Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from New York was posted on March 20, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Village of Ovid Water Source & Distribution System Improvements Engineering Services

Closed
2108009State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541310
New
International
Refurbishment, Acoustic Enhancement, Interior Space Redesign, and Terrace Social Area Development at UNICEF Angola Premises AGUIAR ANTONIO CUIUNDANA - [email hidden]
Solicitation # EOI/001/AGO/2026
UNICEF Angola is seeking Expressions of Interest (EOI) for professional architectural, engineering, interior design, and acoustic enhancement services to refurbish its office facilities in Luanda. The project scope focuses on three primary areas: the redesign of offices, meeting rooms, and common areas to optimize workspace functionality; the implementation of soundproofing and acoustic treatments to ensure speech privacy and confidentiality; and the conceptual development of a social and recreational terrace area in Block 1. The selected firm will be responsible for delivering a comprehensive design package, including detailed architectural drawings, technical specifications, preliminary cost estimates, and Bills of Quantities. Submissions must be received by November 23, 2026, and should be directed to Messay Gebre Tenna, Aguiar Cuiundana, and Remigio Guiamba. To be shortlisted for the subsequent Request for Proposal (RFP) phase, firms must achieve a minimum technical score of 70 points. Evaluation is based on relevant experience in office refurbishment and acoustic engineering, the qualifications of key personnel, the quality of the submitted portfolio, and previous experience with international organizations or diplomatic missions. Required submission materials include a company profile, CVs of key personnel, business registration documents, professional certifications, and at least three references from recent projects.
UNICEF

POSTED

about 17 hours ago

DEADLINE

N/A
NAICS: 541310
New
SLED
City of Santa Cruz Lifeguard Headquarters Repairs
Solicitation # RFQ No. SCFD-0334
The City of Santa Cruz is soliciting architectural services for the repair of the Lifeguard Headquarters located at 1 Municipal Wharf. The primary objective is to implement necessary repairs to ensure the facility is safe and operationally ready while the city conducts long-term planning for future use and expansion. The scope of work is divided into six key tasks: the preparation of 30 percent and 100 percent building permit plan sets and project specifications, the provision of construction cost estimates, bid support, construction support, and the delivery of final as-built drawings and annotated specifications. The selected architect must coordinate with multiple regulatory agencies, including the California Coastal Commission and NOAA, and ensure all designs comply with ADA standards and professional guidelines from organizations such as the AIA and ASCE. The selection process is qualifications-based, where an evaluation committee ranks the top three respondents based on expertise and experience without initial regard to fee, provided the final cost fits within the project budget. Proposals must be submitted by December 3, 2026, and include a main proposal with firm information, references from similar projects completed within the last five years, and a project schedule, with the fee proposal submitted in a separate sealed envelope. The contract is a Professional Services Agreement requiring compliance with California prevailing wage laws and equal employment opportunity regulations. Performance includes mandatory site visits to monitor quality and progress, culminating in a punch list and final certification of work.
Fire

POSTED

about 23 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The Village of Ovid is seeking qualified engineering firms through a qualifications-based process to assist with the design, bidding, construction, and project closeout of its Water Source and Distribution System Improvements. The project aims to address issues related to the village’s primary water source from Seneca Lake, which has been impacted by Harmful Algal Blooms, and the lack of a reliable alternative potable water supply. The village also needs to replace approximately 2,430 linear feet of aging water mains and improve water treatment practices to better manage contaminants like nitrates and TTHMs. Funding for the project includes over $3 million from Bipartisan Infrastructure Law grants and interest-free loans, with potential additional support from the Drinking Water State Revolving Fund, requiring the selected firm to ensure compliance with all funding agency requirements. The selection process emphasizes the firm’s technical competence, experience with similar projects, familiarity with NYS funding programs, and ability to manage project schedules, budgets, and regulatory requirements. The process involves submitting qualifications by April 19, 2024, with shortlisted firms potentially invited for interviews. The contract, initially set for three years with possible renewal, mandates comprehensive insurance coverage and encourages MWBE and Section 3 firm participation. The Village retains broad rights to amend or reject proposals and will evaluate submissions based on criteria such as project management approach, staff experience, and familiarity with water system projects. The firm chosen will serve as the Engineer-of-Record and will be responsible for ensuring the project meets all technical, safety, and regulatory standards while adhering to the funding requirements and project timeline.

General Info

Place of Performance

NY, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstrfq
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Concept and Detailed Design ServicesOpen now, due in 199 days
  • Architectural Design & EngineeringOpen now, due in 29 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNew York → Ovid, Village of
ContactsNo contacts available
OfficeN/A
Organization / AgencyNew York → Ovid, Village of
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The Village of Ovid is issuing this Request for Qualifications for the qualifications-based procurement of an engineering firm to assist with engineering tasks associated with the Village’s Water Source and Distribution System Improvements project.                                                                                            Utilizing a qualifications-based process, the Village will select a consulting engineering firm licensed in the State of New York to design, bid, construct and close out the project as needed.   The Village of Ovid owns and operates community water system NY4901195, which currently has an average daily demand of 81,300 gallons per day (gpd). The primary water source for the Village is Seneca Lake, which has experienced an increase in Harmful Algal Blooms (HABs). In recent years, including sightings near the raw water intake. In the event of a HAB affecting the raw water, the Village lacks an alternative potable water supply. While the Village has two shallow dug wells on East Seneca Street as an emergency water source, they are not suitable for potable water due to their classification as Groundwater Under the Direct Influence of Surface Water (GWUDI) and the absence of adequate water treatment. Furthermore, these wells have elevated levels of Nitrates, occasionally exceeding Maximum Contaminant Levels (MCL). The Village also faces challenges in maintaining acceptable concentrations of Total Trihalomethanes (TTHMs) in the water storage tank. To mitigate this issue, the current practice involves dumping finished water in an attempt to freshen the storage tank. The Village has had frequent water main breaks and has approximately 2,430 linear feet of 4” CIP water mains on Main and West Seneca Streets that should be replaced due to poor condition.   The Village is now seeking an engineering firm to design, administer, construct and closeout the project as needed. The Village received notification from the Environmental Facilities Corporation (EFC) that they are eligible for Bipartisan Infrastructure Law (BIL) grant funding of $3,106,717 and BIL interest-free loan funding of $1,331,450 with additional funds as needed through the Drinking Water State Revolving Fund (DWSRF)base program. The selected engineering firm will be responsible for complying with all funding agency requirements.  The Village may seek additional funding from other agencies as the project develops.   In keeping with these requirements, the qualifications-based procurement standards for the Procurement of Architectural, Engineering, and Surveying (A/E) Services shall apply. Utilizing a qualifications-based process, the Village will select a consulting engineering firm to design, bid, administer and close-out the Village’s water improvement project. Proposals will be received from all firms which wish to be considered for this engagement. CONSULTANT SELECTION CRITERIA   Consultants must demonstrate their level of competence and qualification, and each subcontractor’s level of competence and qualification, with respect to the listed evaluation factors for the needed services.    NOTE: These factors are not listed in order of importance.   Evaluation factors include:   Serve as Engineer-of-Record for the Village for this project. The ability of the selected firm to provide the technical skills necessary for capital improvement or maintenance projects, or to evaluate such projects on very short notice, and on an as-needed basis as determined by the Village. Size and experience of the consultant’s professional and technical staff with respect to the magnitude and complexity of various projects. Experience of the consultant’s professional staff with water plant design and plant operations and distribution improvements. The consultant’s ability to make practical water plant process evaluations and develop best practice treatment recommendations. Record of success by the consultant, demonstrated by work previously performed for the Village or similar work performed for others. Individual(s) within the consultant’s organization who will have direct charge of the work. Whether the consultant has adequate staff and/or other resources to perform the work within schedule and meet funding program MWBE requirements. The approach the consultant proposes to use for the work and to keep the project within budget and on schedule. Pertinent new ideas that may be presented by the consultant during the selection process. Whether the consultant has an effective quality control program. The consultant’s demonstrated record of keeping construction costs within project budgets and design estimates. Demonstrated ability to identify all necessary permits, regulatory requirements, and processes and obtain involved agency approvals. Understanding of the importance of safety in design and constructability. Demonstrated ability to run a diverse program including managing and coordinating schedules, deliverables, resources, and multiple consultants/subconsultants. Submission of a list of communities/clients, including contract information, for which similar services were provided over the last three years.   After initial review of the submittals, a short list of consultants will be developed for further consideration. These firms may be invited for an interview. The best qualified firm or firms will be selected based on its demonstrated competence and qualification for the services required for the project. A more detailed scope of work and fee schedule will be negotiated with the best qualified firm or firms. If negotiations are not successful with any selected firm, the Village will terminate negotiations with that firm and initiate negotiations with the next best qualified firm. When a fair and reasonable fee is established, a contract award recommendation will be made to the Village Board for its consideration.      Engineering Firm Insurance Requirements   The firm must meet the following insurance requirements.   Proof of Workers Compensation insurance coverage General Liability $1,000,000 per occurrence/$2,000,000 aggregate. The Village must be listed as additional insured and endorsement required. Auto Liability Insurance $1,000,000 per occurrence combined single limits applicable to claims due to bodily injury and/or property damage. The Village must be listed as additional insured and endorsement required. Professional Liability not less than $2,000,000 per loss.     PROJECT SCHEDULE   Below outlines the Request for Qualification Schedule.     DATE DESCRIPTION March 20, 2024 Request for Qualifications Advertised April 19, 2024 Statement of Qualifications Received April 29, 2024 Review Qualifications and Short List Consultants, Begin Interviews if needed. May 13, 2024 Award to Consultant at Village Board Meeting     SUBMISSION   Please provide a copy of your qualifications and related materials via electronic or hard copy. Proposals may be transmitted as an electronic file in a PDF format consisting of a Statement of Qualifications or a bound copy of your qualifications statement via mail in a sealed envelope no later than 2:00 pm, April 19, 2024, the submittal deadline date.  Please mark your response “REQUEST FOR ENGINEERING QUALIFICATIONS – VILLAGE OF OVID WATER PROJECT” and e-mail or send your response to:   Joan Hendrix, Clerk-Treasurer Village of Ovid 2136 Brown Street, Ovid, New York 14521 Email: Sign up to see this detail       PROPOSAL EVALUATION   The Village will review and rank the proposals using the factors /rating scale listed below to select the preferred consultant based on qualifications. Based upon the evaluation of the proposals, the Village reserves the right to invite any or all consultants for an interview before making a final selection.  Such an invitation does not commit the Village to pay any costs incurred in participating in said interview.           The evaluation factors are:   Knowledge and familiarity with the Village’s water systems.                                                                                             Maximum Points: 20   Project Management Approach: Response as outlined regarding the Firm’s Project Management Approach and the performance of the identified services as well as the timeliness of project deliverables.                                                                                                  Maximum Points: 25   Availability of Staff and Experience of the Project Team: Having the right team helps deliver a project within budget and on schedule. The Village will give considerable weight to the individual qualifications of the project team members who will be assigned to do a majority of the work identified. Considerations will include the individuals’ qualifications, experience, and location of key personnel.                                                                                             Maximum Points: 30   Experience with NYSEFC and other Federal/State Funded Projects: The Firm’s familiarity and experience in successfully satisfying funding agency construction documents and MWBE requirements will be reviewed and ranked.                                                                                                             Maximum Points: 25   Following the review of the Statement of Qualifications, no guarantee of work assignments or projects can be made, however, the assignment of projects will be based on the Village’s needs.   The selection of the consultant will be valid for a period of three (3) years from the date of Village Board approval and the Village reserves the right to renew the selected consultants for an additional three (3) years.                                                                   EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER   All qualified engineers will receive consideration without regard to race, color, religion, creed, sex, age, or national origin. The Village strongly encourages MWBE and Section 3 firms to submit.     RIGHTS   The Village shall be the sole judge of whether a submittal conforms to the requirements of this RFQ and of the merits and acceptability of the individual submittals.  Notwithstanding anything to the contrary contained herein, the Village reserves the right to take any of the following actions in connection with this RFQ: amend, modify or withdraw this RFQ; waive any requirements of this RFQ; require supplemental statements and information from any respondents to this RFQ; award a contract to as many or as few or none of the respondents as the Village may select; to award a contract to entities who have not responded to this RFQ; accept or reject any or all proposals received in response to this RFQ; extend the deadline for submission of proposals; negotiate or hold discussions with one or more of the respondents; permit the correction of deficient proposals that do not completely conform with this RFQ; waive any conditions or modify any provisions of this RFQ with respect to one or more respondents; reject any or all proposals and cancel this RFQ, in whole or in part, for any reason or no reason, in the Village’s sole discretion.  The Village may exercise any such rights at any time, without notice to any respondent or other parties and without liability to any respondent or other parties for their costs, expenses or other obligations incurred in the preparation.   Questions regarding this RFQ should be directed to:   Joan Hendrix, Clerk-Treasurer Village of Ovid 2136 Brown Street, Ovid, New York 14521 Email: Sign up to see this detail     Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 15% Women Owned Sub-Contracting Goal: 15% Service-Disabled Veteran-Owned Business Contracting Goal: 6% Disadvantaged Owned Sub-Contracting Goal: 6% Due date:04/19/2024 2:00 PM Contract term: Three year Contract County(ies): Seneca Location: Village of Ovid Water System Business entities awarded an identical or substantially similar procurement contract within the past five years: N/A

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS