Utility Water Piping Replacement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Central Coast Water Authority is preparing to replace sections of corroded utility water piping at the Polonia Pass Water Treatment Plant in California, a facility it operates to treat and deliver State Water Project water to retail providers and end users within the county. The plant relies on a utility water distribution system that supports critical operations, including the handling of treatment chemicals stored in tanks, and the damaged piping poses a risk to system integrity and operational efficiency. The project will focus exclusively on replacing the deteriorated portions of the existing piping to maintain safe and reliable water distribution functions. All work is anticipated to take place at the treatment plant located in the 93461 zip code area. The solicitation for this utility water piping replacement is forecasted for release with a posted date of May 29, 2026, and all inquiries and communications should be directed to Peter Thompson, Executive Director, at pkt@ccwa.com or 805-688-2292. Although no formal solicitation number, NAICS code, or set-aside details are currently available, the project is under the authority of the Central Coast Water Authority and will be performed in California. The official project page can be accessed through the provided CEQA Net link for future updates and documentation as the procurement process advances.

General Info

Replace corroded water piping at Polonia Pass Plant in California, operated by Central Coast Water Authority.

Agency

California → Central Coast Water Authority

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

5250 Antelope Road, Shandon, CA 93461, CA, 93461

Set-Aside

NONE

Documents

(1)

Utility Water Piping Replacement CEQA Exemption Notice

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Central Coast Water Authority
Contacts1 person available
OfficeN/A
Organization / Agency
California → Central Coast Water Authority
Office AddressN/A
Contacts
Peter ThompsonExecutive Director

Full Description

Show more
The Central Coast Water Authority (CCWA) is a joint powers agency formed to construct, own, and operate certain facilities needed to treat, convey, and deliver State Water Project (SWP) water to its project participants retail water providers and end users located within the County. The Polonia Pass Water Treatment Plant (WTP) is one of CCWA's facilities and stores treatment chemicals in chemical tanks. The Water Treatment Plant is equipped with a utility water distribution system. Portions of the existing piping have corroded and need to be replaced. CCWA intends to replace the portions of the corroded piping.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 2 hours ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS