This Solicitation opportunity from Minnesota was posted on January 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Verndale C2 2026
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Verndale School District 818 is seeking proposals for Category 2 internal connections, specifically Extreme Networks model X450G2-48P-10G4 switches or compatible equivalents, including all necessary software, licenses, and installation services. Proposals must be submitted via email within 28 days of the posting, with questions accepted only during the first two weeks. Bids must be itemized by brand, model, SKU, and quantity, and must include all taxes, shipping, and fees. Any equivalent equipment must be supported by documentation proving interoperability with existing infrastructure. The contract term runs from April 1, 2026, to September 30, 2027, with an optional one-year extension. Vendors must be authorized resellers in compliance with E-Rate rules, including Lowest Corresponding Price and FCC National Security Supply Chain Restrictions. All equipment must include a manufacturer warranty of up to three years. The district reserves the right to adjust quantities based on final design and may utilize SPI invoicing. Non-responsive bids, gray market products, or proposals indicating additional hidden costs will be disqualified.
General Info
Place of Performance
Set-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- MSA-120 WorkstationsOpen now, due in 3 days
- M00P7602800 - ShareGate RenewalOpen now, due in 7 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
1. This 470 includes any eligible components, connectors, modules, SFP's, mounts, equipment, licenses, software, and service necessary for the functionality of the network. 2. Quotes must include brand, model number, SKU, quantity, and itemized price of equipment. The applicant seeks the most current models available so if any equipment listed is end of life, please bid the replacement model. 3. Equipment should include the manufacturer's bundled warranty (up to three years) at no additional charge. 4. Installation/configuration must include labels on equipment with the E-Rate FRN, and an asset inventory with E-Rate 471/FRN, serial numbers, make/model, date and location. 5. All quantities and capacities are APPROXIMATE and may change with the final design. Pricing must not assume the applicant will purchase the full quantities listed in the quote. 6. Equivalent brands and models must be compatible and interoperable with existing infrastructure and documentation must be provided to support compatibility. Equivalent quotes should include manufacturers documentation that supports equivalency. The district personnel will determine whether the equipment is equivalent. 7. Bids should include all eligible charges such as taxes, fees, shipping, travel, etc. No generic price sheets will be accepted. Bids must specifically address the needs of the school as presented in the Form 470 with itemized pricing and final tally. Quotes received without this information will be disqualified. 8. If proposals indicate that additional costs may apply the proposal will be considered incomplete and it will be disqualified. 9. Ineligible amounts need to be clearly identified on the bid and cost-allocation provided. Co-Term license/product numbers are not eligible for E-rate. 10. DISTRICT MAY SEEK SPI INVOICING. If vendor is unwilling to invoice via SPI, a notation must be made on bid. 11. Service providers must be authorized resellers of the equipment they bid. "Gray market" products will not be accepted and quotes will be disqualified. 12. Bids must include vendor's contract terms and conditions. If vendor does not have a contract available, make note on the quote. If bidder is submitting on behalf of the vendor, bidder must provide documentation to show that vendor will honor prices and contract terms. 13. Term dates must be April 1, 2026 - September 30, 2027 to cover the full E-rate cycle, plus an optional one-year extension. If multi-year licenses are included the term must cover the full length of the license. 14. Non-responsive bids will not be evaluated. Bidders are advised to be careful not to make any changes or mistakes as any material alteration to the quote shall be, at the sole discretion of the District, grounds for disqualification of the proposal. 15. Questions and Answers may be uploaded to the 470. It is the service provider's responsibility to check back for amendments to the 470. If any changes are needed that require re-starting the 28 day bidding period, the new proposal deadline will be listed there. 16. SPAM and/or robotic responses will not be considered valid bid responses and will be disqualified from consideration.
Requested services (1 line item): - Category 2 — Internal Connections — Switches And Necessary Software And Licenses
State/local procurement requirements: 1. Purchases and contracts are contingent upon E-Rate funding, district finances, board approval. Applicant will provide selected vendor with written notice to proceed. 2. Applicant requests a multi-year contract w/ voluntary extensions in case all equipment can't be purchased in year one. 3. Contracts should allow for scalability, and the addition of sites, equipment, and service to meet the future needs of the district. 4. Applicant has the right to cancel the contract in the event that there is a change to E-Rate program rules that fully or substantially affect the eligibility of any items on this 470. 5. Applicant reserves the right to order equipment as needed and is not obligated to order all products or services. 6. Service providers must be in compliance with all E-rate rules, including Lowest Corresponding Price (LCP). In addition, vendors must provide a SPIN; be on green light status with USAC and remain so during the life of the contract; and be in compliance with all SLD/USAC/FCC regulations. Failure to be in compliance is a disqualification factor. 7. Vendor must verify that their bid does not include any products or components from Huawei, ZTE, or any "covered company" prohibited by the FCC's National Security Supply Chain Restrictions found here: https://www.fcc.gov/supplychain/coveredlist 8. If assistance is needed in navigating the E-rate program, contact USAC's Customer Service Center at +1 (•••) •••-••••Sign up to see this detail, or visit the website at https://www.usac.org/e-rate/service-providers/.
Reference documents (Form 470 / RFP): https://publicdata.usac.org/EPC/Prd/Form470/260015553/133965/20953811-USAC_FCC_FORM_470_APPLICATION_260015553_CERTIFIED.pdf
Earlier notices in this NAICS code
Posted before this notice, open and closed
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
