Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Verizon Wireless Conditional Use Permit / N-DRC2023-00049 / ED25-0199

Forecast
N-DRC2023-00049State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Robert Soto and Verizon Wireless have requested a Conditional Use Permit from San Luis Obispo County for the construction and operation of an unmanned wireless communications facility. Located at 8610 Green Valley Road in the Adelaida sub-area of the North County planning area, the project is situated within an agriculture land use category approximately 12 miles east of Cambria. The facility will feature a 45-foot-tall faux water tank used to disguise nine panel antennas, six remote radio units, four surge suppressor units, and one GPS antenna. The installation includes associated trenching, equipment, cabinets, and hardware, with a 30-kW emergency diesel generator housed within a 1,080-square-foot chain link fence enclosure. The project, identified as N-DRC2023-00049, is classified as a Class 3 Categorical Exemption under CEQA Guidelines Section 15303 for the new construction of small structures, as it is determined to have no significant environmental impact. Administrative details include a county documentary handling fee of 81 dollars and a Notice of Exemption dated October 16, 2025. Primary coordination is managed by Planner II Blake Maule for the county and Justin Gronendyke as the authorized agent.

General Info

Verizon Wireless permit for a disguised wireless facility at 8610 Green Valley Road.

Agency

California → San Luis Obispo County

Place of Performance

Cambria, CA, 93428

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → San Luis Obispo County
Contacts2 people available
OfficeN/A

Full Description

Show more
A request by Robert Soto and Verizon Wireless for a Conditional Use Permit to allow the construction and operation of an unmanned wireless communications facility consisting of nine (9) panel antennas, six (6) remote radio units, four (4) surge suppressor units, and one (1) GPS antennae disguised within a 45-foot-tall faux water tank, and associated trenching, equipment, cabinets, and hardware. The ancillary hardware, including a 30-kW emergency diesel generator, is to be located within a 1,080-square-foot (18' x 60') lease area surrounded by a chain link fence enclosure. The proposed project is within the agriculture land use category and is located at 8610 Green Valley Road, approximately 12 miles east of the Community of Cambria. The subject property is within the Adelaida sub-area of the North County planning area.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
RFP for Preparation of an Initial Study Under CEQA
Solicitation # RFP-PLN-2504
The County of San Benito is soliciting proposals for the preparation of an Initial Study under the California Environmental Quality Act (CEQA). This project, identified as RFP-PLN-2504, requires the selected contractor to perform services in accordance with the Public Resources Code and the California Code of Regulations. The scope of work is divided into three primary tasks: project management, scope of services, and a traffic impact analysis. To support the study, the County has provided reference materials from planning files PLN250084 and PLN180004, which include grading and utility plans, a mitigated negative declaration, and various technical reports. Proposals must be submitted electronically via the OpenGov system by December 7, 2026, at 5:00 pm. The submission must be split into a technical proposal and a separate cost proposal using a specific pricing table. Award selection is based on a points-based scoring system that weights cost at 30%, firm qualifications at 25%, experience in similar CEQA analysis at 25%, and the quality of the written scope of work at 20%. The County reserves the right to award the contract to the highest-rated proposer rather than the lowest bidder. The resulting contract will be governed by the County of San Benito's Standard Contract, featuring a net-30 payment term with invoicing occurring one month in arrears. Contractors must certify compliance with various federal non-discrimination laws, including the Americans with Disabilities Act and the Civil Rights Act of 1964, and must provide a debarment certification. Final project schedules, including milestones and critical paths, will be required from the proposer, while specific insurance and indemnification terms will be finalized during the negotiation process.
Planning

POSTED

about 14 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541620
New
International
Source Water Protection Plan - Baptiste Lake
Solicitation # 235899
The Regional District of East Kootenay is seeking a qualified consultant to develop a comprehensive and implementable Source Water Protection Plan for Baptiste Lake in British Columbia. The scope of work involves characterizing the lake and watershed as a drinking water source, identifying hazards and vulnerabilities, and evaluating current protection measures, governance, and climate-related risks. The final deliverables must include a detailed Source Water Protection Plan with recommended actions for land use and monitoring, a practical implementation plan with budget-level cost estimates, and a monitoring framework with decision triggers. The plan must align with the Edgewater Water System Master Plan, Interior Health permit conditions, and DFO screening requirements. The contract is expected to be awarded by December 18, 2026, with a project start-up meeting scheduled for mid-January 2027, a draft report due by May 28, 2027, and a final report due by July 2, 2027. Proposals are evaluated on a 100-point scale, with 40 points allocated to the project team and experience, 40 points for project understanding and methodology, and 20 points for the fee. The selection process prioritizes the highest overall ranking and best value rather than the lowest bid. Submissions must be delivered in PDF format to the designated Engineering Technician by the closing deadline.
Regional District of East Kootenay

POSTED

about 16 hours ago

DEADLINE

in 24 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS