This Solicitation opportunity from Department Of Defense was posted on October 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
VALVE, LINEAR, DIRECTION
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Solicitation SPE7M2-26-T-7081 is a fixed-price request for quotations issued by the DLA Land and Maritime Nuclear Reactor Program for two linear directional control valves, NSN 4810013417103, manufactured by Indal Technologies Inc. This is a restricted source item requiring engineering source approval by the government design control activity. The required delivery date is February 16, 2028, with a delivery period of 495 days. Inspection and acceptance will occur at the point of origin, and the manufacturer must maintain an inspection system compliant with ISO 9001:2015 or an equivalent standard. The contract mandates strict traceability and quality controls, as the valves are designated as Critical Application Items. Serialization is required for both the parts and their packaging, and all serialized items, including manufacturing scrap, must be fully accounted for. Packaging must adhere to MIL-STD-2073-1E and RP001, with marking following MIL-STD-129. Environmental restrictions prohibit the use of Class I ozone-depleting chemicals and the intentional addition of mercury. Additionally, the contractor must comply with the Buy American Act and DFARS cybersecurity standards for safeguarding covered defense information.
General Info
Place of Performance
Set-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownSolicitation requirements
64 mandatory82 requirements in 8 areas
- Technical21 · 18 must041
Part Serialization Requirements
- Compliance22 · 15 must019
Master Solicitation Terms
- Quality Assurance11 · 11 must063
Origin Inspection Standards
- 79 more requirements, each with its source quote
Read every requirement with its source and proposal context.
Read all 82 requirementsThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Manufacture of Straight Pipe-to-Hose AdaptersOpen now, due in 11 days
- Compressor Piston SupplyOpen now, due in 11 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Response deadline changed from Oct 8, 2026 to Oct 14, 2026.
Deadline has passed
Organization & Contact Information
Full Description
VALVE,LINEAR,DIRECT
82N ALRE
SERIALIZATION: Serialization is required for this ALRE CAI part as well as the packaging for traceability. Contractor technical documentation shall reflect the appropriate marking scheme. All serialized and lot numbered CAI parts shall be accounted for; to include material scrapped during manufacturing. Re-branding by suppliers which obscures the original marking (part number, serial number, CAGE) of the OEM of ALRE CAI parts is prohibited. Please notify DLA Contracting Officer at time of quote if serialization is not practical due to size, material property, unreasonable or excessive cost. RC001: DOCUMENTATION REQUIREMENTS FOR SOURCE APPROVAL REQUEST (SAR)
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
RQ006: QUALITY CONFORMANCE INSPECTION REQUIREMENTS
RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN
RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
RQ002: CONFIGURATION CHANGE MANAGEMENT ENGINEERING CHANGE PROPOSAL
REQUEST FOR VARIANCE (DEVIATION OR WAIVER)
CLASS I OZONE DEPLETING CHEMICALS ARE NOT TO BE
USED NOR INCORPORATED IN ANY ITEMS TO BE
DELIVERED UNDER THIS CONTRACT.THIS PROHIBITION
SUPERSEDES ALL SPECIFICATION REQUIREMENTS BUT
DOES NOT ALLEVIATE ANY PRODUCT REQUIREMENTS.
SUBSTITUTE CHEMICALS MUST BE SUBMITTED FOR
APPROVAL UNLESS THEY ARE AUTHORIZED BY THE
SPECIFICATION REQUIREMENTS.
The Government Procuring Activity has determined that Surplus is not Acceptable for this NSN. (End of TQ Requirement) MERCURY OR MERCURY CONTAINING COMPOUNDS SHALL NOT BE INTENTIONALLY ADDED TO<(>,<)> OR COME IN DIRECT CONTACT WITH<(>,<)> ANY HARDWARE OR SUPPLIES FURNISHED UNDER THIS CONTRACT. EXCEPTION: FUNCTIONAL MERCURY USED IN BATTERIES, FLUORESCENT LIGHTS, REQUIRED INSTRUMENTS; SENSORS OR CONTROLS; WEAPON SYSTEMS; AND CHEMICAL ANALYSIS REAGENTS SPECIFIED BY NAVSEA.
SPE7M2-26-T-7081
SECTION B
PORTABLE FLUORESCENT LAMPS AND PORTABLE INSTRUMENTS
CONTAINING MERCURY SHALL BE SHOCK PROOF AND CONTAIN
A SECOND BOUNDARY OF CONTAINMENT OF THE MERCURY OR
MERCURY COMPOUND. (IAW NAVSEA 5100-003D).
NOTE: THIS IS A RESTRICTED SOURCE ITEM AND
REQUIRES ENGINEERING SOURCE APPROVAL BY THE
GOVERNMENT DESIGN CONTROL ACTIVITY.
RQ040: Non-Destructive Testing (NDT) Accreditation Requirements
RQ039: Non-Tailored Higher-Level Quality Requirements (SAE AS9100) for Manufacturers and Non-Manufacturers
CRITICAL APPLICATION ITEM
INDAL TECHNOLOGIES INC. 36334 P/N DSG-01-2B3B-A100-7090
IAW REFERENCE REVISION NR DTD PART PIECE NUMBER:
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments% 2FDLMS%2FeApplications%2FLogDataAdmin%2FUnitofIssueandPurchaseUnit.xlsx&wdOrigin=BROWSELINK
CLIN PR PRLI UI QUANTITY UNIT PRICE TOTAL PRICE.
0001 7018376889 0001 EA 2.000
NSN/MATERIAL:4810013417103
DELIVERY (IN DAYS):0495
DELIVER FOB: ORIGIN
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: ORIGIN
ACCEPTANCE POINT: ORIGIN
PREP FOR DELIVERY:
PKGING DATA MIL-STD-2073-1E
QUP:001 PRES MTHD:33 CLNG/DRY:1 PRESV MAT:49
WRAP MAT:GB CUSH/DUNN MAT:GA CUSH/DUNN THKNESS:D
UNIT CONT:E5 OPI:O
INTRMDTE CONT:E8 INTRMDTE CONT QTY:AAA
PACK CODE:U
MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.
SPECIAL MARKING CODE:ZZ -ZZ Special Requirements
PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
PACKAGING PRESERVATIVE: APPLY PRESERVATIVE TO EXTERNAL BARE METALLIC
SURFACES
EACH UNIT PACKAGE WILL BE MARKED WITH THE NSN,
CONTRACT NUMBER, LOT NUMBER, CONTRACTOR CAGE
SPE7M2-26-T-7081
SECTION B
PR: 7018376889 PRLI: 0001 CONT’D
CODE, MANUFACTURER CAGE CODE, AND PART NUMBER.
PARCEL POST ADDRESS:
W25G1U
W1A8 DLA DISTRIBUTION
DDSP NEW CUMBERLAND FACILITY
2083 NORMANDY DRIVE DOOR 113 TO 134
NEW CUMBERLAND PA 17070-5002
US
FOR TRANSPORTATION SEE DLAD DLAD PROC NOTE C19. FOR FIRST DESTINATION TRANSPORTATION SEE DLAD PROC NOTE
C20 AND CONTRACT
FREIGHT SHIPPING ADDRESS:
W25G1U
W1A8 DLA DISTRIBUTION
DDSP NEW CUMBERLAND FACILITY
2083 NORMANDY DRIVE DOOR 113 TO 134
NEW CUMBERLAND PA 17070-5002
US
Need Ship Date:02/16/2028 Original Required Delivery Date:02/16/2028
SPE7M2-26-T-7081 NSN/Part Number: 4810-01-341-7103 Quantity: 2 EA Purchase Request: 7018376889QTY: 2 Delivery: 495 days ADO
Earlier notices in this NAICS code
Posted before this notice, open and closed
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
