Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on June 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Valley View-Woods Area Water Main Replacement

Closed
20260623033State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont, North Carolina, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Additional deliverables include the installation of new gravity sewers and manholes, a generator, odor control equipment, stormwater facilities, and site fencing. The project has an estimated value of $16,690,000 and is set aside for small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts forms. The agreement is governed by EJCDC standard forms, requiring performance and payment bonds and proof of insurance. Performance begins upon a Notice to Proceed, and payment is processed monthly via applications for payment submitted to the Engineer, with payments due 30 days after presentation to the owner. Final acceptance is contingent upon a joint inspection by the Owner, Contractor, and Engineer, the completion of a punch list, and the Engineer's written recommendation for final payment.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The City of Fullerton is soliciting bids for the Valley View-Woods Area Water Main Replacement project, with an engineer's estimate of $2,475,000. The scope of work involves the abandonment and removal of existing water main piping and the installation of new PVC water main piping ranging from 2 to 12 inches, along with associated appurtenances such as gate valves, water services, and fire hydrants. Additional requirements include trench repair, asphalt paving, concrete work for alley returns, access ramps, and gutters, as well as comprehensive traffic and water pollution control. The project must be completed within 100 working days, and the award will be granted to the lowest responsible bidder. Bids are due by 1:00 PM on July 13, 2026, and must be submitted electronically via the OpenGov Procurement Portal. Qualified bidders must possess a Class A license and DIR registration. The contractor is responsible for providing as-built drawings, operation and maintenance manuals, and a Storm Water Pollution Prevention Plan. Work must adhere to the 2024 Greenbook Standard Specifications for Public Works Construction, City of Fullerton Standard Drawings, and Caltrans specifications. Key administrative requirements include a mandatory pre-job conference 15 working days after the award and the maintenance of a valid City business license and public right-of-way permit on-site.

General Info

Fullerton water main replacement project, $2.475 million estimate, bids due July 13, 2026.

Place of Performance

Fullerton, CA, 92832, USA

Set-Aside

NONE

Documents

3

53059 Plan Bid Set - Water General and Construction Notes

PDF, High priority: read this firstspecifications
High

53059 Valley View-Woods Area Water Main Replacement

PDF, High priority: read this firstifb
High

Followers_List_1783105756288.csv

CSV

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Fullerton
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Project Engineer

Full Description

Show more
Bid #53059: The project consists of abandoning and removing existing water main piping and appurtenances, furnishing and installing new PVC water main piping (4-inch to 12-inch) and appurtenances, including gate valves, water services, and fire hydrants. The work also includes trench repair, asphalt paving, adjustment of water valve boxes, and concrete work for replacing existing alley returns, access ramps, and alley gutters. Traffic control and water pollution control are also key components of the project.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS