light Rail Vehicle Wash Replacement
Solicitation # C25134F
The Santa Clara Valley Transportation Authority is soliciting bids for Contract C25134F, the Guadalupe Light Rail Vehicle Wash Replacement project located in San Jose, California. The scope of work involves the complete removal and replacement of the Light Rail Vehicle wash system at Building F of the Guadalupe Division. Key technical requirements include the installation of a new prefabricated canopy structure, replacement of embedded tracks and concrete slabs, the construction of a concrete wastewater collection trench, and the installation of a comprehensive wash system designed for 88.5-foot-long vehicles. The system will include pre-soak and rinse arches, brushes, high-pressure arches, a gantry system, and water reclamation and softening equipment. Electrical work involves replacing transformers, panelboards, and lighting. The engineer's estimate for the project ranges from 4.5 million to 5.5 million dollars. Bids must be submitted electronically by November 2, 2026. Award criteria are based on responsiveness, responsibility, and pre-qualification, with a requirement for a pre-award Buy America audit if necessary. The contract incorporates Federal Transit Administration clauses and requires compliance with Buy America, ADA, and DBE participation policies. Performance is contingent upon the submission of performance and payment bonds, insurance certificates, and the completion of VTA safety training for all personnel working near tracks. Liquidated damages for delays are set at 1,000 dollars per calendar day. Final acceptance requires the delivery of as-built drawings, operations and maintenance manuals, and a completed training program.
Santa Clara Valley Transportation Authority

POSTED

about 16 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from California → County of Santa Cruz

Same awarding agency

NAICS: 237110
New
SLED
Anna Jean Cummings Water Line Replacement Project
Solicitation # 2026-RP0038
The Anna Jean Cummings Water Line Replacement Project (Solicitation #2026-RP0038) is a public works contract issued by the County of Santa Cruz, California, to replace a leaking domestic water distribution system at Anna Jean Cummings County Park in Soquel. The scope of work involves the installation of approximately 925 to 1,300 lineal feet of new polyethylene tubing to replace an existing PVC line, abandoning the old line in place, and connecting the new system to the existing park water infrastructure. Additional requirements include site preparation, demolition, concrete paving replacement, and post-installation site work. The project aims to improve long-term reliability and reduce maintenance costs by relocating portions of the line to landscaped areas. The contract is awarded to the lowest responsible bidder based on a lump sum price, with an engineer's estimate of $277,000. Qualified bidders must hold a Class A license, be registered with the Department of Industrial Relations, and submit electronic proposals by October 15, 2026, at 2:00 p.m. PDT. The project must be completed within 60 calendar days from the Notice to Proceed and includes a one-year guarantee for workmanship and materials. Key administrative requirements include a 10% bid bond, 100% performance and payment bonds, compliance with California prevailing wage laws, and adherence to the California Plumbing Code and ADA standards. Final acceptance of the work is subject to approval by the County Board of Supervisors.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 27 days
View Details
NAICS: 541620
New
SLED
RFP For FHWA ER Programmed Storm Damage Repair Projects - Environmental Consulting Services
Solicitation # 2026-RFP - Roads-079
The County of Santa Cruz is soliciting proposals for environmental consulting services to support Federal Highway Administration Emergency Relief Programmed Storm Damage Repair Projects. The selected consultant will be responsible for providing environmental assessments, biological assessments, Section 106 compliance, and the preparation of Project Environmental Study forms to ensure all repairs adhere to state and federal regulations. The scope of work includes project site evaluations and the delivery of monthly progress reports. This is a qualifications-based selection process where the County will rank consultants based on their expertise and negotiate with the top-ranked firm. The contract is structured as an actual cost plus a fixed fee agreement, with progress payments made monthly in arrears. Compliance requirements are extensive, including adherence to Title VI of the Civil Rights Act, 48 CFR Part 31 cost principles, and California Labor Code prevailing wage rates. Consultants must certify they are not currently suspended or debarred by any federal agency and must provide insurance and indemnification to the County. Proposals must be submitted via the OpenGov portal in PDF format, with the cost proposal submitted as a separate, password-protected file to maintain confidentiality during the technical evaluation.
Environmental Consulting Services

POSTED

5 days ago

DEADLINE

in 20 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS