Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Utah was posted on October 14, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Vineyard City Lift Station #2 Construction Upgrades Project

Closed
2025-52-102State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333413
New
DIBBS
41--FAN,VANEAXIAL
Solicitation # SPE8E9-27-T-0554
This contract is a Request for Quotations (RFQ) issued by DLA Troop Support, Construction & Equipment MRO SVC I for the procurement of nine vane axial fans, identified by NSN 4140-00-289-8885 and part number M18953-AA02WA4W6NANANA. The hardware must meet specific technical requirements, including a 440V AC three-phase power supply, a nominal air flow rate of 2000 cubic feet per minute, and clockwise rotation with outward flow. The item is designated as a critical application item and must comply with basic specification MIL-PRF-18953C(1) and quality assurance provision QAP 13873 QAP-EQ003. Additionally, the manufacturer must be Qualified Products List (QPL) approved at the time of award. Delivery is required within 318 days after order, with an original required delivery date of November 16, 2026, shipped FOB Destination to the DLA Distribution DDSP New Cumberland facility in Pennsylvania. The contract mandates strict adherence to MIL-STD-2073-1E for packaging and MIL-STD-129 for marking. Quality inspection will occur at the destination using sampling methods per MIL-STD-1916 or ASQ H1331, with a zero-non-conformance requirement for acceptance. Environmental restrictions prohibit the intentional use of mercury or Class I ozone-depleting chemicals. Administrative requirements include the use of the Wide Area WorkFlow (WAWF) system for invoicing and compliance with various FAR and DFARS clauses regarding cybersecurity, sustainable products, and small business representations.
CONSTRUCTION & EQUIPMENT MRO SVC I

POSTED

1 day ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The Vineyard City Lift Station #2 Construction Upgrades Project involves a comprehensive overhaul of the existing lift station infrastructure to enhance operational efficiency and reliability. The scope of work includes the removal of two existing dry-pit chopper pumps and variable frequency drives (VFDs), followed by the installation of four new dry-pit chopper pumps and VFDs. Additionally, the project entails constructing two new concrete pedestals, installing two mag flow meters, replacing valves and ductile iron piping and fittings, and upgrading pipeline supports and coatings. The upgrade also involves removing the existing wet well mixer, replacing the ultrasonic level sensor with a radar level sensor, and updating electrical components such as the exhaust fan, conduits, wiring, and the main control panel/RTU back panel. These improvements aim to modernize the lift station’s mechanical and electrical systems, ensuring better performance and easier maintenance. The project is publicly solicited through an Invitation for Bids (IFB) issued in October 2025, with a response deadline of November 7, 2025. The bidding process is managed via the Utah Public Procurement Place platform, with a pre-bid conference scheduled for October 21, 2025. The contract is estimated to be valued between $500,000 and $1,000,000 and is open to contractors capable of executing the specified upgrades according to detailed technical specifications and drawings prepared by Hansen, Allen & Luce, Inc. The bid documents include comprehensive instructions, technical specifications, contract forms, and conditions, emphasizing the importance of bid security and adherence to submission procedures. Overall, the project aims to modernize the lift station’s infrastructure to improve its operational capacity and ensure compliance with current standards.

Documents

2
PDF, High priority: read this first2 pages · ifb
High
PDF, High priority: read this first388 pages · ifb
High

Read all 2 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • FAN, TUBEAXIALOpen now, due in 11 days
  • FAN, TUBEAXIALOpen now, due in 11 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah → Vineyard City
ContactsNo contacts available
OfficeN/A
Organization / AgencyUtah → Vineyard City
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The Work includes the removal of two (2) existing dry-pit chopper pumps and VFDs, furnishing and installing four (4) new dry-pit chopper pumps and VFDs, two (2) new concrete pedestals, two new mag flow meters, new valves and ductile iron piping and fittings, replacement of an existing plug valve, pipe supports, pipeline coating, removal of existing wet well mixer, removal and replacement of existing wet ultrasonic level sensor with new radar level sensor, replacement of existing exhaust fan, electrical conduits and wiring, and replacement of main control panel/RTU back panel.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS