Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from New York was posted on October 29, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

VOFE Water System Improvements

Closed
18458State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

10 minutes ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer connections. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Performance is governed by EJCDC standard forms, including the C-700 General Conditions and C-800 Supplementary Conditions. The contractor is required to provide performance and payment bonds, as well as proof of insurance. Project timelines are triggered by a Notice to Proceed, and failure to achieve substantial completion will result in liquidated damages of 1,000 dollars per day. Payment is processed via applications for payment submitted to the Engineer, with terms due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

10 minutes ago

DEADLINE

in 11 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additionally, the project entails the rehabilitation of reactor mixers and aerators, replacement of motor control center components, modifications to sluice and slide gates, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to various small business set-asides, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Subcontractors are specifically requested for lead abatement, metals fabrication, painting, coatings, FRP reinforcing systems, and access hatches. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Quotes are due by November 17, 2026, and the final bid date is November 18, 2026. Contracts will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

10 minutes ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The project involves the comprehensive construction and upgrade of water infrastructure in the Village of Fort Edward, New York, encompassing two separate contracts. Contract 1 focuses on the installation of a new 200,000-gallon pedesphere water storage tank, including site preparation, foundation, inlet/outlet piping, water main connection, tank accessories such as mixers, level transducers, cathodic and lightning protection systems, and site improvements like gravel access roads, fencing, and gates. Following successful testing and disinfection, the existing tank will be decommissioned and demolished. The scope also includes modifications and upgrades to the existing booster pump station, excluding electrical work. Contract 2 covers all electrical systems associated with the new tank and pump station, including electrical service, wiring, conduits, lighting, SCADA integration for remote monitoring, and coordination with the general contractor for installation and commissioning. The overall schedule mandates substantial completion by April 30, 2027, with final site restoration due by December 31, 2027. The procurement is a sealed-bid process with specific requirements for bonding, bid security, and compliance with prevailing wage laws, including the Davis-Bacon Act and New York State wage regulations. A mandatory pre-bid conference is scheduled, and bids must be submitted by December 4, 2025. The project emphasizes socioeconomic goals, requiring a minimum of 20% MWBE participation, and mandates adherence to equal employment opportunity policies. The contract stipulates performance and payment bonds, and the work must meet all specifications, standards, and testing protocols for successful commissioning. While detailed evaluation criteria and pricing structures are not explicitly provided, the project’s scope, schedule, and compliance obligations are clearly defined, ensuring that the awarded contractors deliver a fully operational water storage and distribution system aligned with local and federal standards.

General Info

Place of Performance

All NYS counties, NY, USA

Set-Aside

NONE

Documents

1

001116 Invitation to Bid for Village of Fort Edward Water System Improvements

PDF, High priority: read this first2 pages · ifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNew York → Village of Fort Edward
Contacts3 people available
OfficeN/A
Office AddressN/A
Contacts
SuiteGlens Falls, NY 12801
Clerk-Treasurer118 Broadway
Clerk-Treasurer118 Broadway

Full Description

Show more
Contract 1 – General Construction: Furnish and install a new 200,000-gallon nominal pedesphere water storage tank, including but not limited to: site preparation and grading; installation of the concrete tank foundation; furnishing and installing inlet/outlet piping and a new water main to the tank; installation of a tank mixer, level transducer, cathodic protection system, lightning protection system, tank accessories and appurtenances, construction of a gravel access road, chain link fence and gate, and all associated site improvements. The tank shall be filled, disinfected, and tested in accordance with project specifications. Following successful commissioning of the new tank, the existing water storage tank shall be decommissioned and demolished as part of this contract. Work also includes modifications and upgrades to the existing booster pump station (excluding electrical work). Contract 2 – Electrical Construction: Furnish and install all electrical work associated with the new 200,000-gallon pedesphere water storage tank and modifications to the existing booster pump station. Work includes, but is not limited to: electrical service to tank, electrical conduits and wiring for tank mixer, level transducer, cathodic protection system, lightning protection system, and exterior and interior tank lighting; electrical connections and modifications associated with booster pump station upgrades; integration of SCADA control components and instrumentation for remote monitoring and control of the new tank and booster pump station; coordination with General construction Contractor for equipment installation; and all testing, calibration, and commissioning required to deliver a fully functional and integrated electrical and control system. Service-Disabled Veteran-Owned Set Aside: No Total MWBE Participation Goals: 20% Due date:12/04/2025 10:00 AM Contract term: 4/30/2027 County(ies): All NYS counties Location: Northeast Quadrant of the Village of Fort Edward Business entities awarded an identical or substantially similar procurement contract within the past five years: none

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS