Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

V04 - Lawn on D Utilities Upgrades

Active
BD-27-1208-MCCA1-MCCA1-134347State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The V04 Lawn on D Utilities Upgrades project is an open market solicitation issued by the Massachusetts Convention Center Authority for the construction of permanent electrical and water utility improvements at the Massachusetts Convention Center MCEC in Boston. The scope of work includes the installation of new electrical distribution infrastructure, water service connections, utilities equipment, conduit, and piping systems, as well as comprehensive site restoration to support event operations. All work must adhere to the detailed requirements set forth in the project drawings and specifications. The solicitation was posted on October 14, 2026, with a pre-bid conference scheduled for October 21, 2026. Interested bidders must submit their responses by the deadline of November 12, 2026, at 5:00 PM, which also serves as the bid opening date. Contract documents and amendments are available through the Authority's website at rfp.massconvention.com. Administrative inquiries and invoicing are handled by the Procurement Department located at 415 Summer Street, Boston, with Christopher Gong serving as the primary purchaser.

General Info

Electrical and water utility upgrades at Boston MCEC; bids due November 12, 2026.

Place of Performance

Summer Street Boston, MA, 02210, USA

Set-Aside

NONE

Documents

13

BD-27-1208-MCCA1-MCCA1-134347: V04 - Lawn on D Utilities Upgrades

HTML, High priority: read this first3 pages · ifb
High

BD-27-1208-MCCA1-MCCA1-134347: V04 - Lawn on D Utilities Upgrades

HTML, High priority: read this first3 pages · ifb
High

BD-27-1208-MCCA1-MCCA1-134347: V04 - Lawn on D Utilities Upgrades

HTML, High priority: read this first3 pages · ifb
High

BD-27-1208-MCCA1-MCCA1-134347: V04 - Lawn on D Utilities Upgrades

HTML, High priority: read this first3 pages · ifb
High

BD-27-1208-MCCA1-MCCA1-134347: V04 - Lawn on D Utilities Upgrades

HTML, High priority: read this first3 pages · ifb
High

BD-27-1208-MCCA1-MCCA1-134347: V04 - Lawn on D Utilities Upgrades

HTML, High priority: read this first3 pages · ifb
High

BD-27-1208-MCCA1-MCCA1-134347: V04 - Lawn on D Utilities Upgrades

HTML, High priority: read this first3 pages · ifb
High

BD-27-1208-MCCA1-MCCA1-134347: V04 - Lawn on D Utilities Upgrades

HTML, High priority: read this first3 pages · ifb
High

BD-27-1208-MCCA1-MCCA1-134347: V04 - Lawn on D Utilities Upgrades

HTML, High priority: read this first3 pages · ifb
High

BD-27-1208-MCCA1-MCCA1-134347: V04 - Lawn on D Utilities Upgrades

HTML, High priority: read this first3 pages · ifb
High

BD-27-1208-MCCA1-MCCA1-134347: V04 - Lawn on D Utilities Upgrades

HTML, High priority: read this first3 pages · ifb
High

Bid BD-27-1208-MCCA1-MCCA1-134347: V04 - Lawn on D Utilities Upgrades

HTML, High priority: read this first3 pages · ifb
High

commbuys-source-page-BD-27-1208-MCCA1-MCCA1-134347.html

HTML, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMassachusetts → MCCA1 - Legal
Contacts1 person available
OfficeSummer Street Boston, MA, 02210, USA
Organization / AgencyMassachusetts → MCCA1 - Legal
Office AddressSummer Street Boston, MA, 02210, USA
Contacts
Christopher GongPurchaser

Full Description

Show more
This project consists of the construction necessary to provide permanent electrical and water Utilities improvements to the Lawn on D event area at the Massachusetts Convention Center MCEC. Contract documents for bidders will be available on or after October 14, 2026 via the Authority's website rfp.massconvention.com and each bidder may obtain the documents at such address, together with any addenda or amendments which the Authority may issue.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and incidentals necessary to furnish, install, commission, and deliver a fully functional project. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes and structures. Specialized services required for the project include electrical work, welding, construction surveys, preconstruction video, and traffic control. Norstar Plumbing and Engineering, Inc. is managing the solicitation and is specifically seeking certified and qualified DBE, MBE, SBE, and WBE subcontractors and suppliers to support these efforts. The project falls under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website, and coordination is handled by primary points of contact Nathan and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 3 hours ago

DEADLINE

in about 22 hours
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, site grading, and the provision of a fully operating pumping station equipped with mechanical and electrical systems, a generator, and odor control equipment. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with responsiveness contingent upon the submission of a completed EJCDC C-410 Bid Form, a bid bond, and required MWBE documentation, including a Good Faith Efforts Form and Table A. The contractor must provide performance and payment bonds equal to the contract price and maintain insurance with an A.M. Best rating of A-VII or better. Performance is governed by a Notice to Proceed, with liquidated damages set at 1,000 dollars per day for failure to achieve substantial completion. Payments are processed monthly via applications for payment submitted to the Engineer, with payment due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work includes the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additionally, the project requires the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. Bids will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines or comments along with the quote.
Garney Pacific, Inc.

POSTED

about 3 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities Project No. EN19001.03 and the Butterfield Lift Station Improvements Project No. EN26054 located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of the Mountain Avenue Lift Station with two submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operational service. Filanc is seeking quotes across a wide array of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and E&IC. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. All bids and quotes must be submitted by October 29, 2025, at 2:00 PM.
Filanc

POSTED

about 3 hours ago

DEADLINE

in about 22 hours
View Details

More opportunities from Massachusetts → MCCA1 - Legal

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS